Y -- REPAIR RUNWAY 29 END KEEL SECTION, QJVF 100128, MINOT AFB, NORTH DAKOTA

Notice Date
4/19/2013
 
Notice Type
Award Notice
 
NAICS
237310 — Highway, Street, and Bridge Construction
 
Contracting Office
USACE District, Omaha, 1616 Capital Ave, Omaha, NE 68102-4901
 
ZIP Code
68102-4901
 
Solicitation Number
W9128F13R0013
 
Archive Date
5/19/2013
 
Point of Contact
Donna Larson, 402-995-2066
 
E-Mail Address
USACE District, Omaha
(donna.r.larson@usace.army.mil)
 
Small Business Set-Aside
N/A
 
Award Number
W9128F13C0007
 
Award Date
4/18/2013
 
Awardee
Acme Concrete Paving, Inc. (117157847) <br> 4124 E Broadway Ave <br> Spokane, WA 99202-4531
 
Award Amount
$11,870,000.00
 
Line Number
Total Basic and all Option items
 
Description
Project Description: This is a Fully-Designed Project. The work consists of removing and replacing Runway 29 End concrete Keel Section and including associated asphalt shoulders. Approximately 23,600 CY of concrete will be required conforming to UFGS 32 13 11 CONCRETE PAVEMENT FOR AIRFIELDS AND OTHER HEAVY-DUTY PAVEMENTS with very stringent fine and coarse aggregate deleterious materials limits unique to military airfield pavement construction, weather severity classification of severe, enforcement of evaluation and testing for Alkali-Silica Reactivity per UFGS 32 13 11 requirements for both fine and coarse aggregates, Air Force durability requirement that aggregate shall have a satisfactory service record in freezing and thawing of at least 5 years successful service in three concrete paving projects or aggregate with durability factor of 50 or more when subjected to freezing and thawing of specimens prepared in accordance with ASTM C 1646/C 1646M and tested in accordance with ASTM C 666/C 666M, Procedure A for aggregates not having a satisfactory demonstrable service record. Associated work includes the installation of 47,500 LF of preformed compression joint seal; placement of 1100 tons of asphalt conforming to UFGS 32 12 15 HOT-MIX ASPHALT (HMA) FOR AIRFIELDS; removal & replacement of Runway End 29 threshold lighting bar; removal & replacement of 20,000 LF of runway/taxiway edge light cable, conduit and counterpoise, 32 elevated & semi-flush runway/taxiway edge light, base & transformer installation; pavement marking; and minor grading. The above project description and approximate quantities are for information only. Project scope of work and associated quantities are subject to change. All potential contractors should be aware a housing shortage is the norm in the region due to the oil boom and high number of out of state workers residing in the state of North Dakota. All Prime Contractors should be aware local subcontractors and workers may also be in short supply due to the vast flooding and subsequent construction that occurred during the summer of 2011 in and around Minot, ND. RFP Evaluation Criteria
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/USA/COE/DACA45/W9128F13R0013/listing.html)
 
Record
SN03041077-W 20130421/130419234324-a83dc8bc35fe08574f1ba309556ced98 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.