SOLICITATION NOTICE
Z -- Mormon Island Auxiliary Dam (MIAD) Overlay
- Notice Date
- 2/4/2013
- Notice Type
- Presolicitation
- Contracting Office
- Bureau of Reclamation - MP - Regional Office 2800 Cottage Way, Room E-1905 Sacramento CA 95825
- ZIP Code
- 95825
- Solicitation Number
- R13PS20092
- Response Due
- 4/1/2013
- Archive Date
- 2/4/2014
- Point of Contact
- Rosana Yousef Goarji Contract Specialist 9169785004 ryousefgoarji@usbr.gov;
- E-Mail Address
-
Point of Contact above, or if none listed, contact the IDEAS EC HELP DESK for assistance
(EC_helpdesk@NBC.GOV)
- Small Business Set-Aside
- Total Small Business
- Description
- The Mid-Pacific Region of the Bureau of Reclamation intends to issue a Request for Proposals (RFP) for a firm fixed-price contract for Mormon Island Auxiliary Dam Overlay. This procurement is set-aside for Total Small Business concerns only. The work to be performed is described below. The applicable North American Industry Classification System (NAICS) Code is 237990 and the related small business size standard is $33.5M. This notice is not a request for proposal and the information presented in this announcement will not obligate the Bureau of Reclamation in any manner. The estimated cost of this project is between $25M and $100M. Work will be located approximately 2 miles east of Folsom, California in Sacramento and El Dorado Counties. Solicitation R13PS20092 will be posted to http://ideasec.nbc.gov on or about March 1, 2013. The date for receipt of offers will be approximately April 1, 2013. The solicitation must be downloaded at the above website; no paper copy of this solicitation will be distributed. Prospective contractors MUST be actively registered in the System for Award Management (SAM) database at http://www.sam.gov to be eligible for award. Questions concerning this solicitation should be directed to Rosana Yousef Goarji by email at ryousefgoarji@usbr.gov. PRINCIPAL COMPONENTS OF WORK: The Mormon Island Auxiliary Dam Overlay procurement is a heavy civil earth construction project. This project consists of a myriad of details required for construction that will change throughout the project based on location, time, and season. As an example, the dam has five distinct material zones with ten different zone configurations that will be affected by the contractor's means and methods. Based on the magnitude of this project, teaming arrangements are encouraged. The Government assumes that small businesses would be operating under some type of teaming arrangement. **Please note** Joint ventures can be made up of multiple small businesses and still be considered a small business under the exception to affiliation rule, provided they are not affiliated in ways other than in the proposed joint venture relationship for this procurement. The Offeror and Teaming Partners will require strong construction management, construction experience, and capabilities in simultaneous construction of zoned embankment dams at multiple locations. The project is situated such that the dam cannot be constructed from the ground-up across its entire length due to terrain, other design features and multiple stockpile locations, and import of offsite materials. The project's complexity, magnitude and quality requirements for the Safety of Dams work will require managers and supervisors with extensive experience and past performance managing and working on jobs of this type, scope and size. This work requires site preparation to include construction for development of contractor use areas; implementation of security measures; clearing and grubbing; development of water control and erosion measures; and excavation of existing embankments. The work also consists of importing approximately 450,000 cubic yards of processed filter and gravel drain material and development, sorting, processing, stockpiling and placement of 1 million cubic yards of shell-fill material from an existing waste/stockpile. The construction means and methods for the dam embankment construction will be traditional Reclamation requirements. Some of these requirements that are noteworthy include distinct zone separation, compaction of various zones including proper moisture content, coordination between adjacent zones due to lift thickness and contamination of adjacent zones, and quality control plan for all elements of the work. The offeror will be excavating at the toe of the existing dam to install drain systems consisting of pipe and filter material. This work involves extensive dewatering and unwatering of the work, foundation preparation, installation of pipe and inspection wells and zone backfill work activities. Site Restoration will include removal of haul roads and restoration of: haul roads, borrow areas, stockpile locations, use areas, placement of top soils, establishment of new vegetation, replacement of security barrier boulders, and long term SWPPP controls for the site. All responsible sources may submit a proposal which will be considered by the agency.
- Web Link
-
FBO.gov Permalink
(https://www.fbo.gov/notices/d4a72e8a4785cbc8d1cb52cbd7773420)
- Place of Performance
- Address: Work is located approximately 2 miles east of Folsom, California, in Sacramento and El Dorado Counties.
- Zip Code: 958251898
- Zip Code: 958251898
- Record
- SN02978546-W 20130206/130204233759-d4a72e8a4785cbc8d1cb52cbd7773420 (fbodaily.com)
- Source
-
FedBizOpps Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's FBO Daily Index Page |