Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY ISSUE OF SEPTEMBER 06, 2012 FBO #3939
SOLICITATION NOTICE

L -- Over and Above Sustainment Services for Sole Source SAIC NIIS in southwest Asia - Package #1

Notice Date
9/4/2012
 
Notice Type
Combined Synopsis/Solicitation
 
NAICS
541690 — Other Scientific and Technical Consulting Services
 
Contracting Office
General Services Administration, Federal Acquisition Service (FAS), Acquisition Operations Division (1QZA), 10 Causeway Street, Room 1085, Boston, Massachusetts, 02222, United States
 
ZIP Code
02222
 
Solicitation Number
ID01120036
 
Archive Date
9/28/2012
 
Point of Contact
David Feit, Phone: 6175656733, Lorraine LaFleur, Phone: 617.565.5437
 
E-Mail Address
david.feit@gsa.gov, lorraine.lafleur@gsa.gov
(david.feit@gsa.gov, lorraine.lafleur@gsa.gov)
 
Small Business Set-Aside
N/A
 
Description
Sole Source J&A - SAIC Over and Above NIIS Sustainment Services in southwest Asia PWS - SAIC Over and Above NIIS Sustainment Services in southwest Asia RFP - SAIC Over and Above NIIS Sustainment Services in southwest Asia 1. S ee Performance Work Statement for detailed discussion of Sustainment Services requirements 2. Over and Above work (force majeure); see 252.217.7028 As described in the PWS, repairs beyond the scope of standard maintenance and sustainment, be addressed on either a Firm-Fixed-Price or Time-and-Materials basis as appropriate to the particular scope of work. No work is to be done without the express authorization of the Contracting Officer. When the need arises, the contractor shall develop an estimate based either on a Firm-Fixed-Price or on the Time - and - Materials rates and prices established in the acquisition, which the Government may accept, reject or negotiate. To the maximum extent practicable, the contractor shall utilize (without additional charges) the existing labor force available under the concomitant sustainment task order (GS-07F-0210J / GST0112BK0019). 3. Refurbishment As described in the PWS, the Government may require existing systems to be refurbished. No work is to be done without the express authorization of the Contracting Officer. When the need arises, the contractor shall develop an estimate based either on a Firm-Fixed-Price or on the Time - and - Materials rates and prices established in the acquisition, which the Government may accept, reject or negotiate.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/notices/645f7a34b201786d3f4128bbb3c13f3b)
 
Record
SN02867393-W 20120906/120905001407-645f7a34b201786d3f4128bbb3c13f3b (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.