Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY - FEDBIZOPPS ISSUE OF APRIL 07, 2013 FBO #4152
MODIFICATION

Z -- GROUP4-10-R-J004; SHORE PROTECTION, FORT PIERCE, FLORIDA, BEACH RENOURISHMENT 2013, ST LUCIE COUNTY, FLORIDA

Notice Date
4/5/2013
 
Notice Type
Modification/Amendment
 
NAICS
237990 — Other Heavy and Civil Engineering Construction
 
Contracting Office
USACE District, Jacksonville, P.O. Box 4970, Jacksonville, FL 32232-0019
 
ZIP Code
32232-0019
 
Solicitation Number
GROUP4-10-4-J004
 
Response Due
4/5/2013
 
Archive Date
5/31/2013
 
Point of Contact
Veronica S Taylor, Phone: (904) 232-2107
 
E-Mail Address
veronica.s.taylor@saj02.usace.army.mil
(veronica.s.taylor@saj02.usace.army.mil)
 
Small Business Set-Aside
N/A
 
Description
THIS OPPORTUNITY IS AVAILABLE ONLY TO THE FOLLOWING CONTRACTORS AWARDED A CONTRACT UNDER SOLICITATION NUMBER For GROUP 4 use: W912EP-10-R-0026: Orion Marine Construction (W912EP-13-D-0003); Cavache, Inc. (W912EP-13-D-0004); Cashman Dredging & Marine Contracting (W912EP-13-D-0005); Cottrell Contracting Corporation (W912EP-13-D-0006); Great Lakes Dredge & Dock Company, LLC (W912EP-13-D-0007); Dutra Dredging Company (W912EP-13-D-0008); Marinex Construction, Inc. (W912EP-13-D-0009); Norfolk Dredging Company (W912EP-13-D-0010); Mike Hooks, Inc. (W912EP-13-D-0011); Weeks Marine, Inc. (W912EP-13-D-0012); Southern Dredging Co., Inc. (W912EP-13-D-0013); Manson Construction Company (W912EP-13-D-0014); C. F. Bean LLC (W912EP-13-D-0015) PROPOSALS WILL NOT BE CONSIDERED FROM ANY ENTITY OTHER THAN THE PREVIOUSLY LISTED FIRMS INCLUDED IN THE SPECIFIED DREDGING MATOC POOL. Project Work is divided into a base and two options which includes constructing a beach berm to an elevation +7.4 feet with a varying berm width. A permitted offshore borrow area for the project is located approximately 4 miles southeast of the project site. Due to the extensive hard ground areas located offshore of the fill template area, offshore pipeline access to the beach site is prohibited. The Contractor will operate the off-loading from inside the South Jetty of Fort Pierce Inlet, FL. Staging area and beach access to the project fill area is located at the end of Seaway Drive also near the south jetty offloading area. Because of environmental fill restrictions within the project (Refer to Specification ENVIRONMENTAL PROTECTION for further details), base work will begin fill operations at R-37 which is 3,000 feet south of the Fort Pierce Jetty and work southward for another 4,000 feet (R-41). The contractor will then retreat fill operations at the South jetty and start fill operations at the south jetty and complete base work at R-35. Option 1 will place beach quality material between R-35 and T-36 and Option 2 will place material between T-36 and R-37. Base and optional work also includes but is not limited to endangered species observers, sea turtle non-capture trawl sweeping, turbidity monitoring, beach tilling, and construction/vibration controls and monitoring. COAST GUARD CERTIFIED LOAD LINE EQUIPMENT IS REQUIRED. The Magnitude of construction is between $5,000,000.00 and $10,000,000.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/USA/COE/DACA17/GROUP4-10-4-J004/listing.html)
 
Place of Performance
Address: USACE District, Jacksonville P.O. Box 4970, Jacksonville FL
Zip Code: 32232-0019
 
Record
SN03029753-W 20130407/130405234129-60b8a482fdaff117d2b8e20039c62049 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.