Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY - FEDBIZOPPS ISSUE OF AUGUST 16, 2013 FBO #4283
MODIFICATION

43 -- high-vacuum turbomolecular pumps, cryogenic pumps and dry roughing pumps

Notice Date
8/14/2013
 
Notice Type
Modification/Amendment
 
NAICS
333911 — Pump and Pumping Equipment Manufacturing
 
Contracting Office
Department of Commerce, National Institute of Standards and Technology (NIST), Acquisition Management Division, 100 Bureau Drive, Building 301, Room B129, Mail Stop 1640, Gaithersburg, Maryland, 20899-1640, United States
 
ZIP Code
20899-1640
 
Solicitation Number
SB1341-13-RP-0076
 
Archive Date
9/4/2013
 
Point of Contact
Eric Bubar, Phone: 3019753635
 
E-Mail Address
eric.bubar@nist.gov
(eric.bubar@nist.gov)
 
Small Business Set-Aside
N/A
 
Description
Amendment 2 The purpose of this Amendment 2 is to provide Questions and Answers. Q1: Regarding the CTI Cryo pump, do you need just the pump? A1: Only the pump is needed. For all of the pumps, unless it is a direct replacement the controller and interfacing requirements to make the pump operational are also required. Q2: Are rebuilt pumps acceptable? Are new replacements acceptable for discontinued models? A2: Yes and Yes. Q3: What are the general process types for the toxic pumps? A3: Toxic pumps equivalent to Harsh Process, Corrosive, Heavy Duty, etc. Different vendors call these different things. Q4: What are the exact flange types for each pump? A4: The flange types listed in Table 1 are taken directly from the manufacturers' data sheets. Q5: Can you provide information regarding interface requirements? A5: Interfaces shall be direct wire and size replacements. See manufacturers' data sheets for more details. Q6: Please explain the 3 year contract period with respect to pricing. A6: Pricing is to determine awardee and for the first task order, which will be issued during FY2013. After that NIST task orders will be competed among all IDIQ contract holders. The task orders will be competed on price. A vendor is not required to bid on every task order. If NIST requires a pump that is discontinued at any point during the 3 year period NIST will then compete a task order for an equivalent model.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/DOC/NIST/AcAsD/SB1341-13-RP-0076/listing.html)
 
Record
SN03149530-W 20130816/130815000124-f29411a5c7ad46c0876462be78e15ee8 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.