Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY - FEDBIZOPPS ISSUE OF MAY 12, 2013 FBO #4187
MODIFICATION

59 -- James T. Foley BMS HVAC Control Mitgration to GSA Network

Notice Date
5/10/2013
 
Notice Type
Modification/Amendment
 
NAICS
238210 — Electrical Contractors and Other Wiring Installation Contractors
 
Contracting Office
General Services Administration, Public Buildings Service (PBS), Property Management Division (2PMC-U), Plattsburgh BMO, 23 Brinkerhoff Street, Plattsburgh, New York, 12901-2012
 
ZIP Code
12901-2012
 
Solicitation Number
GS02P13PAP0020
 
Archive Date
6/7/2013
 
Point of Contact
Colleen E. Carey, Phone: 518-431-4197, Matthew J Murphy, Phone: 518-431-0315
 
E-Mail Address
colleen.carey@gsa.gov, matthew.murphy@gsa.gov
(colleen.carey@gsa.gov, matthew.murphy@gsa.gov)
 
Small Business Set-Aside
Total Small Business
 
Description
The following are the questions and answers from the site visit that was conducted on April 29, 2013. The due date for the proposals is now May 23, 2013 <blockquote style="TEXT-TRANSFORM: none; BACKGROUND-COLOR: #ffffff; TEXT-INDENT: 0px; FONT: 12.8px arial, sans-serif; WHITE-SPACE: normal; LETTER-SPACING: normal; COLOR: #222222; WORD-SPACING: 0px; -webkit-text-size-adjust: auto; -webkit-text-stroke-width: 0px"> <blockquote style="BORDER-LEFT: #cccccc 1px solid; MARGIN: 0px 0px 0px 0.8ex; PADDING-LEFT: 1ex"> <blockquote style="BORDER-LEFT: #cccccc 1px solid; MARGIN: 0px 0px 0px 0.8ex; PADDING-LEFT: 1ex"> <blockquote style="BORDER-LEFT: #cccccc 1px solid; MARGIN: 0px 0px 0px 0.8ex; PADDING-LEFT: 1ex"> 1. Is this a 100% small business projectYes. The solicitation is for small business. 2. The scope of work states that a internal network is to be developed in the building. If there are new switches to be installed, will they be GSA approved or providedWill the contractor need to provide the switches Paragraph 5.2.1.2 - 8 port switch provided by Government in basement Mechanical room. 3. Will the server be set up by GSA or the contractorWho provides the serverHow many servers or computers will be needed? Paragraph 5.2.4 - Govt provides virtual server, Govt and Contractor set up the server. Paragraph 5.2.4.1 - Govt provides 2 dummy terminals and laptop for contractor to program and Govt to use. 4. Will it be acceptable to use existing wire from the basement to the 2nd floor, then from the 2nd to the 4th floorOver 300' a repeater is needed. What is the length of the longest run needed from the basement to the 5th floor. If it is above 300', can fiber be used or can the 2nd floor be used as a repeater In order to avoid fiber runs and additional cabling - recommend keeping switches on 2nd and 4th floors. Govt shall provide these managed switches. 4a. Will new managed switches need to be installed and who furnishes themWill these new switches replace existing switches Paragraph 5.2.1.2 - Government provided. Yes they will replace existing switches.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/GSA/PBS/2PMCU/GS02P13PAP0020/listing.html)
 
Place of Performance
Address: James T. Foley Courthouse, 445 Broadway, Albany, New York, 12207, United States
Zip Code: 12207
 
Record
SN03059520-W 20130512/130510235315-81c998951eb3c168cf75a55e9b38f3aa (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.