Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY - FEDBIZOPPS ISSUE OF JULY 28, 2013 FBO #4264
MODIFICATION

P -- Krassel Loft Building Demolition - Amendment 2

Notice Date
7/26/2013
 
Notice Type
Modification/Amendment
 
NAICS
238910 — Site Preparation Contractors
 
Contracting Office
Department of Agriculture, Forest Service, R-4 SW Idaho/Nevada Acquisition Center, 1249 S. Vinnell Way, SUITE 200, Boise, Idaho, 83709, United States
 
ZIP Code
83709
 
Solicitation Number
AG-0261-S-13-0093
 
Point of Contact
Tanya E. Arnberger, Phone: 2083734186
 
E-Mail Address
tearnberger@fs.fed.us
(tearnberger@fs.fed.us)
 
Small Business Set-Aside
Service-Disabled Veteran-Owned Small Business
 
Description
SF30 AMENDMENT 000002 THE PURPOSE OF THIS AMENDMENT IS TO ANSWER QUESTIONS SUBMITTED AND TO POST THE LIST OF COMPANIES AND/OR INDIVIDUALS THAT ATTENDED THE SITE VISIT. PLEASE SEE ATTACHMENT 1. PLEASE NOTE THAT THE SOLICITATION DUE DATE HAS NOT BEEN EXTENDED AND QUOTES ARE STILL DUE ON JULY 31, 2013. PLEASE ENSURE THAT YOU RETURN A SIGNED COPY OF THE SF30. AMENDMENT 000001 THE PURPOSE OF THIS AMENDMENT IS TO MODIFY THE SCOPE OF WORK AND TO INFORM VENDORS OF A SITE VISIT SCHEDULED FOR JULY 25, 2013. PLEASE SEE SF30 AND ATTACHMENT 1. THE SOLICITATION DUE DATE HAS NOT BEEN EXTENDED AND QUOTES ARE STILL DUE ON JULY 31, 2013. PLEASE ENSURE YOU RETURN A SIGNED COPY OF THE SF30. This project consists of demolishing the Krassel Loft Building. The demolition work will include complete demolition and removal of all building materials including all wood and brick, concrete foundation walls and basement floor, concrete porches and deck adjoining the building and concrete walkways located to the east of the building, all electrical and plumbing systems including sump drain found on east side of building, and any other building materials found within 5 feet of the building footprint. The project will require performing an Asbestos Building Inspection, preparing an Asbestos Inspection Report and Pre-Demolition Asbestos Inspection Report, and abating and removing identified asbestos containing materials. Coordination with respective utility companies for shut-off and disconnect of utilities (i.e. water, sewer, & power) will be required. The resulting excavation will need to meet OSHA standards.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/USDA/FS/261/AG-0261-S-13-0093/listing.html)
 
Place of Performance
Address: 500 North Mission Street, McCall, Idaho, United States
 
Record
SN03128619-W 20130728/130726234746-fa403f16312166a2283a457818a6c4cf (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.