34 -- Prototype fuel tanks-Mobile Tactical Refueling System (MTRS)

Notice Date
4/16/2013
 
Notice Type
Modification/Amendment
 
NAICS
332420 — Metal Tank (Heavy Gauge) Manufacturing
 
Contracting Office
ACC - Warren (ACC-WRN)(DTA), ATTN: AMSTA-AQ-AMB, E Eleven Mile Road, Warren, MI 48397-5000
 
ZIP Code
48397-5000
 
Solicitation Number
W56HZV13TA124
 
Response Due
5/3/2013
 
Archive Date
6/15/2013
 
Point of Contact
Angela Gauthier-O'Dell, 586-282-2204
 
E-Mail Address
ACC - Warren (ACC-WRN)(DTA)
(angela.s.gauthier-odell.civ@mail.mil)
 
Small Business Set-Aside
Total Small Business
 
Description
AMENDMENT 5-REVISED STATEMENT OF WORK SEE ATTACHMENT-AMD5COMBSYNSOL16APR13 SECTION 4.14.3 THROUGH 4.14.5 AND EXTENDED DEADLINE TO 5/3/13 4 P.M. E.S.T. CONTRACTOR MUST BE REGISTERED UNDER NAICS CODE 332420 PRIOR TO RECEIVING AN AWARD. AMENDMENT 4- UPDATED CONTRACTOR QUESTIONS AND GOVERNMENT RESPONSES IN ATTACHMENT. AMENDMENT 3- EXTENDED RESPONSE DEADLINE DATE FROM 4/16/13 TO 4/23/13 DUE TO SYSTEM ACCESS TO DRAWING ISSUES. AMENDMENT 2-SEE ATTACHMENT 3 FOR CONTRACTOR QUESTION AND GOVERNMENT RESPONSES POSTED 4/3/13. AMENDMENT 1-NOTE: DISREGARD LAST COMBINEDSYNOPSISSOLICITATION ATTACHMENT. (IT IS A DUPLICATE AND THE SYSTEM WOULD NOT ALLOW ME TO DELETE THE INFORMATION.) This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in Subpart 12.6, as supplemented with additional information included in this notice. This announcement constitutes the only solicitation; proposals are being requested and a written solicitation will not be issued. COMBINED SYNOPSIS/SOLICITATION - W56HZV13TA124 APRIL 2, 2013 I. INTRODUCTION A. This is a Combined Synopsis/Solicitation for commercial items prepared in accordance with the format in FAR Parts 12.6 as supplemented with additional information in this notice. This announcement constitutes the only solicitation; quotations are being requested and a written solicitation will not be issued. B. The combined synopsis and Request for Proposal (RFP) number is: W56HZV13TA124 C.Posting Date: 4/2/13 D.Response Date: REVISED FROM 4/16/13 TO 5/3/13 16:00 (4 p.m.) Eastern Standard Time (E.S.T.) E.Contracting Office: Army Contracting Command - Warren (ACC-WRN) 6501 E. Eleven Mile, Warren, MI 48397. F.This solicitation document and incorporated provisions and clauses are those in effect through Federal Acquisition Circular 2005-66 effective April 1, 2013. G.The NAICS code applicable to this acquisition is 332420. NOTE: OFFEROR MUST BE CERTIFIED UNDER THIS NAICS CODE PRIOR TO RECEIVING AN AWARD. H.This Combined Synopsis Solicitation contains clauses and provisions requiring a fill-in or representation. Offeror shall submit a copy of this Combined Synopsis Solicitation with their bid and respond to these clauses and provisions accordingly. A failure to complete these fill-ins may cause your offer to be determined ineligible for award. I.Basis for award- ACC-WRN intends to award to the lowest price (50%), technically acceptable (25%), previous experience (25%). The Government may also choose to negotiate if only one offeror is received. See provision at 52.209-4011 - Contractor Responsibility and Eligibility for Award for further details. J.Small Business Set-Aside: 100% SECTION A: SUMMARY Proposals shall include the following information: -Cost -Estimated weight of tank, when full. See definition of weight in section 4.3. -Estimate of the full internal volume of the tank and the total useable (or fillable)volume of the tank. -Overall height. -Sketch of proposed tank showing dimensions. -Materials that the contractor would expect to construct the tank out of, including thicknesses. -Proposed schedule which includes (see Section 5): Start of Work Meeting (no later than 7 days after contract award) Initial Design Review (no later than 30 days after contract award) Final Design Review (no later than 60 days after contract award) Delivery of first tank (no later than 12 weeks after contract award) Delivery of second tank (no later than 8 weeks after authorization is given by TARDEC CSI.) SECTION B: CLIN DESCRIPTION AND PRICING SECTION C: STATEMENT OF WORK (SOW) SEE ATTACHMENT SECTION D: PACKAGING AND MARKING See TDP Clause 52.211-4072 TECHNICAL DATA PACKAGE INFORMATION NOTE: TO OBTAIN DRAWING SPECIFICATIONS, CONTRACT MUST SIGN, SCAN, AND E-MAIL COMPLETED NON DISCLOSURE STATEMENT. ONCE THAT HAS BEEN RECEIVED BY CONTRACT SPECIALIST, PERMISSION TO RELEASE DRAWINGS WILL BE ALLOWED THROUGH LINK IN CLAUSE. 52.211-4072 TECHNICAL DATA PACKAGE INFORMATION. SECTION J: EXHIBITS AND ATTACHMENTS Exhibits AA-AG, CDRLS (Contract Data Requirements Lists) Attachments: 1. Non-Disclosure Statement, and Certificate of Technical Data Destruction. NOTE: Contractor shall sign and scan Non-Disclosure Statement and e-mail to contract specialist prior to receiving access to drawings. 2. Certificate of Technical Data Destruction NOTE: Contractor shall sign and scan Certificate of Technical Data Destruction and e-mail to contract specialist within 7 days after purchase order award. SECTION M- Evaluation Criteria See Clause 52.212-2 for evaluation factors.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/notices/63a61a782173511670cf7502bc95e8d0)
 
Place of Performance
Address: ACC - Warren (ACC-WRN)(DTA) ATTN: CCTA-ADS-D, 6501 E. Eleven Mile Road Warren MI
Zip Code: 48397-5000
 
Record
SN03037647-W 20130418/130416234627-63a61a782173511670cf7502bc95e8d0 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.