Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY - FEDBIZOPPS ISSUE OF JANUARY 24, 2013 FBO #4079
MODIFICATION

C -- Sitka Administrative Office Design Services

Notice Date
1/22/2013
 
Notice Type
Modification/Amendment
 
NAICS
541310 — Architectural Services
 
Contracting Office
Department of Agriculture, Forest Service, R-6 Northwest Contracting Area, Gifford Pinchot NF, 10600 NE 51st Circle, Vancouver, Washington, 98682, United States
 
ZIP Code
98682
 
Solicitation Number
AG-05K3-S-13-0005
 
Point of Contact
Justin C Holder, Phone: 360 891-5082, STEVONNE FULLER, Phone: 3608915085
 
E-Mail Address
jholder@fs.fed.us, scfuller@FS.FED.US
(jholder@fs.fed.us, scfuller@FS.FED.US)
 
Small Business Set-Aside
Total Small Business
 
Description
RESPONSES TO INQUIRIES -Many inquiries have been received regarding what portion of the work must be completed by the prime contractor. The following clause will be included in the awarded contract and outlines the limitations regarding subcontracting: Limitations on Subcontracting (Nov 2011) (a) This clause does not apply to the unrestricted portion of a partial set-aside. (b) Applicability. This clause applies only to- (1) Contracts that have been set aside or reserved for small business concerns or 8(a) concerns; (2) Part or parts of a multiple-award contract that have been set aside for small business concerns or 8(a) concerns; and (3) Orders set aside for small business or 8(a) concerns under multiple-award contracts as described in 8.405-5 and 16.505(b)(2)(i)(F). (c) By submission of an offer and execution of a contract, the Offeror/Contractor agrees that in performance of the contract in the case of a contract for- (1) Services (except construction). At least 50 percent of the cost of contract performance incurred for personnel shall be expended for employees of the concern. (2) Supplies (other than procurement from a nonmanufacturer of such supplies). The concern shall perform work for at least 50 percent of the cost of manufacturing the supplies, not including the cost of materials. (3) General construction. The concern will perform at least 15 percent of the cost of the contract, not including the cost of materials, with its own employees. (4) Construction by special trade contractors. The concern will perform at least 25 percent of the cost of the contract, not including the cost of materials, with its own employees. (End of clause) -Inquiries have been received regarding requirements for the registration of designers, and specifically, do the documents need to be stamped by an engineer licensed in the state of Alaska. The following clause will be included in the awarded contract and addresses this issue: Requirements for Registration of Designers (June 2003) Architects or engineers registered to practice in the particular professional field involved in a State, the District of Columbia, or an outlying area of the United States shall prepare or review and approve the design of architectural, structural, mechanical, electrical, civil, or other engineering features of the work. (End of clause) -Multiple inquiries have been made regarding the magnitude of the construction project associated with the design this action will procure. The estimated cost of construction is between $2.5 million and $5.0 million.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/USDA/FS/05K3/AG-05K3-S-13-0005/listing.html)
 
Place of Performance
Address: Gifford Pinchot National Forest, 10600 NE 51st Circle, Vancouver, Washington, 98682, United States
Zip Code: 98682
 
Record
SN02969420-W 20130124/130122233809-36f30665235fd315ab2e763b5ceb50b3 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.