MODIFICATION
Y -- FSR 1107 Anderson Road Decommissioning - Quoter's Copy to Submit - Solicitation 1
- Notice Date
- 7/29/2013
- Notice Type
- Modification/Amendment
- NAICS
- 237310
— Highway, Street, and Bridge Construction
- Contracting Office
- Department of Agriculture, Forest Service, R-6 Northwest Contracting Area, Mt. Baker-Snoqualmie NF, 2930 Wetmore Avenue Ste 3A, Everett, Washington, 98201, United States
- ZIP Code
- 98201
- Solicitation Number
- AG-05M6-S-13-0026
- Response Due
- 8/19/2013 3:30:00 PM
- Point of Contact
- Brian A. Johnson, Phone: 4257836056, Jorge A. Somoza, Phone: (425) 783-6053
- E-Mail Address
-
bajohnson03@fs.fed.us, jsomoza@fs.fed.us
(bajohnson03@fs.fed.us, jsomoza@fs.fed.us)
- Small Business Set-Aside
- Total Small Business
- Description
- Solicitation AG-05M6-S-13-0026 Quoter's copy to submit to the Forest Service Contracting Officer PROJECT DESCRIPTION Anderson Road Decommissioning (FSR1107)-The intent of this construction contract is to provide Road Decommissioning for a portion of Forest Service Road (FSR) 1107 on the Mt. Baker-Snoqualmie National Forest (Mt. Baker Ranger District). The project consists of removing existing culverts and restoring the pre-existig stream channel or constructing a drainage dip as well as constructing a road closure berm. The Contractor shall furnish all labor, materials, equipment, tools, transportation and supplies, and perform all work required to repair the road according to the drawings and specifications of the contract. The Contractor shall assume all risk, loss, damage, or expense arising out of prosecution of the work, except as otherwise provided in the contract. ESTIMATED DATE SOLICITATION WILL BE ISSUED July 29, 2013 PROJECT LOCATION From Burlington, Washington, proceed East on State Route 20 for 35 miles to the intersection "Baker Lake Road". Proceed North on Baker lake road 11.5 miles to the intersection of FSR 1106 on right. Proceed East on FSR 1106 approx. 2 miles crossing the Baker Lake Dam. ¼ mile past the Baker Lake Dam, the road will become FSR 1107. Proceed on FSR 1107 for approx. 8.9 miles until reaching the junction of FSR 1107022. Beginning of Project is located along FSR 1107 at MP 9.8 in Township 37 North, Range 9 East, Section 32. PROJECT MAPS & DRAWINGS The project maps and drawings are attached. MAGNITUDE OF CONSTRUCTION PROJECT (FAR 36.204) Less than $25,000.00 PERFORMANCE, PAYMENT, AND BID BONDS Not Required ESTIMATED TIME TO COMPLETE PROJECT 30 Calendar Days ESTIMATED DATE TO START PROJECT August 2013 PRE-BID MEETING Will not be held POINTS OF CONTACT Business Team : Brian A. Johnson, Contracting Officer, (425) 783-6056, bajohnson03@fs.fed.us Technical Team : James B. Mitchell, North Zone Team Leader/Roads Manager, (360) 854-2620, jbmitchell@fs.fed.us
- Web Link
-
FBO.gov Permalink
(https://www.fbo.gov/spg/USDA/FS/05M6/AG-05M6-S-13-0026/listing.html)
- Place of Performance
- Address: 2930 Wetmore Ave., Suite 3A, Everett, Washington, 98201, United States
- Zip Code: 98201
- Zip Code: 98201
- Record
- SN03129797-W 20130731/130729234347-3850b625344324295b3fa1d30c67ca36 (fbodaily.com)
- Source
-
FedBizOpps Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's FBO Daily Index Page |