Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY - FEDBIZOPPS ISSUE OF MAY 11, 2013 FBO #4186
MODIFICATION

54 -- GREEN FOREST-POPLAR BLUFF-ASHERVILLE STEEL STRUCTURES

Notice Date
5/9/2013
 
Notice Type
Modification/Amendment
 
NAICS
332312 — Fabricated Structural Metal Manufacturing
 
Contracting Office
SWPA (Tulsa)U.S. DEPT OF ENERGYSOUTHWESTERN POWER ADMINISTRATIONONE WEST THIRD STREETTulsaOK74103-3502US
 
ZIP Code
00000
 
Solicitation Number
DE-SOL-0005544
 
Point of Contact
Sean L. Long
 
Small Business Set-Aside
N/A
 
Description
The specificationd are general enough that to cover slip or flange joints. The drawings show flanged joints and that is what is required for this procurement. QUESTIONS AND ANSWERS: 1. Will Smooth Round poles will be a considered as an alternative to 12-sided hexagonal poles. ANSWER = NO. 2. The Quantity of poles in the bid schedule differs from the quantities listed on the engineered drawings. ANSWER = Use the quantities of poles listed in the BID SCHEDULE. 3.The ground sleeve in the drawing is shown at 7?-0 long that is, 5?-0 above grade and 2?-0 below grade. The bid description schedule calls out a 5?-0 ground sleeve 3?-0 above grade and 2?-0 below grade. ANSWER = Use the sleeve lengths specified in the SPECIFICATIONS.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/DOE/PAM/HQ/DE-SOL-0005544/listing.html)
 
Record
SN03057681-W 20130511/130509234737-f3fc4e9922dcf278b2379a108907f6f3 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.