Y -- Sandy Lake Paving Project, McGregor, Minnesota.

Notice Date
8/16/2013
 
Notice Type
Modification/Amendment
 
NAICS
237310 — Highway, Street, and Bridge Construction
 
Contracting Office
USACE District, St. Paul, Contracting Division CEMVP-CT, 180 East Fifth Street, St. Paul, MN 55101-1678
 
ZIP Code
55101-1678
 
Solicitation Number
W912ES-13-T-0105
 
Response Due
8/22/2013 2:00:00 PM
 
Archive Date
10/1/2013
 
Point of Contact
Patricia M. Simon, Phone: 6512905418, Kevin P. Henricks, Phone: 6512905414
 
E-Mail Address
patricia.m.simon@usace.army.mil, kevin.p.henricks@usace.army.mil
(patricia.m.simon@usace.army.mil, kevin.p.henricks@usace.army.mil)
 
Small Business Set-Aside
Total Small Business
 
Description
The following Questions were received regarding this solicitation; the Corps response follows each question: Question 1. There is no grading plan, so am I to assume the existing grade is ready to accept the 6" of class 5 and 3 ½" of bituminous on the parking lot and the 2 ½" of bituminous on the trail RESPONSE: SEE Amendment 0002 for changes Question 2. There is a prime coat called out for in the specifications. We haven't completed a project requiring prime coat since the early 1970's, it is an antiquated specification that is no longer used in this area RESPONSE: SEE Amendment 0002 (REMOVED PRIME COAT REQUIREMENT) Question 3. There will be an enormous cost to apply this minor amount of prime coating material (MC-30 or MC-70)as required in the proposal (between 3 and 10 gallons).Due to the fact this is such a small amount of material to apply (and it is never used)we would have to either have a tanker load delivered or mobilize our tack truck to a refinery and purchase a minimum of 500 gallons to be able to heat the material to be able to apply it as required RESPONSE: SEE Amendment 0002 (REMOVED PRIME COAT REQUIREMENT) Question 4. Can the path be paved to a minimum 8 ½' at its narrowest? Paver machines generally will pave a minimum of 8' 6". A 6' trail can be installed by hand, but you will get a nicer looking and economical job using a machine RESPONSE: The trail size must remain as required in the specifications however, adjacent trees shown on the drawing at that point of the trail will be removed to allow room for equipment Question 5. I'm assuming the mix design in the section 2.3 main construction items (STWEB235B) is supposed to be (SPWEB230B) or (SPWEB235B)? RESPONSE: SEE Amendment 0002 for changes Question 6. In the materials section 2.5 the LVNW3 and LVWE3 spec is a contradiction to the SPWEB235B spec, LV designs have been replaced with SP RESPONSE: SEE Amendment 0002 for changes
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/USA/COE/DACA37/W912ES-13-T-0105/listing.html)
 
Place of Performance
Address: US ARMY CORPS OF ENGINEERS, SANDY LAKE RECREATION AREA, 22205 531st Lane, McGregor, Minnesota, 55744, United States
Zip Code: 55744
 
Record
SN03152535-W 20130818/130816235232-e57b9e4b81bf349cb5b665ccb4fa5d38 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.