Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY - FEDBIZOPPS ISSUE OF MAY 25, 2013 FBO #4200
SOLICITATION NOTICE

19 -- SO-13-017 SPERY SUPPORT FOR FCT - Package #1

Notice Date
5/23/2013
 
Notice Type
Combined Synopsis/Solicitation
 
NAICS
811219 — Other Electronic and Precision Equipment Repair and Maintenance
 
Contracting Office
Department of the Navy, Military Sealift Command, MSC Norfolk, Building SP-64, 471 East C Street, Bldg SP64, Naval Station Norfolk, Norfolk, Virginia, 23511, United States
 
ZIP Code
23511
 
Solicitation Number
N32205-13-T-4263
 
Point of Contact
David K. Hamilton, Phone: 7574435907, Cynthia M Clemons, Phone: (757) 417-4547
 
E-Mail Address
david.hamilton2@navy.mil, cynthia.clemons@navy.mil
(david.hamilton2@navy.mil, cynthia.clemons@navy.mil)
 
Small Business Set-Aside
N/A
 
Description
Request for Quote J & A STATEMENT OF WORK •1.0 ABSTRACT •1.1 This item describes technical services for Navigation, SOLAS, Voyage Data Recorder systems in support Final Contract Trials (FCTs). •2.0 REFERENCES: •2.1 CC-60 STAED Bridge to Bridge •2.2 EL-3 STAED Navigation Signal and Search Demo •2.3 NV-1 STAED Navigational Equip Demo •2.4 NV-2 STAED Auto Pilot Demo •2.5 NV-3 STAED Speed Log Demo •2.6 NV-4 STAED Misc. Navigation Demo •2.7 NV-5 STAED Radar Demo •2.8 NV-8 STAED Navigation Control Demo •2.9 NV-9 STAED Gyro Demo •3.0 ITEM LOCATION/DESCRIPTION: •3.1 Locations: •3.1.1 Wheel House •3.1.2 Various •3.2 Quantity: •3.2.1 Various •4.0 GOVERNMENT FURNISHED MATERIAL/EQUIPMENT/SERVICE: NONE •5.0 NOTES: •5.1 Contact James Phillips (primary) 757-443-2924 or Johnathan Overton (secondary) 757-443-5803, for details and requirements concerning access to an MSC vessel. •5.2 Contractor is required to submit personnel on the EPIC spreadsheet. To gain access to MSC vessel's on the East Coast, contractors must submit an EPIC request to MSFSC(underscore)EPIC(underscore)EAST(at)navy(dot)mil MSFSC_EPIC_EAST@navy.mil. •5.3 Contractors, shall allow 3 business days (5 for NASSCO, OCONUS, & Earl NJ) for processing of all requests. EPIC will take up to 48 hrs to process, the request must be approved by EPIC before access can be sent to the facility for approval, access will not be guaranteed without approval from EPIC. •5.4 The contractor and all subcontractors, regardless of tier must consult the General Technical Requirements (GTR) to determine applicability to this work item. In performance of this work item, the contractor and all subcontractors regardless of tier must comply with the requirements of all applicable GTR's including but not limited to GTR's 1 through 7, 22, 23, 26, 28 and 29. •5.5 Performance Period: •5.5.1 June 3 - June 9, FCT Prep. (7 days) •5.5.2 June 10 - June 14, FCT Week, Incl. Sea Trial 1 day. (5 days) •5.6 Location of Work: •5.6.1 JEBLC, Norfolk, VA. •5.7 Port Engineer: •5.7.1 Robert Palandro Office: 757-443-0927 Cell: 757-777-2810 Email: Robert.palandro@navy.mil •6.0 QUALITY ASSURANCE REQUIREMENTS: NONE •7.0 STATEMENT OF WORK REQUIRED: •7.1 Provide the service of one (1) Northrup Grumman OEM rep for the performance period stated in 5.5. The OEM shall be a Sr. Service Tech Rep Experienced with ABS High Speed Craft Navigational Aids Acceptance Trial requirements and the JHSV Class. All work shall be performed by an authorized Service Representative. •7.2 Equipment that shall be inspected, operational condition tested and presented to INSURV inspectors shall include items include but not be limited to Item 2 References and below: •7.2.1 NAVIGATION SYSTEM •7.2.1.1 Voyage Management System, ECDIS-C •7.2.1.2 Radar ARPA Display and System •7.2.1.3 AIS System •7.2.1.4 Moriah Wind System •7.2.1.5 Speed, Depth, Heading, GPS Systems •7.2.2 SOLAS EQUIPMENT •7.2.2.1 GMDSS Equipment including backup battery •7.2.2.2 EPIRBS (2 EA) & Lanyards •7.2.2.3 SARTS •7.2.2.4 IAD •7.2.2.5 MF/HF radiotelephone and TELEX •7.2.2.6 VHF •7.2.2.7 NAVTEX •7.2.2.8 SARTS (2 EA) •7.2.3 VOYAGE DATA RECORDER SYSTEM •7.2.3.1 Sensor Interface Unit •7.2.3.2 Bridge Alarm Unit •7.2.3.3 Protected Data Capsule •7.2.3.4 DAU •7.2.3.5 Microphones •7.3 OEM Reps shall travel to ship location for the Performance Periods specified. •7.4 OEM will provide support for the ship's crew during pre underway and underway testing for Final Contract Trials. Support will include oversight and testing of equipment required to demonstrate to NAVY INSURV Board safe operation of equipment. •7.5 OEM will provide operational assistance during underway period. Vessel will return to JEBLC, Norfolk after underway period. There will be no overnight underway period. There will be only one day of underway testing. •7.6 OEM will help expedite any emergent material needs to support scheduled underway operations. •7.7 OEM will perform an open and inspect phase of contract trial which will commence after the underway period. •7.8 OEM will provide other necessary services related to operation and troubleshooting during Final Contract Trials. •7.9 Contractor shall use References 2.0 and 7.2 as guidance. •7.10 Contractor shall furnish tools and test equipment. SOURCE: Sam Haas Business Development Manager Northrop Grumman Maritime Systems Field Engineering and Training Manager Northrop Grumman - Maritime Systems 1070 Seminole Trail, Charlottesville, VA 22901
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/notices/32c75437260c967fd1d0538ef2c2216c)
 
Place of Performance
Address: JEBLC, Pier 13, Norfolk, VA, Norfolk, Virginia, 23511, United States
Zip Code: 23511
 
Record
SN03070247-W 20130525/130523235050-32c75437260c967fd1d0538ef2c2216c (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.