SOLICITATION NOTICE
Y -- CO FLAP 742(5), Taylor River Road
- Notice Date
- 3/14/2013
- Notice Type
- Presolicitation
- NAICS
- 237310
— Highway, Street, and Bridge Construction
- Contracting Office
- Department of Transportation, Federal Highway Administration (FHWA), Central Federal Lands Highway Division, 12300 West Dakota Avenue, Lakewood, Colorado, 80228
- ZIP Code
- 80228
- Solicitation Number
- DTFH68-13-B-00007
- Point of Contact
- Jeremiah B. Rogers, Phone: 7209633090, Jason Longshore, Phone: 7209633090
- E-Mail Address
-
cflcontracts@dot.gov, cflcontracts@dot.gov
(cflcontracts@dot.gov, cflcontracts@dot.gov)
- Small Business Set-Aside
- N/A
- Description
- PROJECT DETAILS: CO FLAP 742(5), The Taylor River Road (Gunnison County Route 742) is located in Gunnison County, CO (approximately 20 miles northeast of Gunnison, CO). This project is the fifth phase of construction on the Taylor River Road. This segment of the construction starts in the town of Almont and extends to the northeast 5.85 miles. The proposed project is for full reconstruction and widening of the existing roadway. The primary scopes of work are: roadway excavation and embankment, rockery wall(s), rock buttress, aggregate base, superpave pavement, and drainage improvements. The project consists of one base schedule. Significant Quantities and Line Items: Line Item Unit Estimated Quantity Roadway Excavation CUYD 65,000 Waste CUYD 5,000 Rockery SQYD 61 Rock Buttress CUYD 129 Aggregate Base TON 25,000 Superpave Pavement TON 21,500 12-inch Pipe Culvert LNFT 460 18-Inch Pipe Culvert LNFT 70 24-inch Pipe Culvert LNFT 2,200 30-inch Pipe Culvert LNFT 490 36-inch Pipe Culvert LNFT 345 48-inch Pipe Culvert LNFT 160 Large rocks and boulders are prevalent along the entire route and will be encountered during earthwork and drainage operations. Weather conditions on this route are extreme; cold weather and snow are likely during spring, fall and winter months. Elevations range from 8,000 to 8,400 feet in elevation. Snow depths vary, and can be excessive. Snow pack and frost accumulation/recession timeframe vary year to year. It is anticipated that this project will be advertised in late March of 2013. The contracting range for this project is between $8 million and $12 million. Construction is expected to be completed by October 31, 2013.
- Web Link
-
FBO.gov Permalink
(https://www.fbo.gov/spg/DOT/FHWA/68/DTFH68-13-B-00007/listing.html)
- Place of Performance
- Address: The Taylor River Road (Gunnison County Route 742) is located in Gunnison County, CO (approximately 20 miles northeast of Gunnison, CO)., Gunnison, Colorado, 81230, United States
- Zip Code: 81230
- Zip Code: 81230
- Record
- SN03011995-W 20130316/130314234940-cb905bd32501ebf209f706d3a4a18bd9 (fbodaily.com)
- Source
-
FedBizOpps Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's FBO Daily Index Page |