Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY - FEDBIZOPPS ISSUE OF JANUARY 31, 2013 FBO #4086
MODIFICATION

Z -- Boring and Pin Fabrication - Clearance Dimensions

Notice Date
1/29/2013
 
Notice Type
Modification/Amendment
 
NAICS
332710 — Machine Shops
 
Contracting Office
Department of the Army, U.S. Army Corps of Engineers, USACE District, St. Paul, Attn: CEMVP-CT, 180 East Fifth Street, St. Paul, Minnesota, 55101-1678, United States
 
ZIP Code
55101-1678
 
Solicitation Number
W912ES-13-T-0026
 
Archive Date
2/22/2013
 
Point of Contact
Justin H. Rose, Phone: 6512905422
 
E-Mail Address
justin.h.rose@usace.army.mil
(justin.h.rose@usace.army.mil)
 
Small Business Set-Aside
Total Small Business
 
Description
Clearance Dimensions * Can the C-Channel frame (that I assume is used as a hold down for the pin) be removed to provide access for our machine tool? THE C-CHANNEL YOU ARE REFERRING TO WILL BE REMOVED BY THE GOVERNMENT PRIOR TO THE CONTRACTOR BORING THE HOLE. THE GOVERNMENT WILL REMOVE THE C-CHANNEL IN ORDER TO REMOVE THE EXISTING PIN. * How will the anchor bar be secured to ensure that it does not move during machining and pin installation? THE GOVERNMENT WILL PIN THE MITER GATE IN PLACE AND STABILIZE THE GATE. THE GOVERNMENT WILL ALSO REMOVE THE PIN. * What is the distance between the bottom plate and the bottom of the concrete trough (dimension A on the attached sketch)? What is the overall depth of the trough (dimension B)? SEE THE ATTACHED SKETCH WITH DIMENSIONS. * May we use several bolt holes that attach the plates to the c-channels to secure our machine? THE CONTRACTOR MAY USE EXISTING BOLT HOLES IN THE C-CHANNEL BUT THEY MAY NOT DRILL NEW BOLT HOLES. * Is tack welding an acceptable method of securing the machine tool to the c-channels? NO WELDING IS ALLOWED ON THE C-CHANNEL. * We assume that the 0.25" lip on the pin should be maintained, meaning that if the diameter of the pin body increases to Ø7.25", the lip diameter will increase to Ø7.75". Is this assumption correct? YES. NEED SOME HEAD STICKOUT BUT EXACT DIMENSION NOT CRITICAL IT MUST STILL CLEAR THE EXISTING BOLTS. * Will 120V 20Amp or 240V electrical service be available for our use on site? THERE ARE 120VAC, 20 AMP RECEPTACLES AVAILABLE BUT THERE IS NOT A 240VAC AVAILABLE.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/USA/COE/DACA37/W912ES-13-T-0026/listing.html)
 
Place of Performance
Address: Lock & Dam 4, Highway 35 & Cedar Ave, Alma, Wisconsin, United States
 
Record
SN02974414-W 20130131/130129234319-e92358fa55788ff00ef443777ff90cc1 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.