Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY - FEDBIZOPPS ISSUE OF MARCH 17, 2013 FBO #4131
DOCUMENT

Y -- 695-12-109SCIP, Correct FSES, Building 41 - Attachment

Notice Date
3/15/2013
 
Notice Type
Attachment
 
NAICS
236220 — Commercial and Institutional Building Construction
 
Contracting Office
Great Lakes Acquisition Center (GLAC);Department of Veterans Affairs;115 S 84th Street, Suite 101;Milwaukee WI 53214-1476
 
ZIP Code
53214-1476
 
Solicitation Number
VA69D13B0734
 
Response Due
7/17/2013
 
Archive Date
9/15/2013
 
Point of Contact
Leon Jutrzonka
 
E-Mail Address
4-4820<br
 
Small Business Set-Aside
Service-Disabled Veteran-Owned Small Business
 
Description
DESCRIPTION OF PROJECT: Scope of Work: Provide all labor, materials, tools, equipment, and supervision necessary to: Repair Masonry associated with the roof including repointing all deteriorated mortar joints at the backsides of the parapet walls. Remove existing roofing and install new synthetic slate or asphalt shingle roof. Remove and replace of all metal flashings associated with existing roof areas. Install new insulation where required. Repair deteriorated wood associated with roof including: cornices, eaves and soffits. Replace missing or badly deteriorated wood and treat with wood preservative to match historical conditions. Repair and replace all deteriorated wood associated with: decking, stairs, posts and railings and Veranda framing. Energy Efficiency Requirements: Federal Executive Order #13423 requires all energy efficient materials, equipment and systems to be evaluated and, if feasible, incorporated into V.A. projects. The A/E, prime contractor, and all subcontractors shall cooperate with the Federal Government in specifying, evaluating, documenting, purchasing, and installing energy efficient equipment that meet basic energy efficiency criteria established by the V.A. The Criteria can be defined as comparing total energy savings to total life cycle cost of the equipment. To accomplish this objective, the A/E shall produce an Energy Equipment Schedule comparing a description of each standard piece of equipment (or system) vs. a description of recommended efficient equipment (or system); including the estimated purchase price, estimated cost to install, maintain, and operate the equipment as well as the estimated annual energy usage and estimated useful life for each piece of equipment (or system). All design and installation will be in accordance with current VAMC, HVAC design guides, NEC, NFPA, ASHRAE 90.1, state, local, and all VA and federal codes. Provide energy savings equipment and design modifications for current energy usage to the most efficient and economical level possible
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/VA/VAGLHS/VAGLHCS/VA69D13B0734/listing.html)
 
Document(s)
Attachment
 
File Name: VA69D-13-B-0734 VA69D-13-B-0734_1.docx (https://www.vendorportal.ecms.va.gov/FBODocumentServer/DocumentServer.aspx?DocumentId=661157&FileName=VA69D-13-B-0734-000.docx)
Link: https://www.vendorportal.ecms.va.gov/FBODocumentServer/DocumentServer.aspx?DocumentId=661157&FileName=VA69D-13-B-0734-000.docx

 
Note: If links are broken, refer to Point of Contact above or contact the FBO Help Desk at 877-472-3779.
 
Record
SN03012914-W 20130317/130315234323-ee3decccfaa7bfac8df4043b1dc813f0 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.