AWARD

Z -- Repair to Wharf, Block Island, Rhode Island. Providence, Rhode Island.

Notice Date
6/24/2013
 
Notice Type
Award Notice
 
NAICS
237990 — Other Heavy and Civil Engineering Construction
 
Contracting Office
USACE District, New England, 696 Virginia Road, Concord, MA 01742-2751
 
ZIP Code
01742-2751
 
Solicitation Number
W912WJ13B0002
 
Response Due
5/2/2013
 
Archive Date
7/24/2013
 
Point of Contact
Elandria M. Cameron, 9783188051
 
E-Mail Address
USACE District, New England
(elandria.m.cameron@usace.army.mil)
 
Small Business Set-Aside
N/A
 
Award Number
W912WJ-13-C-0010
 
Award Date
6/21/2013
 
Awardee
DOUGLAS P. FLEMING, LLC (826752516) <br> 369 SCOTLAND RD <br> WINDHAM, CT 06280-1226
 
Award Amount
$117,000.00
 
Line Number
0001
 
Description
The work of this project involves repairing a wharf damaged by the storm surge from Hurricane Sandy. The wharf is located on the eastern side of the inner basin of old harbor on Block Island, Rhode Island, and is in front of Ballard's Inn. Numerous inboard pile caps have become elevated above the tops of the inboard timber piles. The work involves removing some of the 4 quote mark x 10 quote mark deck planks and timber wheel guards in order to provide access to the pile caps. Sand and rip rap will need to be excavated or moved around each of the inboard piles in order to provide the room necessary to reseat the pile caps on top of the piles. Once the pile caps are reseated on the inboard piles, steel straps (two per pile) will be installed at each pile, including the outboard piles. No excavation is necessary at the outboard piles. After the pile caps have been reseated and the straps installed, the existing timber decking and timber wheel guards shall be reinstalled using existing hardware. In addition, the inboard fascia board shall be replaced in-kind and two ladders on the outboard face of the wharf shall be replaced. The work of the project requires construction operations immediately adjacent to a busy public restaurant. Barricades and chain link safety fencing shall be installed in this location to separate the general public from the active construction areas of the project. The barricades and safety fencing shall be installed prior to the start of all other onsite activities. The Contractor shall modify and implement other construction methods as necessary to ensure the safety of the public in this area.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/USA/COE/DACA33/W912WJ13B0002/listing.html)
 
Record
SN03098308-W 20130626/130624235027-c4411c6f6ff81e17b88698315d830e4f (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.