FBO DAILY ISSUE OF SEPTEMBER 29, 2012 FBO #3962
AWARD

A -- Hydraulic Conductivity Test Setup

Notice Date
9/27/2012
 
Notice Type
Award Notice
 
NAICS
541712 — Research and Development in the Physical, Engineering, and Life Sciences (except Biotechnology)
 
Contracting Office
N00244 NAVSUP Fleet Logistics Center San Diego Seal Beach Office 800 Seal Beach Blvd. Bldg 239 Seal Beach, CA
 
ZIP Code
00000
 
Solicitation Number
N0024412T0300
 
Response Due
9/17/2012
 
Archive Date
10/12/2012
 
Point of Contact
Michael Kutner
 
E-Mail Address
Use this email to contact the Contract Specialist
(michael.kutner@navy.mil)
 
Small Business Set-Aside
N/A
 
Award Number
N00244-12-P-1358
 
Award Date
9/27/2012
 
Awardee
Spectrolite Technology, Inc.<br />
 
Award Amount
$32,765.00
 
Line Number
0001
 
Description
STATEMENT OF WORK Fabrication Of Compaction-Mold Permeameter For Measurement Of Hydraulic Conductivity 1.0 SCOPE 1.1 NAVFAC-ESC would like to evaluate a new Cathodic Protection Anode Product, EnvirAnodeTM for benefits in containing cross contamination of underground aquifers. 1.2 The scope of work is to fabricate a full-scale replica of a deep well anode installation to measure water permeability of the EnvirAnodeTM. Specifically the experimental setup should replicate the soil, drilling and filling conditions typical of an anode installation for an ICCP system. 1.3 The setup will allow the user to make quantitative measurements of the water leakage through the anode installation. This is quantified by measuring the hydraulic conductivity or coefficient of permeability. 2.0 TECHNICAL REQUIREMENTS 2.1 The vendor shall provide a CAD drawing of the proposed design. 2.2 The setup should meet the following requirements 2.2.1 It shall comply with accepted testing standards for soil permeability measurements as given by ASTM D5856-95 or ASTM 5084-10. 2.2.2 It shall incorporate a method to control the hydraulic head for testing 2.2.3 It shall include sensors and a data logger for recording of the test data 2.2.4 It shall have an interchangeable permeameter ring that holds the test sample and sealed via gaskets at the top and bottom with clamped plates. 2.2.5 The setup shall use automated controls integrated to the data logger with a touch screen user interface. 2.3 The vendor shall provide three permeameter or test sample chambers as follows 2.3.1 The first permeameter shall contain a soil sample, compacted and shown to have hydraulic conductivity of less than 1x10-7 cm/sec 2.3.2 The second permeameter shall contain a fully cured conductive concrete using Conducrete ®. 2.3.3 The third permeameter shall contain a soil compacted and measured to have a hydraulic conductivity of less than 1x10-7 cm/sec, a hole drilled through and filled with Conducrete ®. 2.3.4 The permeameter shall be a minimal of 20" in diameter, have a height of >4" 2.3.5 The inner side walls of all three permeameter rings shall be coated with a thin layer of sodium bentonite paste to minimize side-wall leakage. 2.4 The sensors, data acquisition, and controller interface shall include as a minimal 2.4.1 Pressure transducers 2.4.2 Flow Measurement system 2.4.3 Data acquisition and monitoring 2 2.4.4 Temperature measurement and control to ±3 °C 2.4.5 A compact touch screen interface to run the experiment automatically, and to display the measurements in real time. 2.4.6 Data Acquisition will use a web browser interface to allow compatibility with windows, iOS, and android operating systems. 2.5 The vendor shall supply all materials and hardware sufficient to perform the permeability measurement to include: 2.5.1 Hydraulic pump to provide required head pressures 2.5.2 Data Acquisition hardware and screen interface 2.5.3 All necessary sensors to enable performance of ASTM D5856 or ASTM 5084 testing, which will include temperature, pressure, and flow sensors. 2.5.4 Data Acquisition storage capacity of at least 32Gb 2.5.5 Soil, Conducrete ®, and EnvirAnode ® for testing. 3.0 GOVERNMENT FURNISHED MATERIAL (GFM) None 4.0 TRAVEL Travel and associated travel costs should be included in total cost to government. 5.0 OTHER 5.1 Security Personnel performing on this task do not require a security clearance. 5.2 Place of Performance 5.2.1 Fabrication will take place at the contractor site. 5.3 Deliverables 5.3.1 A functioning test setup which is compatible with ASTM D5856 or ASTM 5084 standards for testing of hydraulic conductivity. 5.3.2 A Data Acquisition system to include hardware and functioning codes to allow performance of the hydraulic conductivity measurements.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/DON/NAVSUP/280/N0024412T0300/listing.html)
 
Record
SN02901248-W 20120929/120927235707-917d546a3f89dcf6fea09dea25e49b9b (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.