Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY - FEDBIZOPPS ISSUE OF JUNE 20, 2013 FBO #4226
SOLICITATION NOTICE

F -- R1-IMAT - Nez Perce-Clearwater NF High Corral Road Decommissioning - Package #1

Notice Date
6/18/2013
 
Notice Type
Combined Synopsis/Solicitation
 
NAICS
115310 — Support Activities for Forestry
 
Contracting Office
Department of Agriculture, Forest Service, R-1 IMAT: Clearwater; Idaho Panhandle; Kootenai; and Nez Perce NF's, 3815 Schreiber Way, Coeur d'Alene, Idaho, 83815-8363, United States
 
ZIP Code
83815-8363
 
Solicitation Number
AG-02RC-S-13-0077
 
Archive Date
8/30/2013
 
Point of Contact
Deb Gerfen, Phone: 208-983-4001, Maple Stuivenga, Phone: 2089834002
 
E-Mail Address
dgerfen@fs.fed.us, mstuivenga@fs.fed.us
(dgerfen@fs.fed.us, mstuivenga@fs.fed.us)
 
Small Business Set-Aside
HUBZone
 
Description
State of Idaho Worker's Compensation Form High Corral Map High Corral Drawings High Corral Road Decommissioning Solicitation Package, refer to page 2 for instruction on submitting quote. Map, drawings, and State of Idaho Worker's Comp form are uploaded as seperate documents Scope of Contract. This project is one of the implementation projects of the Collaborative Forest Landscape Restoration Project (CFLRP). The goal of the CFLRP project is to utilize collaborative, science based ecosystem restoration techniques to improve watershed function while encouraging ecological, economic and social sustainability with an emphasis on providing local employment opportunities. This contract requires road decommissioning, vegetation mastication and related work in compliance with its terms, specifications, and provisions. This includes furnishing labor, equipment, supervision, transportation, operating supplies, and incidentals. a. Description of Work. The High Corral Road Decommissioning project consists of decommissioning approximately 10-14 miles of road. Road decommissioning treatments range from drainage structure removal to strong outslopes and complete recontouring. Roadways will be decompacted as described in worklists. All fill material in draws will be removed and stream channels restored to natural grade and dimensions. All disturbed areas will be seeded. In addition, native forbs and shrubs will be transplanted from areas adjacent to the road. Grade control structures will be constructed in newly reconstructed stream channels. b. Project Location. The project is located southeast of Kooskia, Idaho. From Kooskia travel south on Highway 13 for 11 miles to the junction of the Sally Ann Road. Turn left and travel 3.5 miles east to Clearwater, Idaho. Turn left on Main St and follow for 1 mile, then turn right onto Road 650. Follow road 650 to the FS boundary and the junction of Forest Road 1106. This is the beginning of the project area. c. Pre-Bid Tour. No pre-bid tour. d. Start Work. It is estimated that work will begin on July 29, 2013. The contractor shall give 14 days notice prior to starting any work. Contractor must have 75% or 8.0 miles decommissioned no later than October 31, 2013. All work must be completed by August 1, 2014. e. Period of performance. (See page 12, FAR Clause 52.211-10) HUBZone Set-Aside. This acquisition has been set-aside for HUBZone Concerns (see FAR 52.219-3, Notice of Total HUBZone Set-Aside in Section I). Quoter must be a certified HUBZone Concern with the U.S. Small Business Administration. For information regarding the on-line application process, go to the following website at https://eweb1sp.sba.gov/hubzone/internet/index.cfm. This process can take 90 days or more to complete
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/USDA/FS/281/AG-02RC-S-13-0077/listing.html)
 
Place of Performance
Address: Nez Perce-Clearwater NF, 104 Airport Road, Grangeville, Idaho, 83530, United States
Zip Code: 83530
 
Record
SN03092433-W 20130620/130618234847-f0044785f49a223ebe692bcb1ee48483 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.