MODIFICATION
66 -- Thermal Cycling Chamber
- Notice Date
- 7/2/2013
- Notice Type
- Modification/Amendment
- NAICS
- 334513
— Instruments and Related Products Manufacturing for Measuring, Displaying, and Controlling Industrial Process Variables
- Contracting Office
- Department of Commerce, National Institute of Standards and Technology (NIST), Acquisition Management Division, 100 Bureau Drive, Building 301, Room B129, Mail Stop 1640, Gaithersburg, Maryland, 20899-1640, United States
- ZIP Code
- 20899-1640
- Solicitation Number
- SB1341-13-RQ-0204-02
- Archive Date
- 9/30/2013
- Point of Contact
- Joni L Laster, Phone: 301-975-8397, Todd D Hill, Phone: 301-975-8802
- E-Mail Address
-
joni.laster@nist.gov, todd.hill@nist.gov
(joni.laster@nist.gov, todd.hill@nist.gov)
- Small Business Set-Aside
- Total Small Business
- Description
- Amendment II The above solicitation is hereby amended to address vendor questions and answers as follows: Questions: Question: Specification 7. Does the chamber internal environment need to be monitored and the flow of (gases) regulated to maintain a specific concentration, or is this just a simple on/off purge system? Answer: Chamber internal environment needs to be monitored and the flow of (gases) regulated to maintain a specific concentration Question: Specification 8. Does this statement pertain to the humidity water supply only, or for the cascade refrigeration system? * The type of refrigeration system (air-cooled vs. water cooled) is not specified. Is the system to be air-cooled (integral or remote) or water cooled (and somehow self-contained as per #8)? Answer: Should be self-contained as per #8 Question: How many shelves are required, or do you prefer them listed optional, price each? Answer: A minimum of two shelves are required Question: Do you want to purchase the chamber with the LN2boost cooling, or would you prefer that to be listed optional? Answer: No, however, the system shall have the option to add it at a later date if the Government chooses to do so. Question: Does NIST require start-up and operator training on the chamber after purchase? Answer: The following requirements have been added to Line Item 0001: 19. INSTALLATION: The system shall be installed by the Contractor and meet contract specifications no later than two weeks after delivery. Installation, at a minimum, shall include uncrating/unpackaging of all equipment, rigging, set-up and hook-up of the system, demonstration of all specifications, and removal of trash. Onsite installation and demonstration shall be done at NIST, Gaithersburg, MD-Building 225. 20. TRAINING: The contractor shall conduct one (1) training session for up to six (6) users at NIST. The training shall provide a thorough demonstration of all system/solution functions, maintenance, data administration, and basic troubleshooting. The training may be completed at NIST immediately after installation/set-up, but shall be completed no later than 30 days after installation. The due date/time remain unchanged. All responses are due by 3pm EST, July 12, 2013.
- Web Link
-
FBO.gov Permalink
(https://www.fbo.gov/spg/DOC/NIST/AcAsD/SB1341-13-RQ-0204-02/listing.html)
- Place of Performance
- Address: 100 Bureau Drive, Gaithersburg, Maryland, 20899, United States
- Zip Code: 20899
- Zip Code: 20899
- Record
- SN03106599-W 20130704/130703000035-190d16861cdd1fe9d325fb84c60d8011 (fbodaily.com)
- Source
-
FedBizOpps Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's FBO Daily Index Page |