AWARD
Y -- Garrison Dam Flood Control Tunnel Interior Repairs - MSC 11
- Notice Date
- 3/15/2013
- Notice Type
- Award Notice
- NAICS
- 237990
— Other Heavy and Civil Engineering Construction
- Contracting Office
- USACE District, Omaha, 1616 Capital Ave, Omaha, NE 68102-4901
- ZIP Code
- 68102-4901
- Solicitation Number
- W9128F-13-B-0001
- Response Due
- 1/23/2013
- Archive Date
- 4/14/2013
- Point of Contact
- Polina Poluektova, 402-995-2091
- E-Mail Address
-
USACE District, Omaha
(polina.a.poluektova@usace.army.mil)
- Small Business Set-Aside
- N/A
- Award Number
- W9128F-13-C-0004
- Award Date
- 3/15/2013
- Awardee
- KNIGHT CONST. & SUPPLY, INC. (056054380) <br> 28308 N CEDAR RD <br> DEER PARK, WA 99006-8357
- Award Amount
- $1,094,670.00
- Line Number
- All Basic & Option Items
- Description
- Project Description: (Approx. quantities) The base Contract work shall includes: removal and replacement of the Intake Structure gantry crane wire rope; removal of the east (left) side air seal on flood control tunnel regulating no. 7 and installation of new east (left) side air seal at the same gate with Government-supplied seal; removal and replacement of oil seals at each trunnion bearing for three (3) flood control tunnel regulating gates; evaluation of the trunnion bearing lubrication system for each gate; and removal and replacement of the top seal heating elements and covers on all three regulating gates. The trunnion bearing oiling system shall first be evaluated for leaks and other system defects; after the evaluation is complete, the oil shall be drained and replaced. All items removed shall become the property of the Contractor and shall be disposed of properly off Government property. The optional Contract work includes the manufacture of one (1) east (left) side regulating gate air seal; repair of the regulating gate trunnion bearing lubrication system based on the system evaluation performed as part of the Basic work; installation of new air supply lines to regulating gate seals; repair and repainting of the flood control tunnel gantry crane lifting beam; non-destructive testing (NDT) of welds on each of the three flood control tunnel regulating gates; and cleaning and repainting of the flood control tunnel articulation joint covers and plates.
- Web Link
-
FBO.gov Permalink
(https://www.fbo.gov/spg/USA/COE/DACA45/W9128F-13-B-0001/listing.html)
- Record
- SN03012794-W 20130317/130315234217-95c818f28e9ac7961b9569d389197a9c (fbodaily.com)