Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY - FEDBIZOPPS ISSUE OF AUGUST 15, 2013 FBO #4282
AWARD

Z -- Pump No. 3 Rehabilitation and Restoration of Stop Gates, Fox Point Hurricane Barrier, Providence, RI

Notice Date
8/13/2013
 
Notice Type
Award Notice
 
NAICS
238290 — Other Building Equipment Contractors
 
Contracting Office
USACE District, New England, 696 Virginia Road, Concord, MA 01742-2751
 
ZIP Code
01742-2751
 
Solicitation Number
W912WJ-13-B-0007
 
Response Due
6/11/2013
 
Archive Date
9/12/2013
 
Point of Contact
Raushanah Muhammad, 9783188478
 
E-Mail Address
USACE District, New England
(raushanah.m.muhammad@usace.army.mil)
 
Small Business Set-Aside
N/A
 
Award Number
W912WJ-13-C-0013
 
Award Date
8/12/2013
 
Awardee
CHAS G. ALLEN INC (001125657) <br> 25 Williamsville Rd <br> Barre, MA 01005-9502
 
Award Amount
$1,307,382.00
 
Line Number
0001-0004
 
Description
Work will consist of the disassembly, overhauling of components, reinstallation, and operational testing of Pump No. 3 to include the dewatering of the intake sump. The overhauling will consist of restoring, repairing, and/or replacing packings, glands, seals, seal retainers, shaft sleeves, cover pipe, bolts, nuts, and washers, removal and replacement of existing bearing temperature indicators, rebuilding and alignment of upper guide bearing and motor bearing, removal and replacement of lower guide bearing, realignment and balancing of pump impeller, cleaning, examination and metal stitching on the inside surface of the existing diffuser, the cleaning and recoating of the exterior of the exterior surface of the discharge column and backwater closure valve, removal and replacement of the automatic grease injection system, refurbishing the anti-rotation brakes and the hydraulic system for the backwater closures, and nondestructive testing of the existing impeller. Prior to and after each lift, the onsite 40-ton overhead crane will be inspected and load tested. The work will also include the restoration of eight existing 12 feet long by 6.5 feet wide by 1 foot thick metal stop gates upon the completion of overhauling and rehabilitating Pump No. 3. Restoration will include loading, securing, and transporting the stop gates to an offsite facility, where they will be cleaned, surface prepped, and coated (painted). Upon completion of restoration, stop gates will be loaded, secured, and transported back to Fox Point, to be unloaded and stacked in storage area. To restoration of stop gates will include the removal and replacement of existing rubber seals on each stop gate. Assurance will be required that all debris and hazardous and nonhazardous waste generated during cleaning and surface preparation will be properly disposed of from the facility where the work is to be completed. The optional lead abatement work is also awarded at this time.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/USA/COE/DACA33/W912WJ-13-B-0007/listing.html)
 
Record
SN03146865-W 20130815/130813235413-3d6e291a03a6ba0eebd5fe12c12b2a3a (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.