Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY - FEDBIZOPPS ISSUE OF MAY 26, 2013 FBO #4201
MODIFICATION

Z -- Jim Brown Culvert Replacement - Solicitation 1

Notice Date
5/24/2013
 
Notice Type
Modification/Amendment
 
NAICS
237310 — Highway, Street, and Bridge Construction
 
Contracting Office
Department of Agriculture, Forest Service, R-1 IMAT: Clearwater; Idaho Panhandle; Kootenai; and Nez Perce NF's, 3815 Schreiber Way, Coeur d'Alene, Idaho, 83815-8363, United States
 
ZIP Code
83815-8363
 
Solicitation Number
AG-02RC-S-13-0019
 
Response Due
6/24/2013 2:30:00 PM
 
Point of Contact
Matthew E. Markovich, Phone: 2084768379
 
E-Mail Address
memarkovich@fs.fed.us
(memarkovich@fs.fed.us)
 
Small Business Set-Aside
Total Small Business
 
Description
Past Performance Survey Bid Bond SF 24 Workers' Compensation Form Wage Determination Drawings Supplemental Specs Solicitation **SOLICITATION** This project consists of the removal of an existing 87" x 65" metal culvert and construction of a new 25'-0" span x 6'-6" rise 32' long precast concrete bridge including footings, wingwalls, and curb. Other bridge work includes structural excavation, placement of riprap, excavation and embankment of the roadway approaches for installation of guardrail and aggregate road surfacing. Final roadway will be two lanes. Improvements consist of relocating 200' of the existing stream that is adjacent to the road to an old meander that can be seen on the ground and is 400' long. This work includes excavation for the new streambed which will be placed as fill in the existing channel. Streamside stabilization will be accomplished with some riprap, mostly wattles, clump plantings, and seed. Price range is between $100,000 and $250,000. The estimated start work date is 15 August 2013, with 75 days contract time. The solicitation is expected to be issued after 12 February, 2013.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/USDA/FS/281/AG-02RC-S-13-0019/listing.html)
 
Place of Performance
Address: From Orofino go east on highway 12 for 8 miles to the junction with state highway 11. Follow Highway 11 for 18 miles to Weippe. From Weippe, follow the Peterson Corners road east for 8.2 miles to Peterson Corners and FS Road 100. Follow FS Road 100 for approximately 2.0 miles north toward Pierce, Idaho to Mile Post 33.8 and the project., Idaho County, Idaho, United States
 
Record
SN03071554-W 20130526/130524234205-fb82fb626e0a898f2a1e41571600c218 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.