Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY - FEDBIZOPPS ISSUE OF JUNE 21, 2013 FBO #4227
SOURCES SOUGHT

Y -- Design-Bid-Build Dahla Dam Improvement Project Phase 2 Dam Rise, Kandahar Province, Afghanistan

Notice Date
6/19/2013
 
Notice Type
Sources Sought
 
NAICS
236220 — Commercial and Institutional Building Construction
 
Contracting Office
USACE Middle East District, P.O. Box 2250, Winchester, VA 22604-1450
 
ZIP Code
22604-1450
 
Solicitation Number
W912ER-13-R-0072
 
Response Due
6/28/2013
 
Archive Date
8/18/2013
 
Point of Contact
Charles H. Hollingsworth, 540-665-3446
 
E-Mail Address
USACE Middle East District
(charles.h.hollingsworth@usace.army.mil)
 
Small Business Set-Aside
N/A
 
Description
The U.S. Army Corps of Engineers (USACE), Transatlantic Middle East District (TAM) is seeking preliminary information, for marketing purposes only, to establish a list of qualified companies who may be interested in submitting a proposal to perform design-bid -build construction for the Dahla Dam Improvement Project Phase 2- Dam Rise located on the Arghandab River in Kandahar Province, Afghanistan. Rehabilitation of the gate system and outlet works is currently being performed under Phase 1 of the Dahla Dam Improvement Project. Phase 2 of the project consists of raising the dam and spillway eight meters to increase reservoir storage. The dam raise component of the project consists of raising the main dam embankment and six saddle dams by eight meters. Both the main dam and saddle dam raises will be earth fill. The total fill volume for the main dam will be approximately 1 million cubic meters, and the total fill volume for the six saddle dams will be approximately 1.1 million cubic meters. All fill material is to be obtained from borrow areas within approximately eight kilometers of the main dam. Construction of the main dam embankment raise will require coordination with the Phase 1 contractor. The dam currently has two ungated overflow spillways. The spillway raise component of the project consists of closing one spillway by construction of an additional saddle dam. The remaining spillway will be widened and raised eight meters using roller compacted concrete with a cast-in-place concrete crest structure. The required quantity of roller compacted concrete will be approximately 40,000 cubic meters, and the required quantity of cast-in-place concrete will be approximately 5,000 cubic meters. The Contractor will be required to provide all logistical support and personnel and site security throughout construction. If a solicitation is released at a later date, a Firm-Fixed-Price contract type is being considered. The Period of Performance is anticipated to be 1,155 days. A. Site location: Dahla Dam on the Arghandab River in Kandahar Province, Afghanistan. B. The magnitude of construction for the Dahla Dam Improvement Project Phase 2-Dam Raise is between $100,000,000 and $250,000,000. C. Response shall be submitted using the following Process: For Bidders List Registration and Email Alerts, log onto the link listed below. (Solicitation release information and required password/s will only be released to those who have electronically filled out a Capabilities Statement. Capabilities Statements are required for EACH solicitation of interest). http://www.aed.usace.army.mil/contracting.asp Click the Sources Sought Tab, click on the Capabilities Statement quote mark Complete quote mark button of the solicitation of interest, fill in the requested information and then click on Register. This will automatically place you on the Bidders List for subject solicitation. Once you have completed the Sources Sought Information return to the Home page and click on quote mark Sign Up for Email Alerts. quote mark This function allows you to receive Automatic email alerts when any new solicitation actions occur. Automated Capabilities Statement entries must be completed prior to the release of the solicitation due to the fact that solicitation password information is only sent to those who have completed the on-line Capabilities Statement. Your submission should address all questions in the capability statement and your ability to perform the work stated in the project information section of this notice. No hard copy, e-mail or facsimile submissions will be accepted. Additionally, since this is a request for information only, your response shall not constitute an offer. Only those companies who respond with a complete Capabilities Statement shall be considered for inclusion in the limited competition. Please be advised that in order to be eligible for contract award with USACE, your company must be registered in both the Joint Contingency Contracting System (JCCS) and the System for Award Management (SAM) systems. It is recommended that you take the necessary steps now to ensure that your company is registered in both of these systems. JCCS is the primary system for host nation vendor vetting for CENTCOM. Effective 01 October 2011, offerors for all USACE solicitations shall be JCCS registered. Information on JCCS registration is available at: https://www.jccs.gov/olvr/bta_jccs_default.aspx. The System for Award Management (SAM) replaced Central Contractor Registration (CCR), the Online Representations and Certifications Application (ORCA), and the Excluded Parties List System (EPLS) in July 2012. SAM combined the capabilities and data of these systems together, streamlining processes and simplifying access to information. Please ensure your company is registered in this system by going to https://sam.gov. Questions concerning the response process can be addressed to the following: Charles Hollingsworth, charles.h.hollingsworth@usace.army.mil, phone calls will not be accepted.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/USA/COE/DACA78/W912ER-13-R-0072/listing.html)
 
Place of Performance
Address: USACE Middle East District P.O. Box 2250, Winchester VA
Zip Code: 22604-1450
 
Record
SN03093941-W 20130621/130620000350-961a8f088f15310262bb67a58b31f9c3 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.