Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY - FEDBIZOPPS ISSUE OF MAY 31, 2013 FBO #4206
MODIFICATION

Y -- ANDERSON CREEK BRIDGE INSTALLATION. MT BAKER RANGER DISTRICT - Solicitation 1

Notice Date
5/29/2013
 
Notice Type
Modification/Amendment
 
NAICS
237310 — Highway, Street, and Bridge Construction
 
Contracting Office
Department of Agriculture, Forest Service, R-6 Northwest Contracting Area, Mt. Baker-Snoqualmie NF, 2930 Wetmore Avenue Ste 3A, Everett, Washington, 98201, United States
 
ZIP Code
98201
 
Solicitation Number
AG-05M6-S-13-0015
 
Response Due
6/27/2013 4:30:00 PM
 
Point of Contact
Jorge A. Somoza, Phone: (425) 783-6053, Brian A. Johnson, Phone: (425) 783-6056
 
E-Mail Address
jsomoza@fs.fed.us, bajohnson03@fs.fed.us
(jsomoza@fs.fed.us, bajohnson03@fs.fed.us)
 
Small Business Set-Aside
Total Small Business
 
Description
Solicitation AG-05M6-S-13-0015 This project consists of the replacement of a 60' long log stringer bridge at Mile Post 5.3 of Forest Road 1107. Bridge work includes installing a 70' long, Government-furnished prefabricated bridge superstructure along with concrete sills, backwalls/retaining walls, decking surface & object markers. Work includes erosion control and resource protection, clearing and grubbing, removal of existing log Stringer Bridge, riprap, bridge installation, approach work, excavation and embankment, crushed rock surfacing, hauling of waste material, seeding and mulching. Note: The Instream Work Window for this project is August 1 to September 15, but the road can't be closed until after Labor Day and the road can only be close for 3 weeks. This project is located on the Mt. Baker Ranger District, of the Mt. Baker-Snoqualmie National Forest. From Sedro-Woolley, WA head east about 17 miles to the Baker Lake Highway, then go 13 miles to Road 1106, 2 miles to the Upper Baker Dam, across the dam, and up Road 1107 5.3 miles to the project site. The Government's estimated price is between $100,000 and $250.000. This project is 100% set aside for Small Business. Bonding is required. The desired start date of the project is August 1st 2013 with approximate project duration of 60 days. Technical contact for this project is Peter Wagner at (360) 854-2621 or e-mail pswagner@fs.fed.us
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/USDA/FS/05M6/AG-05M6-S-13-0015/listing.html)
 
Place of Performance
Address: MT. BAKER RANGER DISTRICT, Sedro-Wolley, Washington, 98284, United States
Zip Code: 98284
 
Record
SN03074039-W 20130531/130529235030-4c73bc5f9c59d87f6153e0768d5aa6d9 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.