SOLICITATION NOTICE
Z -- IPNF Culvert Replacements
- Notice Date
- 8/8/2013
- Notice Type
- Presolicitation
- NAICS
- 237310
— Highway, Street, and Bridge Construction
- Contracting Office
- Department of Agriculture, Forest Service, R-1 IMAT: Clearwater; Idaho Panhandle; Kootenai; and Nez Perce NF's, 3815 Schreiber Way, Coeur d'Alene, Idaho, 83815-8363, United States
- ZIP Code
- 83815-8363
- Solicitation Number
- AG-02RC-S-13-0119
- Archive Date
- 10/1/2013
- Point of Contact
- Leslie L. Solberg, Phone: 208-765-7433, Josh Nelson, Phone: (208) 765-7257
- E-Mail Address
-
lsolberg@fs.fed.us, jnelson@fs.fed.us
(lsolberg@fs.fed.us, jnelson@fs.fed.us)
- Small Business Set-Aside
- Total Small Business
- Description
- Description of Work This project consists of three general locations along Forest Service Road 1007. One location is near the jct of road 408 road and another location near the jct of road 632 and the third location located approximately near the middle of road 1007. All three locations will involve excavation of existing culverts and proper disposal of the culverts. In place of the old culverts, new culverts will be placed. Pit run aggregate and will be hauled from a commercial source and placed on geotextile that is placed on the existing road surface; to repair a damaged soft area of the road. Commercial source surfacing material will be hauled and placed onto this pitrun aggregate, to re-establish the road surface and placed as culvert bedding and surfacing over each new culvert installed. Once the roadway has been re-established, the culverts will be armored at the inlet and outlet with Commercial Source Riprap material, and placed to prevent erosion. Lastly, commercial source riprap will be placed at two fill failure locations to re-establish the fill slope along the road. Project Location The project location may be reached by taking HWY 95 south out of Bonners Ferry, Idaho. Travel along highway 95 north for approximately 2.5 miles and turn west onto Deep Creek Road. Continue for approximately 3 miles and turn West onto Lions Den Road/West Side Road. Follow this road for approximately 1.5 miles and turn left (West) onto National Forest System Lands and onto Road #408. After approximately 9.3 miles until arrived at project road location start. The project site starts here as shown on Vicinity Map; continue along Forest Road #1007 for approximately 7 miles through project area. Two of the culverts are in the project work area as located in the Section 34, Township 62 North, Range 2 West. One culvert is located in Section 1, Township 61 North, Range 2 West. The last two culverts are located in Section 11, Township 61 North, Range 2 West. (All Reference Boise Meridian). The two fill repair locations and the road repair location are all within the same vicinity as the 5 culverts located above. The solicitation for this project will be posted on or around 08/23/2013. The Government's estimated price range is between $25,000 and $100,00
- Web Link
-
FBO.gov Permalink
(https://www.fbo.gov/spg/USDA/FS/281/AG-02RC-S-13-0119/listing.html)
- Place of Performance
- Address: Sandpoint Ranger District, 1602 Ontario Street, Sandpoint, Idaho, 83864, United States
- Zip Code: 83864
- Zip Code: 83864
- Record
- SN03142260-W 20130810/130808235519-ac5b78b756753befe2c76e415f676192 (fbodaily.com)
- Source
-
FedBizOpps Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's FBO Daily Index Page |