Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY - FEDBIZOPPS ISSUE OF SEPTEMBER 29, 2013 FBO #4327
AWARD

Y -- Herbert Hoover Dike Rehabilitation - Structure Replacements S-268 (C-8) and S-272 (C-13) Reconstruction, Okeechobee and Palm Beach Counties, Florida

Notice Date
9/27/2013
 
Notice Type
Award Notice
 
NAICS
237990 — Other Heavy and Civil Engineering Construction
 
Contracting Office
USACE District, Jacksonville, P.O. Box 4970, Jacksonville, FL 32232-0019
 
ZIP Code
32232-0019
 
Solicitation Number
W912WP-13-R-0027
 
Archive Date
10/27/2013
 
Point of Contact
Weston Worsham, 904-232-1921
 
E-Mail Address
USACE District, Jacksonville
(charles.w.worsham@usace.army.mil)
 
Small Business Set-Aside
N/A
 
Award Number
W912EP-13-C-0030
 
Award Date
9/27/2013
 
Awardee
HARRY PEPPER & ASSOCIATES, INC. (009821422) <br> 9000 REGENCY SQUARE BLVD FL 1 <br> JACKSONVILLE, FL 32211-8115
 
Award Amount
$36,096,436.72
 
Line Number
0001
 
Description
The work includes demolition and removal of the existing Herbert Hoover Dike Culverts 8 and 13 and the construction of new water control structures S-268 and S-272 at the respective existing locations of Culverts 8 and 13. The demolition and reconstruction efforts will require the installation of earthen cofferdams within Lake Okeechobee and steel sheet pile cofferdams at the landside of each culvert in order to dewater each construction site. These structures will include cast-in-place reinforced concrete foundations, headwalls, and three (3) culvert barrels with steel liners. Combination flap/slide gates will be installed at the lakeside headwall of each structure. S-268 will consist of three (3) 10-foot diameter culverts approximately 197 feet long. S-272 will consist of three (3) 10-foot diameter culverts approximately 171 feet long. A cutoff wall will also be installed in the centerline of the embankment at each site. The embankments will be reconstructed to match the existing crest elevation of the dike. Riprap will be installed along the lakeside embankment faces, and control buildings will be installed at the landside work platform at each structure. Work also includes by-pass pumping, grassing, and turbidity monitoring.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/USA/COE/DACA17/Awards/W912EP-13-C-0030.html)
 
Record
SN03205167-W 20130929/130927234810-f0b0bc4899b84506310f8bbbb126b222 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.