Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY - FEDBIZOPPS ISSUE OF JULY 04, 2013 FBO #4240
SPECIAL NOTICE

Z -- Synopsis for Corpus Christi Ship Channel, Placement Areas (PAs) 10 and 13, in Nueces County, Texas.

Notice Date
7/2/2013
 
Notice Type
Special Notice
 
NAICS
237990 — Other Heavy and Civil Engineering Construction
 
Contracting Office
USACE District, Fort Worth, PO Box 17300/819 Taylor Street, Fort Worth, TX 76102-0300
 
ZIP Code
76102-0300
 
Solicitation Number
W9126G13B0020
 
Archive Date
7/2/2014
 
Point of Contact
Michael J Kassin, 409-766-3968
 
E-Mail Address
USACE District, Fort Worth
(michael.j.kassin@usace.army.mil)
 
Small Business Set-Aside
N/A
 
Description
W9126G-13-B-0020 This Synopsis is for the project description below that will be 100 % set aside as an open competition for small business. This announcement seeks to provide information to industry, on forth coming business opportunities. No proposals are being requested or accepted with this announcement. THIS IS NOT A SOLICITATION FOR PROPOSALS AND NO CONTRACT SHALL BE AWARDED FROM THIS ANNOUNCEMENT. The U.S. Army Corps of Engineers has been tasked to solicit for procurement and award a project for repairs and construction. Place of Performance Corpus Christi Ship Channel, Placement Areas (PAs) 10 and 13, in Nueces County, Texas. The Solicitation will be issued on or about 19 July 2013. Response date is 19 Aug 2013 @ 2:00 PM. Estimated award date; subject to availability of funding, 24 Sep 2013. This Operations and Maintenance (O&M) / Non-Federal Sponsor (Sponsor) funded contract will involve rock stabilization at PAs 10 & 13 to reduce further erosion of the existing PA levees. PA 10 is a confined PA located just north of the intersection of the Corpus Christi Ship Channel and the Gulf Intracoastal Waterway. PA13 is a confined PA located on the northeast end of the La Quinta Channel. Both PAs are located near Ingleside, Texas. Both PAs are accessible only by water. Initial and daily mobilization and demobilization will by water. Levee protection at both PAs will involve cut and fill, with geotextile, riprap, and blanket stone installation. PA 10 has an estimated 3,500 linear feet of stabilization required with approximately 850 linear feet of stabilization at PA 13. Also, PA 13 will require additional earthwork to restore levee slopes where erosion has created vertical scarps. The contract will be managed out of the Corpus Christi Resident Office, Corpus Christi, Texas. Estimated Construction Cost $1-5 Million Estimated award date; subject to availability of funding, 24 Sep 2013 Estimated Performance Time: 120 days Estimated Completion time: Jan 2014 NAICS Code: 237990 Questions about this synopsis may be inquired by fax, e-mail or mail to the attention of : Michael Kassin, Contract Specialist, Phone: (409) 766-3968, Fax (409) 766-3165 or email at michael.j.kassin@usace.army.mil. The mailing address is U.S. Army Corps of Engineers, Galveston District, 2000 Fort Point Road, Galveston, TX 77550.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/USA/COE/DACA63/W9126G13B0020/listing.html)
 
Record
SN03106088-W 20130704/130702235550-53ac8a88410e1809d65dc38704ae1461 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.