Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY - FEDBIZOPPS ISSUE OF APRIL 06, 2013 FBO #4151
MODIFICATION

Y -- ERFO Road Repair Project at the Upper Suiattle Road

Notice Date
4/4/2013
 
Notice Type
Modification/Amendment
 
NAICS
237310 — Highway, Street, and Bridge Construction
 
Contracting Office
Department of Agriculture, Forest Service, R-6 Northwest Contracting Area, Mt. Baker-Snoqualmie NF, 2930 Wetmore Avenue Ste 3A, Everett, Washington, 98201, United States
 
ZIP Code
98201
 
Solicitation Number
AG-05M6-S-13-0013
 
Point of Contact
Brian A. Johnson, Phone: (425) 783-6056, Jorge A. Somoza, Phone: (425) 783-6053
 
E-Mail Address
bajohnson03@fs.fed.us, jsomoza@fs.fed.us
(bajohnson03@fs.fed.us, jsomoza@fs.fed.us)
 
Small Business Set-Aside
Total Small Business
 
Description
The Mt. Baker-Snoqualmie National Forest has an Emergency Relief for Federally Owned (ERFO) roads project. ESTIMATED DATE SOLICITATION WILL BE ISSUED On or around May 10, 2013. DESIRED START DATE July 8, 2013 RECOMMENDED CONTRACT TIME 480 Calendar Days PROJECT LOCATION The project sites are located in the vacinity of Darrington, Washington (Upper Suiattle Road). The project is at Mile Posts 20.8, 20.9 (Downey Creek Extension Bridge), and 22.9 (Sulphur Creek Bridge) up the Suiattle Road (FS Road #26), which starts about 7 miles north of Darrington, Washington on State Route 530. There is currently a locked gate at about MP 12.5. DESCRIPTION OF WORK TO BE PERFORMED The project will consist of the repair of three flood damaged sites, including one landslide, an extension bridge, and a bridge approach repair. Work includes staking, erosion control, clearing, excavation, preboring, pile-driving, pre-fabricated bridge installation, pier protection, cast-in-place concrete, retaining walls, and seeding. PRE-BID CONFERENCE A pre-bid conference will be held at the Darrington Ranger Station, Address: 1405 Emens Avenue N., Darrington, WA 98241 on May 2, 2013 (Thursday). All potential bidders are requested to meet at 9:00 AM (until approximately 9:30 AM) at the Darrington Ranger Station for an office overview of the project. The group will then proceed to the existing gate at MP 12.5 of Road #26, which will be opened to allow prospective bidders to drive up to MP 20.7 to get closer to the sites. After looking at the MP 20.8 and 20.9 sites, we will walk up to the MP 22.9 site with anyone who is interested (those who aren't interested may leave at that point). For anyone who cannot make this meeting, a Forest Service key may be checked out from the Darrington Ranger Station for independent site visits. DISCLOSURE OF THE MAGNITUDE OF CONSTRUCTION PROJECTS (FAR 36.204) Project Price Range: Between $250,000 and $500,000. PRESOLICITATION NOTICE QUESTIONS All questions pertaining to this requirement are to be directed via e-mail to both the primary and secondary Points of Contact on this posting. All questions and answers will be issued as an amendment to the solicitation when issued.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/USDA/FS/05M6/AG-05M6-S-13-0013/listing.html)
 
Place of Performance
Address: Mt. Baker-Snoqualmie National Forest, 2930 Wetmore Ave, Suite 3A, Everett, Washington, 98201, United States
Zip Code: 98201
 
Record
SN03028395-W 20130406/130404234351-1cf01dc95c4792328f4b948babe61590 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.