Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY ISSUE OF DECEMBER 14, 2012 FBO #4038
MODIFICATION

Z -- Install Siding on Weather Shelters - Amendment 1

Notice Date
12/12/2012
 
Notice Type
Modification/Amendment
 
NAICS
#238160 — Roofing Contractors
 
Contracting Office
Department of the Air Force, US Central Command Air Force/A4-LGCP, 376 AEW/ECONS, Kyrgyzstan, 376 AEW/ECONS, APO, 09353
 
ZIP Code
09353
 
Solicitation Number
FA5707-13-R-0004
 
Point of Contact
Johnathan Anderson, Phone: 0702-572-082, Zakk Young, Phone: 0772-555-118
 
E-Mail Address
john.anderson1@maab.afcent.af.mil, zakk.young@maab.afcent.af.mil
(john.anderson1@maab.afcent.af.mil, zakk.young@maab.afcent.af.mil)
 
Small Business Set-Aside
N/A
 
Description
1) The purpose of this amendment is to correct verbiage in FAR Clause 52.236-27 Site Visit (Construction) - Alternate I Paragraph (c) and The 376 Expeditionary Contracting Squadron intends to award a single, firm fixed price contract to provide all labor, materials, tools, equipment, supplies, supervision, and all other items necessary to complete the Install Siding On Weather Shelters project in accordance with the attached statement of work dated 24 November 2012 and all associated documents and drawings. The firm is required to provide all services necessary for the construction of this project. The principal features of work for this project are the installation of steel columns, replacement and new installation of metal siding, and saw cutting of curbing. The Contractor shall be responsible for any necessary surveys, excavations, soil boring, soil analyses, chemical tests, laboratory tests, pressure tests, electrical tests, corrosion and cathodic protection tests, asbestos and lead based paint surveys, and any other tests required for complete construction of the project. The contractor shall be responsible for locating all utilities in the area of construction, and for accommodating or modifying them, as required for the construction of this project. The Contractor shall be responsible for demolition of existing facilities as required to complete Contract Work. Construction project magnitude is between $25,000.00 and $100,000.00 USD. (1,101,585 COM and 4,406,340 COM) (Exchange Rate 44.0634 com = $1USD) Total Performance Period for Construction and Design is 45 calendar days after receipt of Notice to Proceed. This procurement is not being set aside. All responsible sources may submit a proposal. Contract award will be determined using the Source Selection procedures in FAR Par 15. Please acknowledge all requirements in proposals. NO PARTIAL QUOTES WILL BE CONSIDERED. NO PARTIAL AWARDS WILL BE MADE. No response to this notice is necessary. This notice does not obligate the Government to award a contract nor does it obligate the Government to pay for any bid/proposal preparation costs.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/USAF/USCENTAF/376AEWECONS/FA5707-13-R-0004/listing.html)
 
Place of Performance
Address: Transit Center Manas, 09353, Kyrgyzstan
 
Record
SN02947944-W 20121214/121212235224-0a6eae4dbafb95c201c731a161377a92 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.