Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY - FEDBIZOPPS ISSUE OF MAY 25, 2013 FBO #4200
SOLICITATION NOTICE

56 -- DENA MATLS FOR (2) 2013-14 STW CABINS

Notice Date
5/23/2013
 
Notice Type
Combined Synopsis/Solicitation
 
NAICS
321213 — Engineered Wood Member (except Truss) Manufacturing
 
Contracting Office
NPS, ARO - Alaska Regional Office240 W. 5th Ave, Room 114AnchorageAK99501-2327US
 
ZIP Code
00000
 
Solicitation Number
P13PS00778
 
Response Due
6/13/2013
 
Archive Date
7/13/2013
 
Point of Contact
REBECCA GRAHAM
 
Small Business Set-Aside
Total Small Business
 
Description
THIS IS A COMBINED SYNOPSIS/SOLICITATION. NO FURTHER SOLICITATION WILL BE ISSUED. Solicitation Number: P13PS00778 NOTICE TYPE: Combined Synopsis/Solicitation This is a combined synopsis/solicitation for commercial items prepared in accordance with the Federal Acquisition Regulation (FAR) in Subparts 12.6 and 13.105, as supplemented with additional information included in this notice. This announcement constitutes the only solicitation; a written solicitation will not be issued. This solicitation is issued as a Request for Quotation (RFQ.) This solicitation document and incorporated provisions and clauses are those in effect through the Federal Acquisitions Circular (FAC) 2005-66, 01 April, 2013. Federal Acquisition Regulation (FAR) cited 52.211-6 Brand Name or Equal (Aug 1999) If an item in this solicitation is identified as brand name or equal, the purchase description reflects the characteristics and level of quality that will satisfy the Governments needs. The salient physical, functional, or performance characteristics that equal product shall meet are specified in the solicitation. Offeror shall provide name and specifications for any equivalent items that you can provide. The government intends to make a simplified acquisition, best value award based on lowest price and technical acceptance, delivered. This procurement is a Total Small Business set-aside. The applicable NAICS classification code is 321213 with a size standard of 500 employees. All quotation packets shall include cut-sheets and technical specifications for all items quoted. The deadline for responses is 13 June 2013. The deadline for any offeror questions or clarification requests on this solicitation shall be 6 June 2013. SPECIFICATIONS: The National Park Service (NPS) has identified a requirement, on a fixed-price, the supply and delivery of building materials for the construction of two (2) cabins, to Denali National Park, Milepost 237.5 Parks Highway, Denali National Park, Alaska 99755. CONTRACT LINE ITEMS NUMBERS (CLINs): NOTE: SEE ATTACHED WORKSHEET FOR LONG DESCRIPTION AND GENERAL SPECIFICATIONS FOR EACH CLIN. CLIN014 x 12 x 12' PT TimberQuantity: 24 EAUnit Cost: $_____ Extended Cost: $ _____ CLIN026 x 6 x 8' SPF, No. 2 & btrQuantity: 4 EAUnit Cost: $_____ Extended Cost: $ _____ CLIN033-1/2 x 12 x 26' Engineered Microlam BmQuantity: 4 EAUnit Cost: $_____ Extended Cost: $ _____ CLIN043-1/2 x 12 x 18' Engineered Microlam BmQuantity: 4 EAUnit Cost: $_____ Extended Cost: $ _____ CLIN052-5/16" x 11-7/8" x 18' I-Joists, TJI 360,Quantity: 40 EA Unit Cost: $_____ Extended Cost: $ _____ CLIN062-5/16 x 11-7/8 Top Flange Joist Hanger Quantity: 78 EA Unit Cost: $_____ Extended Cost: $ _____ CLIN073/4" x 4' x 8' T&G ACX Plywood, FloorQuantity: 32 EAUnit Cost: $_____ Extended Cost: $ _____ CLIN081/2" x 4' x 8' CDX PlywoodQuantity: 32 EAUnit Cost: $_____ Extended Cost: $ _____ CLIN092"x 6"x 16' PT Lumber, not incisedQuantity: 12 EAUnit Cost: $_____ Extended Cost: $ _____ CLIN10Sub-Floor Adhesive, 28 oz. tubeQuantity: 10 EAUnit Cost: $_____ Extended Cost: $ _____ CLIN112'x 6'x 92-5/8" Wall Stud SPF No.2 & BTRQuantity: 200 EAUnit Cost: $_____ Extended Cost: $ _____ CLIN122' x 6' x 16' SPF No.2 & btrQuantity: 100 EAUnit Cost: $_____ Extended Cost: $ _____ CLIN132' x 8' x 16' SPF No.2 & btrQuantity: 11 EAUnit Cost: $_____ Extended Cost: $ _____ CLIN141/2" x 4' x 8' CDX PlywoodQuantity: 60 EAUnit Cost: $_____ Extended Cost: $ _____ CLIN151/2" x 4' x 8' Rough-Tex PlywoodQuantity: 30 EAUnit Cost: $_____ Extended Cost: $ _____ CLIN16House Wrap, 9' x 100'Quantity: 2 ROLLUnit Cost: $_____ Extended Cost: $ _____ CLIN17House Wrap Tape, 2" x 165'Quantity: 3 ROLLUnit Cost: $_____ Extended Cost: $ _____ CLIN182" x 2' x 8' Rigid XPS Foam, min 25 psiQuantity: 10 EAUnit Cost: $_____ Extended Cost: $ _____ CLIN192"x4"x 92-5/8" Wall Stud SPF No.2 & btrQuantity: 55 EAUnit Cost: $_____ Extended Cost: $ _____ CLIN202" x 4" x 16' SPF No.2 & btrQuantity: 100 EAUnit Cost: $_____ Extended Cost: $ _____ CLIN21Energy Heel Scissors Truss, 18' spanQuantity: 16 EAUnit Cost: $_____ Extended Cost: $ _____ CLIN22Energy Heel Common Truss, 18' spanQuantity: 8 EAUnit Cost: $_____ Extended Cost: $ _____ CLIN23Gable End Truss, 18' spanQuantity: 6 EAUnit Cost: $_____ Extended Cost: $ _____ CLIN245/8" x 4' x 8' CDX Plywood roof sheathingQuantity: 50 EAUnit Cost: $_____ Extended Cost: $ _____ CLIN25Roof Bituthene, self adhering, 3'x75'Quantity: 7 ROLLUnit Cost: $_____ Extended Cost: $ _____ CLIN26Metal Roof Panels, cut-to-length, cratedQuantity: 95 EAUnit Cost: $_____ Extended Cost: $ _____ CLIN27Roof Cap, 10' lengths, cratedQuantity: 8 EAUnit Cost: $_____ Extended Cost: $ _____ CLIN28Gable End Flashing, 10' lengths, cratedQuantity: 10 EAUnit Cost: $_____ Extended Cost: $ _____ CLIN29Eave Flashing, snow eave, 10' lengthsQuantity: 14 EAUnit Cost: $_____ Extended Cost: $ _____ CLIN30Roof Screw No.10x1" pancake 250/bagQuantity: 5 BAGUnit Cost: $_____ Extended Cost: $ _____ CLIN31Roof Screw No.14x1" hex 250/bag greenQuantity: 4 BAGUnit Cost: $_____ Extended Cost: $ _____ CLIN32Roof Screw No.12x3/4" stitch 250/bag grnQuantity: 2 BAGUnit Cost: $_____ Extended Cost: $ _____ CLIN3312"x12" Gable End Vent, metal, brownQuantity: 4 EAUnit Cost: $_____ Extended Cost: $ _____ CLIN341/4" Mesh for Soffit Vent 4"x100' rollQuantity: 1 ROLLUnit Cost: $_____ Extended Cost: $ _____ CLIN351"x6"x16' T&G Tight Knot Siding unfinQuantity: 280 EAUnit Cost: $_____ Extended Cost: $ _____ CLIN361"x8"x16' Tight Knot Pine Board unfinishedQuantity: 52 EAUnit Cost: $_____ Extended Cost: $ _____ CLIN371/2"x 4'x8' MDO Plywood-MDO 1 side onlyQuantity: 100 EAUnit Cost: $_____ Extended Cost: $ _____ CLIN381/4"x1-1/2"x8' Pine BattenQuantity: 40 EAUnit Cost: $_____ Extended Cost: $ _____ CLIN391"x6'x16' T&G Pine V-groove CeilingQuantity: 100 EAUnit Cost: $_____ Extended Cost: $ _____ CLIN401"x 6"x10' T&G Pine V-groove CeilingQuantity: 100 EAUnit Cost: $_____ Extended Cost: $ _____ CLIN412"x12"x16' Cedar, A Grade, VGQuantity: 16 EAUnit Cost: $_____ Extended Cost: $ _____ CLIN422" x 4" x 16' Cedar, A Grade, VGQuantity: 20 EAUnit Cost: $_____ Extended Cost: $ _____ CLIN431" x 8" x 14' Cedar, A Grade, VGQuantity: 20 EAUnit Cost: $_____ Extended Cost: $ _____ CLIN441" x 4" x 16' Cedar, A Grade, VGQuantity: 56 EAUnit Cost: $_____ Extended Cost: $ _____ CLIN451" x 4" x 10' Cedar, A Grade, VGQuantity: 22 EAUnit Cost: $_____ Extended Cost: $ _____ CLIN46R-21 FG Batt, unfaced, for studs @ 16"Quantity: 1760 SFUnit Cost: $_____ Extended Cost: $ _____ CLIN47R-11 FG Batt, kraft faced, studs @ 16"Quantity: 450 SFUnit Cost: $_____ Extended Cost: $ _____ CLIN48R-38 FG Batt, kraft faced, trusses @ 24"Quantity: 1150 SFUnit Cost: $_____ Extended Cost: $ _____ CLIN49R-38 FG Batt, unfaced, for joists @ 16"Quantity: 1000 SFUnit Cost: $_____ Extended Cost: $ _____ CLIN50Clear Poly Sheeting, 10'x100'x6 MILQuantity: 4 ROLLUnit Cost: $_____ Extended Cost: $ _____ CLIN512 1/2"x72yd Red Vapor Barrier TapeQuantity: 4 ROLLUnit Cost: $_____ Extended Cost: $ ______ CLIN52FG Door 3-0x6-8, 2-panel half lite LeftQuantity: 1 EAUnit Cost: $_____ Extended Cost: $ _____ CLIN53FG Door 3-0x6-8, 2-panel half lite RightQuantity: 1 EAUnit Cost: $_____ Extended Cost: $ _____ CLIN54Int. Wood Door 3-0x6-8 flush birch LHQuantity: 2 EAUnit Cost: $_____ Extended Cost: $ _____ CLIN55Int. Wood Door 3-0x6-8 flush birch RHQuantity: 2 EAUnit Cost: $_____ Extended Cost: $ _____ CLIN56Vinyl Window, 56x42 CasementQuantity: 4 EAUnit Cost: $_____ Extended Cost: $ _____ CLIN57Vinyl Window, 56x32 FixedQuantity: 2 EAUnit Cost: $_____ Extended Cost: $ _____ CLIN58Vinyl Window, 36x42 Casement, Left HandQuantity: 2 EAUnit Cost: $_____ Extended Cost: $ _____ CLIN59Vinyl Window, 36x42 Casement, Right HandQuantity: 2 EAUnit Cost: $_____ Extended Cost: $ _____ CLIN60Vinyl Window, 28x32 Casement, Left HandQuantity: 2 EAUnit Cost: $_____ Extended Cost: $ _____ CLIN61Vinyl Window, 28x32 Casement, Right HandQuantity: 2 EAUnit Cost: $_____ Extended Cost: $ _____ CLIN62Laminate Flooring, snap fit w/underlayQuantity: 1082 SFUnit Cost: $_____ Extended Cost: $ ______ CLIN63Floor Transition Strip, 8'Quantity: 2 EAUnit Cost: $_____ Extended Cost: $ _____ CLIN64Base Cabinet, 12"W, 4 drawersQuantity: 2 EAUnit Cost: $_____ Extended Cost: $ _____ CLIN65Base Cabinet, 12"W, 4 drawersQuantity: 2 EAUnit Cost: $_____ Extended Cost: $ _____ CLIN66Corner Sink Base Cabinet, 36"WQuantity: 1 EAUnit Cost: $_____ Extended Cost: $ _____ CLIN67Corner Sink Base Cabinet, 36"WQuantity: 1 EAUnit Cost: $_____ Extended Cost: $ _____ CLIN68Base Cabinet, 18"W, 1 drawer, 2 shelvesQuantity: 2 EAUnit Cost: $_____ Extended Cost: $ _____ CLIN69Base Cabinet, 18"W, no drawer, 2 shelvesQuantity: 2 EAUnit Cost: $_____ Extended Cost: $ _____ CLIN70Base Cabinet, Corner Unit, Super SusanQuantity: 1 EAUnit Cost: $_____ Extended Cost: $ _____ CLIN71Base Cabinet, Corner Unit, Super SusanQuantity: 1 EAUnit Cost: $_____ Extended Cost: $ _____ CLIN72Wall Cabinet, 18x30, 2shlvs, hinge leftQuantity: 2 EAUnit Cost: $_____ Extended Cost: $ _____ CLIN73Wall Cabinet, 21x30, 2 shlvs, hinge leftQuantity: 1 EAUnit Cost: $_____ Extended Cost: $ _____ CLIN74Wall Cabinet, 30x15, double doorsQuantity: 2 EAUnit Cost: $_____ Extended Cost: $ _____ CLIN75Wall Cabinet, 18x30, 2shlvs, hinge rightQuantity: 2 EAUnit Cost: $_____ Extended Cost: $ _____ CLIN76Wall Cabinet, 21x30, 2shlvs, hinge rightQuantity: 1 EAUnit Cost: $_____ Extended Cost: $ _____ CLIN77Cabinet Toe Kick, 8' lengthQuantity: 4 EAUnit Cost: $_____ Extended Cost: $ _____ CLIN78Outside corner molding to match cabs, 8'Quantity: 2 EAUnit Cost: $_____ Extended Cost: $ _____ CLIN791/2"x4'x8' MDO Plywood, overlay both sidesQuantity: 8 EAUnit Cost: $_____ Extended Cost: $ _____ CLIN80Closet Rod, 8'Quantity: 4 EAUnit Cost: $_____ Extended Cost: $ _____ CLIN81Closet Rod End SupportQuantity: 8 EAUnit Cost: $_____ Extended Cost: $ _____ CLIN82Direct Vent Propane Heater, 16,000 BTU/hQuantity: 2 EAUnit Cost: $_____ Extended Cost: $ _____ CLIN83Combo Service Ent./Meter Base, Square DQuantity: 2 EAUnit Cost: $_____ Extended Cost: $ _____ CLIN84Elec Panel, flush mnt, 125A, 12 sp, Sq DQuantity: 2 EAUnit Cost: $_____ Extended Cost: $ _____ CLIN85Elec Panel Cover, Square DQuantity: 2 EAUnit Cost: $_____ Extended Cost: $ _____ CLIN86Elec Panel Main Breaker, 125 A, Square DQuantity: 2 EAUnit Cost: $_____ Extended Cost: $ _____ CLIN8720A Single Pole Breaker, QO SeriesQuantity: 10 EAUnit Cost: $_____ Extended Cost: $ _____ CLIN8820A Single Pole GFI Breaker, QO SeriesQuantity: 4 EAUnit Cost: $_____ Extended Cost: $ _____ CLIN8920A Single Pole Arc Fault Breaker, QOQuantity: 4 EAUnit Cost: $_____ Extended Cost: $ _____ CLIN90Fiberglass elec box, 1 gang, w/ flangeQuantity: 40 EAUnit Cost: $_____ Extended Cost: $ _____ CLIN91Fiberglass elec box, 2 gang, w/ flangeQuantity: 6 EAUnit Cost: $_____ Extended Cost: $ _____ CLIN92Fiberglass elec box, round, w/ flangeQuantity: 20 EAUnit Cost: $_____ Extended Cost: $ _____ CLIN9320A Duplex Recepts, ivoryQuantity: 46 EAUnit Cost: $_____ Extended Cost: $ _____ CLIN9420A GFI Duplex Recepts, ivoryQuantity: 2 EAUnit Cost: $_____ Extended Cost: $ _____ CLIN9520A Single Pole Switch, ivoryQuantity: 12 EAUnit Cost: $_____ Extended Cost: $ _____ CLIN96#12-2 Romex w/ Ground Wire, 1000' RollQuantity: 2 ROLLUnit Cost: $_____ Extended Cost: $ _____ CLIN97Ground Rod, 5/8" x 8'Quantity: 2 EAUnit Cost: $_____ Extended Cost: $ _____ CLIN98Ground Clamp for CLIN 970Quantity: 2 EAUnit Cost: $_____ Extended Cost: $ _____ CLIN99Ceiling Flush Mount Light FixtureQuantity: 4 EAUnit Cost: $_____ Extended Cost: $ _____ CLIN100Ceiling Pendant Mount Light FixtureQuantity: 2 EAUnit Cost: $_____ Extended Cost: $ _____ CLIN101Ceiling Mount Light Fixture, bedroomQuantity: 4 EAUnit Cost: $_____ Extended Cost: $ ______ CLIN102Ceiling Mount Porch LightQuantity: 2 EAUnit Cost: $_____ Extended Cost: $ _____ CLIN103Packaging and Shipping to destination Denali National Park Quantity: 1 LOTUnit Cost: $_____ Extended Cost: $ _____ COMMERCIAL CLAUSES: 52.252-02 CLAUSES INCORPORATED BY REFERENCE: This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this address: https://acquisition.gov/far/index.html. 52.212-02 Evaluation Commercial Items. The following factors shall be used to evaluate offers: Lowest Price delivered to Denali National Park, Mile Post 237.5 Parks Highway, Denali Park, Alaska 99755. 52.212-03 Offeror Representations and Certifications -- Commercial Items: An offeror shall complete only paragraphs (b) of this provision if the offeror has completed the annual representations and certificates electronically via https://sam.gov. If an offeror has not completed the annual representations and certifications electronically at the SAM website, the offeror shall complete only paragraphs (c) through (o) of this provision accessed electronically at this address: https://acquisition.gov/far/index.html. 52.212-04 Contract Terms and Conditions -- Commercial Items. 52.212-05 Contract Terms and Conditions Required to Implement Statutes or Executive Orders -- Commercial Items: (a) The Contractor shall comply with the following Federal Acquisition Regulation (FAR) clauses, which are incorporated in this contract by reference, to implement provisions of law or Executive orders applicable to acquisitions of commercial items: 52.222-50, Combating Trafficking in Person; 52.233-3, Protest After Award; 52.233-4, Applicable Law for Breach of Contract Claim. (b) The Contractor shall comply with the FAR clauses in this paragraph (b) that the Contracting Officer has indicated as being incorporated in this contract by reference to implement provisions of the law or Executive orders applicable to acquisitions of commercial items: 52.204-10, Reporting Executive Compensation and First-Tier Subcontract Awards; 52.209-6 Protecting the Governments Interest When Subcontracting with Contractors Debarred, Suspended, or Proposed for Debarment;52.219-6 Notice of Total Small Business Set-Aside;52.219-28, Post Award Small Business Program Representation; 52.222-3 Convict Labor; 52.222-19, Child Labor-Cooperation with Authorities and Remedies; 52.222-21, Prohibition of Segregated Facilities; 52.222-26, Equal Opportunity; 52.222-35, Equal Opportunity for Veterans; 52.222-36, Affirmative Action for Workers with Disabilities; 52.223-18, Encouraging Contractor Policies to Ban Text messaging While Driving; 52.225-1, Buy American Act-Supplies; 52.225-13, Restrictions on Certain Foreign Purchases; 52.232-33, Payment by Electronic Funds Transfer-Central Contractor Registration; 52.211-6, Brand Name or Equal (Aug 1999) Contractor shall be registered in the SAMS Database at www.sam.gov prior to an award being made. Award will be made to the responsive, responsible vendor meeting all the requirements above; at the lowest price, delivered. Payment requests must be submitted electronically through the U.S. Department of the Treasurys Internet Payment Platform System (IPP). Payment request means any request for contract financing payment or invoice payment by the Contractor. To constitute a proper invoice, the payment request must comply with the requirements identified in the applicable Prompt Payment clause included in the contract, or the clause 52.212-4 Contract Terms and Conditions Commercial Items included in commercial item contracts, The IPP website address is: https://www.ipp.gov. SUBMISSION: Quotes must be received at the following address, via email, fax, or mail, prior to the closing date of this combined synopsis/solicitation: National Park Service Attn: Rebecca Graham 240 W. 5th Ave. Anchorage, AK 99501 Ph: (907) 644-3318 Fax: (907) 644-3821 Email: Rebecca_Graham@nps.gov.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/DOI/NPS/APC-IS/P13PS00778/listing.html)
 
Record
SN03070009-W 20130525/130523234827-79ba4e6e6ccfd653fd289dce9d134f39 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.