Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY - FEDBIZOPPS ISSUE OF MAY 30, 2013 FBO #4205
SOLICITATION NOTICE

F -- Trenton Wetland Reserve Program (WRP) Wetland Restoration Project, Trenton Township, Dodge County, WI - Solicitation Documents

Notice Date
5/28/2013
 
Notice Type
Combined Synopsis/Solicitation
 
NAICS
237990 — Other Heavy and Civil Engineering Construction
 
Contracting Office
Department of Agriculture, Natural Resources Conservation Service, Wisconsin State Office, 8030 Excelsior Drive, Suite 200, Madison, Wisconsin, 53717
 
ZIP Code
53717
 
Solicitation Number
AG-5F48-S-13-0006
 
Point of Contact
Tamara M. Lanier, Phone: 6086624422225, , Phone: 608-662-4422 x268
 
E-Mail Address
tami.lanier@wi.usda.gov, pam.hubacher@wi.usda.gov
(tami.lanier@wi.usda.gov, pam.hubacher@wi.usda.gov)
 
Small Business Set-Aside
Total Small Business
 
Description
Solicitation Sections B through M SAM Guide Attachment 5 - Construction Plans Attachment 4 - Construction Specifications Attachment 3 - Davis Bacon Wage Rates Attachment 2 - Trenton WRP location map 2 Attachment 1 - Trenton WRP location map Solicitation, Offer, and Award-Standard Form 1442, Section A Trenton Wetland Reserve Program (WRP) Wetland Restoration Project, Trenton Township, Dodge County, Wisconsin. The work consists of the following: • Approximately 1600' of ditch fill • Excavation of 5 shallow water scrape (borrow) areas • Approximately 7530 cubic yards of spoil placement and shaping 2695' of tile exploration (tile search) • 5750' of tile line removal • Seeding of all areas disturbed during construction • Approximately 0.4 acres of brush removal • 100' of silt fence installation • Providing post-construction seeding of disturbed areas The Contractor shall furnish the necessary personnel, material, equipment, services and facilities (except as otherwise specified), to perform the Specifications/Drawings referenced in Section J, List of Documents, Exhibits, and Other Attachments. PROJECT PERIOD OF PERFORMANCE: 24 calendar days. SITE SHOWING: A site showing will be conducted Monday, 6/3/13 at 9am. Participants will meet at the site entrance at N10870 Buckhorn Road. See Attachments 1 and 2, Site Showing Meeting Access Maps. The site showing is not mandatory, but this is the only opportunity for interested parties to access the site.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/USDA/NRCS/WISO/AG-5F48-S-13-0006/listing.html)
 
Place of Performance
Address: Dodge County, Wisconsin, United States
 
Record
SN03072409-W 20130530/130528234314-e5e7ad2ba4df74784e921722d327fade (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.