Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY - FEDBIZOPPS ISSUE OF MARCH 23, 2013 FBO #4137
MODIFICATION

D -- Air Force Contracting Information Systems (AFCIS) - Amendment 3 - Amendment 2

Notice Date
3/21/2013
 
Notice Type
Modification/Amendment
 
NAICS
541511 — Custom Computer Programming Services
 
Contracting Office
Department of the Air Force, Air Force Materiel Command, AFLCMC - Hanscom, 9 Eglin Street, Hanscom AFB, Massachusetts, 01731, United States
 
ZIP Code
01731
 
Solicitation Number
FA8771-13-R-0002
 
Archive Date
7/1/2013
 
Point of Contact
Yolanda R. Dixon, Phone: 3344164533
 
E-Mail Address
yolanda.dixon@gunter.af.mil
(yolanda.dixon@gunter.af.mil)
 
Small Business Set-Aside
Competitive 8(a)
 
Description
FA8771-13-R-0002 Rev. 2 Request For Proposal Questions and Answers II 21 MARCH 2013 ADDITIONAL COMMENTS: 1. Reference to Expeditionary Combat Support System (ECSS) has been deleted from Performance Work Statement (PWS) paragraphs 2.4.10, 2.6.5, and 2.8.4 and Standard Form (SF)33 CLINs 0001, 1001, 2001, 3001, and 4001. Revised PWS 20 March 2013 is attached to the SF33. REVISED: PWS Section 2.4.10 Support current SPS XML standards for integration with Enterprise Resource Planning (ERP) solutions such as the Defense Enterprise Accounting and Management System (DEAMS), the General Fund Enterprise Business System (GFEBS), and the Defense Medical Logistics Standard Support System (DMLSS). REVISED: PWS Section 2.6.5 Support other SPS teams (such as adapter support team) with testing of other systems as required. REVISED: PWS Section 2.8.4 Provide analysis and support to integrate EAP procurement processes into Air Force and DoD Enterprise Resource Planning (ERP) solutions such as the Defense Enterprise Accounting and Management System (DEAMS), the Air Force Way I & II (AFWay I/II), and the DoD eMall System. REVISED: SF33 CLINs 0001, 1001, 2001, 3001, and 4001 This is a firm fixed price CLIN. The contractor shall furnish non-personal information technology services support to include but is not limited to, sustainment, upgrades, implementation, and integration of Standard Procurement System (SPS) and similar contract writing systems into the existing USAF/DoD contracting environment as described in the Air Force Contracting eBusiness Procedures (AFCEP) and Continuity of Operations Plan (COOP) (examples include eBusiness initiatives such as AFWay II, Defense Medical Logistics Supply System (DMLSS), etc). The contractor shall support existing contracting information systems (as implemented by the USAF) and continued technological transition throughout the contracting community. Services support shall be in accordance with the AFCIS PWS, 20 March 2013. 2. The following sentence has been deleted from PWS paragraph 3.1: Contractor shall provide a plan for maintaining technical currency with training and knowledge of the contracting field in order to provide the most current data to the field. REVISED: PWS Section 3.1 The Contractor shall provide personnel appropriate for the tasks identified in this PWS and have a working knowledge of the functional software process. 3. The following sentence has been revised in Section L, L-II, 13: REVISED: Proposals are limited to a maximum of twenty-five (25) pages, excluding Cover Page, Table of Contents, Executive Summary, and Technical Summary Template. In addition, the Past Performance and Cost/Price Volume do not count against the proposal page count. 4. The following sentence has been revised in Section L, L-II, 18: REVISED: The original proposal shall be identified as such. One signed copy shall be delivered via email no later than 4:00 PM. CST on 01 April 2013, to the addresses identified below. Clarifications of Air Force Contracting Information Systems FedBizOps Questions and Answers 15 March 2013 42. Section L Instructions to Offerors, 13 a. Proposal Format: Proposals maximum page count is Please clarify if that is 25 pages for Executive Summary and 25 pages for technical? Or 25 total for both? Answer: Answer: No, both the executive summary and technical volume combined is limited to 25 pages. Clarification: The Executive Summary is not included in the proposal 25 maximum page count for technical. Section L, L-II, 13, has been revised to state: Proposals are limited to a maximum of twenty-five (25) pages, excluding Cover Page, Table of Contents, Executive Summary, and Technical Summary Template. In addition, the Past Performance and Cost/Price Volume do not count against the proposal page count. 46. What is the total number of hard copies required for delivery and should they arrive by 28 March, 8AM? Answer: One copy. Yes it should arrive by revised proposal due date 01 April 2013, 4:00PM CST. Clarification: No hard copy is required to de delivered. Section L, L-II, 18 has been revised to state: The original proposal shall be identified as such. One signed copy shall be delivered via email no later than 4:00 PM. CST on 01 April 2013, to the addresses identified below. New Attachments: FA8771-13-R-0002 Rev. 2 Request for Proposal Questions and Answers II
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/USAF/AFMC/ESC/FA8771-13-R-0002/listing.html)
 
Place of Performance
Address: Maxwell AFB - Gunter, Alabama, 36117, United States
Zip Code: 36117
 
Record
SN03017282-W 20130323/130321234208-c0d78ba79e6ffae141851cf489643275 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.