SOLICITATION NOTICE
Y -- WY PFH 26-1(3), SAGE CREEK ROAD
- Notice Date
- 10/2/2012
- Notice Type
- Presolicitation
- NAICS
- 237310
— Highway, Street, and Bridge Construction
- Contracting Office
- Department of Transportation, Federal Highway Administration (FHWA), Central Federal Lands Highway Division, 12300 West Dakota Avenue, Lakewood, Colorado, 80228
- ZIP Code
- 80228
- Solicitation Number
- DTFH68-12-B-00015
- Archive Date
- 1/15/2013
- Point of Contact
- Aaron L. Sanford, Phone: 7209633090, Jason J Longshore, Phone: 7209633090
- E-Mail Address
-
cflcontracts@dot.gov, cflcontracts@dot.gov
(cflcontracts@dot.gov, cflcontracts@dot.gov)
- Small Business Set-Aside
- N/A
- Description
- THIS PROJECT WILL BE ADVERTISED ON A FULL AND OPEN (UNRESTRICTED) BASIS. PLANS AND SPECIFICATIONS ARE NOT YET AVAILABLE. THE TENTATIVE ADVERTISEMENT DATE FOR THIS PROJECT IS OCTOBER 16, 2012. PLANS AND SPECIFICATIONS WILL BE AVAILABLE AT THAT TIME. PROJECT DETAILS: WY PFH 26-1(3), SAGE CREEK ROAD WY PFH 26-1(3) Sage Creek Road ( State Highway 71, County Road 401, Forest Highway 26) begins in Rawlins Wyoming and proceeds south for approximately 53.4 miles to the intersection of Wyoming State Highway 70. This project begins approximately 26 miles south of Rawlins, Wyoming and terminates at Wyoming State Highway 70. Portions of the project are located in elevations reaching 8100 feet, anticipated construction season of 6-7 months. The work associated with this project consists of excavation and embankment, grading, drainage, aggregate surfacing and incidental roadway improvements primarily along the existing alignment. There are two schedules and one option associated with this project. Schedule A begins 44.5 miles south of Rawlins and ends 53.1 miles south of Rawlins (approximately at State Highway 70). Principal work items for Schedule A include: 34,000 CY of roadway excavation, 20,500 sf of gabions, 57,500 tons of aggregate surfacing, 6 concrete headwalls, 1700 feet of 18 inch to 48 inch culvert, 50 feet of 108 inch culvert, 70 feet of 102 inch elliptical culvert, 2600 CY of riprap, clearing and grubbing, placing of conserved topsoil, soil erosion control, seeding and mulching, fencing and survey and staking. Schedule B begins 38.2 miles south of Rawlins and ends 53.1 miles south of Rawlins (approximately at State Highway 70). Principal work items for Schedule B include: 103,000 CY of roadway excavation, 20,500 sf of gabions, 99,500 tons of aggregate surfacing, 10 concrete headwalls, 3000 feet of 18 inch to 48 inch culvert, 50 feet of 108 inch culvert, 70 feet of 102 inch elliptical culvert, 150 feet of 90 inch culvert, 4,075 CY of riprap, clearing and grubbing, placing of conserved topsoil, soil erosion control, seeding and mulching, fencing and survey and staking. Option X begins 26 miles south of Rawlins and ends 38.253.1 miles south of Rawlins. Principal work items for option X include: 206,000 CY of roadway excavation, 81,000 tons of aggregate surfacing, 8 concrete headwalls, 1300 feet of 18 inch to 48 inch culvert, 80 feet of 90 inch culvert, 3500 CY of riprap, clearing and grubbing, placing of conserved topsoil, soil erosion control, seeding and mulching, fencing and survey and staking. It is anticipated that this project will be advertised October 16, 2012 with construction to begin in April, 2013 and end in November, 2013. The contracting range for this project is between $15 million and $20 million.
- Web Link
-
FBO.gov Permalink
(https://www.fbo.gov/spg/DOT/FHWA/68/DTFH68-12-B-00015/listing.html)
- Place of Performance
- Address: Medicine Bow National Forest, Rawlins, Wyoming, 82301, United States
- Zip Code: 82301
- Zip Code: 82301
- Record
- SN02906755-W 20121004/121002234911-8002b8ec782afb4cee086a2b8c645d9e (fbodaily.com)
- Source
-
FedBizOpps Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's FBO Daily Index Page |