Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY - FEDBIZOPPS ISSUE OF JUNE 06, 2013 FBO #4212
SOLICITATION NOTICE

Z -- Rehabilitation of the Lower Rio Grande Levee from Los Indios to San Pedro in Cameron County, Texas

Notice Date
6/4/2013
 
Notice Type
Presolicitation
 
NAICS
237990 — Other Heavy and Civil Engineering Construction
 
Contracting Office
International Boundary and Water Commission, Information Management Division, Acquisition Division, 4171 North Mesa, Suite C-100, El Paso, Texas, 79902, United States
 
ZIP Code
79902
 
Solicitation Number
IBM13B0002
 
Point of Contact
Delfina Lechuga, Phone: 9158324120
 
E-Mail Address
delfina.lechuga@ibwc.gov
(delfina.lechuga@ibwc.gov)
 
Small Business Set-Aside
Total Small Business
 
Description
General Description of the Work - The work for this project generally consists of rehabilitation of approximately 12.0 miles of river levee in southern Texas in order to meet the Federal Emergency Management Agency's (FEMA) Levee Certification Requirements of National Flood Insurance Program (NFIP) regulations (44 CFR 65.10). This stretch of river levee is situated entirely in Cameron County, Texas and extends along the Rio Grande from Los Indios to upstream of San Pedro. Major Construction Tasks -(1) Preparation of right of way (clearing and grubbing) (2) Improvement of existing top of levee (3) Construction of Flex Base (4) Construction of ramps (5) Construction of toe drain (6) Re-seeding and establishment of vegetation for erosion control on the side slopes of the levee (7) Replacement of sluice gate assemblies inside existing and new gatewell structures, and (8) Cleaning and removing debris from openings of culverts, and inlet and outlet structures of the existing gatewell systems. The magnitude of this project is between $10 million and $15 million. Performance Period – All work shall be completed within four hundred eighty-five (485) calendar days. All flood control levee and structure work, excluding maintenance of seeding, shall be completed within, three hundred sixty-five (365) calendar days. All maintenance of seeding shall be completed within one-hundred twenty (120) calendar days of completion of all other levee work.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/IBWC/IMD/ElPasoTX/IBM13B0002/listing.html)
 
Place of Performance
Address: Cameron County, Texas, United States
 
Record
SN03078769-W 20130606/130604235318-78e541af94f99b4c485a3583eca4a5ca (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.