Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY - FEDBIZOPPS ISSUE OF APRIL 05, 2013 FBO #4150
MODIFICATION

Y -- Drag Dam Drop Reconstruction, Central Montana

Notice Date
4/3/2013
 
Notice Type
Modification/Amendment
 
NAICS
238910 — Site Preparation Contractors
 
Contracting Office
BLM CENTRAL MT DISTRICT OFC(MTL000)920 NE MAIN STREETLEWISTOWNMT59457US
 
ZIP Code
00000
 
Solicitation Number
L13PS00283
 
Response Due
5/3/2013
 
Archive Date
6/2/2013
 
Point of Contact
Connie J Sweeney
 
E-Mail Address
csweeney@blm.gov
(csweeney@blm.gov)
 
Small Business Set-Aside
Total Small Business
 
Description
Location: Central Montana. Summary of Work: This project will replace the Drag Dam Drop Outlet works located in Petroleum County, approximately 38 miles north of Winnett, Montana. Major items of work at this dam include: Dewater construction area if/as necessary; Excavate dam embankment for removal of existing corrugated steel outlet pipe, riser, and inlet structure; Construct precast reinforced concrete outlet conduit; Construct precast concrete spillway riser; Reconstruct dam embankment at outlet works; and, Reclaim all disturbed areas including staging areas and temporary roads. Reclamation consists of soil preparation for seeding but does not include seeding. Period of Performance: July 1 to August 20, 2013. See attachments for details. Page 2 of the Maps&Drawings will be issued under an amendment.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/DOI/BLM/MT/L13PS00283/listing.html)
 
Record
SN03027255-W 20130405/130403234244-d4797e5abf04937b940a5dce6fd90043 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.