MODIFICATION
V -- TUGBOAT SERVICES (CONTINUOUS) FOR THE PORTSMOUTH NAVAL SHIPYARD (3mo)
- Notice Date
- 10/23/2012
- Notice Type
- Modification/Amendment
- NAICS
- 488330
— Navigational Services to Shipping
- Contracting Office
- N00189 NAVSUP Fleet Logistics Center Norfolk Portsmouth Naval Shipyard Annex Building 153, 6th Floor Portsmouth, NH
- ZIP Code
- 00000
- Solicitation Number
- N0018913RPB01
- Response Due
- 10/31/2012
- Archive Date
- 10/31/2013
- Point of Contact
- Emily Bateman 207-438-6819
- E-Mail Address
-
Contract Specialist
(emily.bateman@navy.mil)
- Small Business Set-Aside
- N/A
- Description
- **MODIFICATION 10/23/12 ** THE NAICS CODE IS CHANGED FROM 483113 TO 488330** N00189-13-R-PB01 THE PORTSMOUTH NAVAL SHIPYARD INTENDS TO SOLICIT FOR CONTINUOUS TUGBOAT SERVICES. THE PERIOD OF PERFORMANCE WILL BE 19 NOVEMBER 2012 THROUGH 18 FEBRUARY, 2013. SOLICITATION DOCUMENTS TO FOLLOW. THIS WILL BE A BRIDGE CONTRACT TO EXTEND CURRENT SERVICES, IN ANTICIPATION OF A SOLICITATION FOR THE COMPETITION OF A LONG TERM CONTRACT REQUIREMENT. THIS REQUIREMENT IS SOLE SOURCED TO MORAN TOWING DUE TO THEIR EXTENSIVE KNOWLEDGE OF THE REQUIRED SERVICE, THEIR EXISTING PRESENCE IN THE AREA, AND THE FACT THAT THEY HOLD THE CURRENT CONTRACT FOR SERVICE. A COMPETITIVE ACQUISITION FOR A THREE TO FIVE YEAR CONTRACT WILL BE POSTED AROUND 14 DECEMBER 2012. PORTSMOUTH NAVAL SHIPYARD REQUIRES ROUTINE/DEDICATED TUGBOAT SERVICES FOR DOCKING, UNDOCKING, LAUNCHING, MOORING AND RELATED SERVICES FOR SEAGOING VESSELS FOR PORTSMOUTH, NH ALONG THE PISCATAQUA RIVER. CONTRACTOR SHALL BE CAPABLE OF CONTINUOUSLY PROVIDING TO TWO (2) TUG BOATS. EACH TUG BOAT WILL HAVE A MINIMUM OF 1600 HORSEPOWER (HP). BOTH TUGBOATS SHALL BE EQUIPPED WITH A FENDERING SYSTEM SUITABLE FOR PROVIDING SAFE MOVEMENT OF A SUBMARINE UNDER ANY COMBINATION OF ROLL, HEAVE, OR PITCH. UNDER NORMAL/ROUTINE CIRCUMSTANCES, THESE SERVICES WILL BE PROVIDED WITHIN FOUR (4) HOURS OF BEING NOTIFIED OF REQUIRED SERVICES. IN THE HIGHLY UNLIKELY EVENT OF AN EMERGENCY, UPON REQUEST FROM PORTSMOUTH NAVAL SHIPYARD, THE CONTRACTOR SHALL: (A) BE CAPABLE OF RESPONDING WITHIN ONE (1) HOUR (FROM THE TIME OF NOTIFICATION TO BEING ON SITE AND READY FOR MANEUVERING) WITH TWO FENDERED 1600 MINIMUM HORSEPOWER TUGBOATS TO SUPPORT MANEUVERING A SUBMARINE, (B) AND THE TUGBOATS WILL BE FOR THE EXCLUSIVE USE BY PORTSMOUTH NAVAL SHIPYARD TO SUPPORT THE EMERGENCY MANEUVERING.
- Web Link
-
FBO.gov Permalink
(https://www.fbo.gov/spg/DON/NAVSUP/N00189PNH/N0018913RPB01/listing.html)
- Record
- SN02917742-W 20121025/121023233801-8aa7a18f64d04e577fc7295efbb8c728 (fbodaily.com)
- Source
-
FedBizOpps Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's FBO Daily Index Page |