Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY ISSUE OF SEPTEMBER 26, 2012 FBO #3959
SOLICITATION NOTICE

Y -- WY HPP 4-1(7), Beartooth Highway

Notice Date
9/24/2012
 
Notice Type
Presolicitation
 
NAICS
237310 — Highway, Street, and Bridge Construction
 
Contracting Office
Department of Transportation, Federal Highway Administration (FHWA), Central Federal Lands Highway Division, 12300 West Dakota Avenue, Lakewood, Colorado, 80228
 
ZIP Code
80228
 
Solicitation Number
DTFH68-12-B-00012
 
Archive Date
12/8/2012
 
Point of Contact
Aaron L. Sanford, Phone: 7209633090, Jeremiah B. Rogers, Phone: 7209633090
 
E-Mail Address
cflcontracts@dot.gov, jeremiah.rogers@dot.gov
(cflcontracts@dot.gov, jeremiah.rogers@dot.gov)
 
Small Business Set-Aside
N/A
 
Description
THIS PROJECT WILL BE ADVERTISED ON A FULL AND OPEN (UNRESTRICTED) BASIS. PLANS AND SPECS WILL NOT BE AVAILABLE UNTIL THE TENTATIVE ADVERTISEMENT DATE OF OCTOBER 9, 2012. Project Details: The Beartooth Highway Reconstruction Project, along U.S. 212 in Park County, Wyoming, begins at KP 50.8 (mp 31.6) just east of the Long Lake outlet bridge and terminates at milepost 30.7 just west of Forest Service Road 151. The project occurs at a high elevation (exceeding 9,000ft), environmentally sensitive area with seasonal road closures. The work consists of grading, paving, drainage, bridges, retaining walls, pullouts and interpretive sites, wetland reclamation, and site specific revegetation seeding and plantings. Major bid items include (approximate): 4 ha grubbing and selective clearing; 8,500 m3 roadway excavation; 6,000 m3 unclassified borrow, 3,600 t aggregate base; 3,900 t superpave ACP; 180 m various size culvert pipe; 300 m guardrail systems; 300 m3 placing conserved topsoil; 5 ha various hydraulic seeding mixes; 3 ha hydraulic bonded fiber matrix mulch; 1 bridge removal; 170m concrete box beam bridge; 40,000kg reinforcing steel, lump sum contractor testing; contractor surveying; signing and pavement markings; erosion control; traffic control. It is anticipated that this project will be advertised on October 9, 2012. The contracting range for this project is between $4 million and $6 million. Construction is expected to occur in one season (typically June through October).
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/DOT/FHWA/68/DTFH68-12-B-00012/listing.html)
 
Place of Performance
Address: Park County, Wyoming, 82190, United States
Zip Code: 82190
 
Record
SN02895696-W 20120926/120925001457-a30e87415818c7ec6cc04d1bd1084cad (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.