Y -- UPGRADE INSULATION BLDG 50 AT HZ CONSTRUCTION PROJECT 646-11-117 - Attachment

Notice Date
8/15/2012
 
Notice Type
Attachment
 
NAICS
238310 — Drywall and Insulation Contractors
 
Contracting Office
Department of Veterans Affairs;VA Pittsburgh Healthcare System;Acquisitions (90A);1010 Delafield Road;Pittsburgh PA 15215-1802
 
ZIP Code
15215-1802
 
Solicitation Number
VA24412R0211
 
Response Due
8/20/2012
 
Archive Date
10/19/2012
 
Point of Contact
William J Matelan
 
E-Mail Address
822-3769<br
 
Small Business Set-Aside
Service-Disabled Veteran-Owned Small Business
 
Description
AMENDMENT #9 Because of the following changes/clarifications, the due date for proposals will be extended. PROPOSALS ARE DUE NO LATER THAN 3:00 PM (EASTERN) ON MONDAY, AUGUST 20, 2012 1.GROUND NORTH, INSTEAD OF BEING TURNED OVER TO THE CONTRACTOR IN ITS ENTIRETY, MUST BE COMPLETED IN THE SAME THREE-PHASED MANNER AS GROUND SOUTH AND ONE SOUTH REPLACE THE FOLLOWING STATEMENTS ON PAGE 6/7 : Scheduling and implementation of construction and construction related work shall not disturb patient care, compromise the inpatient environment, living standard, nor interfere with Community Living Center operation. "Each of the units is separated into three wings. For work being completed on Ground South and 1 South, contactor must phase the work to close one wing at a time so patients do not have to be relocated off the unit. The contractor may complete 1 wing on Ground South and 1 South at the same time just not multiple wings on the same floor at the same time. The VA will relocate each wing to consolidate patients into the other two wings during construction. Contractor must provide a schedule to allow the VA 3 weeks between each wing (phase) for patient relocation and appropriate construction barriers to be built. The intention of this requirement is to provide a secure and safe environment for the patients that are being relocated during each phase. "Ground North can be completed without phasing and the entire unit will be turned over to the contractor. Work cannot begin on this unit until January 2014. WITH THE FOLLOWING: Scheduling and implementation of construction and construction related work shall not disturb patient care, compromise the inpatient environment, living standard, nor interfere with Community Living Center operation. Each of the units is separated into three wings. For work being completed on Ground South, One South, and Ground North contactor must phase the work to close one wing at a time so patients do not have to be relocated off the unit. The contractor may complete 1 wing on each unit at the same time; just not multiple wings on the same floor at the same time. The VA will relocate each wing to consolidate patients into the other two wings during construction. Contractor must provide a schedule to allow the VA 3 weeks between each wing (phase) for patient relocation and appropriate construction barriers to be built. The intention of this requirement is to provide a secure and safe environment for the patients that are being relocated during each phase. 2.All patient lifts are manufactured and installed by ARJO 3.Screen-printed radiant panels have been provided for other local VA projects 4.With regards to Ground North: all wall covering should be removed from the affected areas and the walls are to be prepared to receive paint. Paint should be Navajo White by Sherwin Williams or Equivalent. Cubicle curtain tracks are to remain the same, and the contractor is to match the existing layout.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/VA/PiVAMC646/PiVAMC646/VA24412R0211/listing.html)
 
Document(s)
Attachment
 
File Name: VA244-12-R-0211 VA244-12-R-0211_13.docx (https://www.vendorportal.ecms.va.gov/FBODocumentServer/DocumentServer.aspx?DocumentId=442242&FileName=VA244-12-R-0211-026.docx)
Link: https://www.vendorportal.ecms.va.gov/FBODocumentServer/DocumentServer.aspx?DocumentId=442242&FileName=VA244-12-R-0211-026.docx

 
Note: If links are broken, refer to Point of Contact above or contact the FBO Help Desk at 877-472-3779.
 
Record
SN02840741-W 20120817/120816000457-cb7af9e4b09e5912b0708bf8eb79634e (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.