AWARD
Z -- Pump No. 3 Rehabilitation and Restoration of Stop Gates, Fox Point Hurricane Barrier, Providence, RI
- Notice Date
- 8/13/2013
- Notice Type
- Award Notice
- NAICS
- 238290
— Other Building Equipment Contractors
- Contracting Office
- USACE District, New England, 696 Virginia Road, Concord, MA 01742-2751
- ZIP Code
- 01742-2751
- Solicitation Number
- W912WJ-13-B-0007
- Response Due
- 6/11/2013
- Archive Date
- 9/12/2013
- Point of Contact
- Raushanah Muhammad, 9783188478
- E-Mail Address
-
USACE District, New England
(raushanah.m.muhammad@usace.army.mil)
- Small Business Set-Aside
- N/A
- Award Number
- W912WJ-13-C-0013
- Award Date
- 8/12/2013
- Awardee
- CHAS G. ALLEN INC (001125657) <br> 25 Williamsville Rd <br> Barre, MA 01005-9502
- Award Amount
- $1,307,382.00
- Line Number
- 0001-0004
- Description
- Work will consist of the disassembly, overhauling of components, reinstallation, and operational testing of Pump No. 3 to include the dewatering of the intake sump. The overhauling will consist of restoring, repairing, and/or replacing packings, glands, seals, seal retainers, shaft sleeves, cover pipe, bolts, nuts, and washers, removal and replacement of existing bearing temperature indicators, rebuilding and alignment of upper guide bearing and motor bearing, removal and replacement of lower guide bearing, realignment and balancing of pump impeller, cleaning, examination and metal stitching on the inside surface of the existing diffuser, the cleaning and recoating of the exterior of the exterior surface of the discharge column and backwater closure valve, removal and replacement of the automatic grease injection system, refurbishing the anti-rotation brakes and the hydraulic system for the backwater closures, and nondestructive testing of the existing impeller. Prior to and after each lift, the onsite 40-ton overhead crane will be inspected and load tested. The work will also include the restoration of eight existing 12 feet long by 6.5 feet wide by 1 foot thick metal stop gates upon the completion of overhauling and rehabilitating Pump No. 3. Restoration will include loading, securing, and transporting the stop gates to an offsite facility, where they will be cleaned, surface prepped, and coated (painted). Upon completion of restoration, stop gates will be loaded, secured, and transported back to Fox Point, to be unloaded and stacked in storage area. To restoration of stop gates will include the removal and replacement of existing rubber seals on each stop gate. Assurance will be required that all debris and hazardous and nonhazardous waste generated during cleaning and surface preparation will be properly disposed of from the facility where the work is to be completed. The optional lead abatement work is also awarded at this time.
- Web Link
-
FBO.gov Permalink
(https://www.fbo.gov/spg/USA/COE/DACA33/W912WJ-13-B-0007/listing.html)
- Record
- SN03146865-W 20130815/130813235413-3d6e291a03a6ba0eebd5fe12c12b2a3a (fbodaily.com)