Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY - FEDBIZOPPS ISSUE OF AUGUST 09, 2013 FBO #4276
MODIFICATION

Z -- REDFISH LAKE ROAD CONSTRUCTION PROJECT 2013

Notice Date
8/7/2013
 
Notice Type
Modification/Amendment
 
NAICS
237990 — Other Heavy and Civil Engineering Construction
 
Contracting Office
Department of Agriculture, Forest Service, R-4 SW Idaho/Nevada Acquisition Center, 1249 S. Vinnell Way, SUITE 200, Boise, Idaho, 83709, United States
 
ZIP Code
83709
 
Solicitation Number
AG-0261-S-13-0071
 
Archive Date
10/1/2013
 
Point of Contact
KAREN L. MORTHLAND, Phone: 2083734115, SHAWN ROBNETT, Phone: (208) 737-3206
 
E-Mail Address
KMORTHLAND@FS.FED.US, SROBNETT@FS.FED.US
(KMORTHLAND@FS.FED.US, SROBNETT@FS.FED.US)
 
Small Business Set-Aside
Total Small Business
 
Description
REDFISH LAKE ROAD CONSTRUCTION PROJECT -- SAWTOOTH SNRA IN APPROXIMATELY 15 DAY'S, THE SOLICITATION FOR THIS CONSTRUCTION PROJECT WILL BE AVAILABLE TO VIEW AND PRINT. The intent of the contract is to provide for the complete construction of the project described in the contract. Unless otherwise provided, the Contractor shall furnish all labor, materials, equipment, tools, transportation, and supplies and perform all work required to complete the project in accordance with drawings, specifications, and provisions of the contract. This project proposes to realign the main access road (Forest Road 70214) into the Redfish Lake Recreation Complex out of an existing wetland by constructing approximately one (1) mile of new asphalt roadway including the construction of a new 90 feet long bridge that fully spans Redfish Lake Creek. Work also includes but is not limited to construction survey & staking, clearing & grubbing, extensive earthwork including excavation & embankment, and rock/boulder removal, crushing, and micro-blasting, installation of new gravity sewer along the full length of the road construction including the necessary hangers/supports/etc. for support under the new bridge structure, installation of drainage facilities consisting of culverts, catch basins, and roadside ditches, construction of new cement concrete curbing including cement concrete truck apron, new guardrail in conjunction with the new bridge construction, signing, striping, decommissioning of the existing roadway including re-contouring to render the roadway in its preconstruction condition, removal of one (1) existing timber bridge, and removal of the existing gravity sanitary sewer system, and construction of other miscellaneous improvements. LOCATION AND DESCRIPTION From Stanley, Idaho proceed south approximately four (4) miles on Idaho State Highway #75 to the junction with Forest Road 70214. Turn right onto Forest Road 70214 and proceed approximately 0.80 mile to the point of beginning of the new road realignment. From there proceed approximately another 0.80 mile along the existing Forest Road 70214 to the point of ending of the new road realignment. The approximate location of the bridge crossing is located at 44º 09' 05" N and 114º 54' 50" W. Pre-bid meeting is scheduled for August 15, 2013 at 1100 MDT at the worksite. CONTACT SHAWN ROBNETT (208) 737-3206 FOR MORE INFORMATION. Estimated Price Range - Between $1,000,000 to $5,000,000 Contract Time Will Be from September 30, 2013 through September 30, 2014. NAICS Code: 237990 Size Standard: $33.5 This proposed procurement is a TOTAL SMALL BUSINESS set aside.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/USDA/FS/261/AG-0261-S-13-0071/listing.html)
 
Place of Performance
Address: STANLEY, Idaho, United States
 
Record
SN03141166-W 20130809/130808000505-5be693ded39e8494ffd1c923f5fe886c (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.