MODIFICATION
Y -- Drag Dam Drop Reconstruction, Central Montana
- Notice Date
- 4/25/2013
- Notice Type
- Modification/Amendment
- NAICS
- 238910
— Site Preparation Contractors
- Contracting Office
- BLM CENTRAL MT DISTRICT OFC(MTL000)920 NE MAIN STREETLEWISTOWNMT59457US
- ZIP Code
- 00000
- Solicitation Number
- L13PS00283
- Response Due
- 5/10/2013
- Archive Date
- 6/9/2013
- Point of Contact
- Connie J Sweeney
- E-Mail Address
-
csweeney@blm.gov
(csweeney@blm.gov)
- Small Business Set-Aside
- Total Small Business
- Description
- Amendment provides questions and answers from site visit and other; an updated Value Schedule; and extends the quote due date to May 10, 2013. Location: Central Montana. Summary of Work: This project will replace the Drag Dam Drop Outlet works located in Petroleum County, approximately 38 miles north of Winnett, Montana. Major items of work at this dam include: Dewater construction area if/as necessary; Excavate dam embankment for removal of existing corrugated steel outlet pipe, riser, and inlet structure; Construct precast reinforced concrete outlet conduit; Construct precast concrete spillway riser; Reconstruct dam embankment at outlet works; and, Reclaim all disturbed areas including staging areas and temporary roads. Reclamation consists of soil preparation for seeding but does not include seeding. See details under Documentation.
- Web Link
-
FBO.gov Permalink
(https://www.fbo.gov/spg/DOI/BLM/MT/L13PS00283/listing.html)
- Record
- SN03045448-W 20130427/130425234507-d2bd86fecc033ea5f4cb333c41613849 (fbodaily.com)
- Source
-
FedBizOpps Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's FBO Daily Index Page |