SOLICITATION NOTICE
J -- Cleaning of all propane and oil boilers on center as identified
- Notice Date
- 10/8/2013
- Notice Type
- Combined Synopsis/Solicitation
- NAICS
- 238220
— Plumbing, Heating, and Air-Conditioning Contractors
- Contracting Office
- Department of Labor, Employment Training Administration, Red Rock Job Corps Center, Route 487 North, Lopez, Pennsylvania, 18628
- ZIP Code
- 18628
- Solicitation Number
- Centerboilercleaning13_003
- Archive Date
- 11/5/2013
- Point of Contact
- Theresa Insinger, Phone: 5704770203, Robin Young, Phone: 5704770192
- E-Mail Address
-
insinger.theresa@jobcorps.org, young.robin@jobcorps.org
(insinger.theresa@jobcorps.org, young.robin@jobcorps.org)
- Small Business Set-Aside
- N/A
- Description
- This is a subcontracting opportunity. Scope of Project: Cleaning of all oil fired and propane fired boilers, (hot water and steam), and hot water heaters as identified on center. This will include new oil filters, new air filters, new nozzles, new pump screens and cleaning of the wet side of steam and hot water boilers to include the following; float controls and floats, low water cut offs and brushing of the water jackets. Dry side cleaning shall include the following; unit in general, Combustion chamber and stack. The contractor shall include all replacement parts and labor associated with quarterly/annual cleaning of all noted equipment. All burner assemblies to be removed, cleaned of all debris, replace nozzles and electrodes, if needed. Adjust flame, air, stack damper, and oil pressure, as needed. All fuel pumps are to be removed, cleaned and new pump screens installed. All fuel filters, seals and gaskets are to be replaced. Contractor will be required to meet any lubrication specifications as prescribed by the equipment manufacturer. After setup, contractor will test for proper flame and test for combustion leaks. Set up of all units will include a smoke and efficiency test as prescribed by the equipment manufacturer. A printout of each unit test will be given to the maintenance manager or person acting in position. Oil Fired Hot Air Units: Bldg. 124.Modine unit/ Becket burner/100,000 BTU Bldg. 11.Armstrong unit/Becket burner/227,00 BTU Cleveland Door back unit/Wayne burner/350,000 BTU Bldg. 12Armstrong unit/Becket burner/ 227,000 BTU Bldg. 109UHI-Cell unit/Becket burner/140,000 BTU Bldg. 102Ultra 80 unit/Becket burner/97,000 BTU Bldg. 110Ultra unit/Becket burner/97,000 BTU Bldg. 101Armstrong unit/Becket burner/113,000 BTU Bldg. 27F. Uni-cell unit/Becket burner/105,000 BTU Bldg. 106Armstrong unit/Becket burner/113,000 BTU Bldg. 105Carrier unit/Becket burner/85,000 BTU Oil Fired Hot Water Units: Bldg. 14Weil-Mclain boiler/Becket burner/227,000 BTU Bldg. 111Weil-Mclain boiler/Becket burner/100,00 BTU Bldg. 104Peerless boiler/Becket burner/112,00 BTU Bldg. 103Peerless boiler/Becket burner/157,000 BTU Bldg. 15Weil-Mclain/Becket burner/521,000BTU Bldg. 58HB Smith boilers (2)/Becket burners/211,000 BTU each Bldg. 113HB Smith boiler/Carlin 100CRD burner/142,000 BTU Oil Fired Steam Boilers: Bldg 10 Burnham/4.00 80deg. Hollow Bldg. 13 Donlee mod.# 300VTB-30-2-Wet Back/30 hp/9.0 firing rate (1-2.00 80 Deg. A &2-3.50 80 deg. A nozzles) Bldg. 16Donlee mod.# 320VTB-10-2-Dry Back/10 hp/3.1 firing rate (2.50 80 deg. B nozzle) Bldg. 17 Smith 19-4 series/310,000 BTU/ Power Flame Model CR1-OHBS-4/2.00 90 deg. R nozzle Bldg. 18 Donlee mod# 320VTB-10-2-wet back/10 hp/3.1 firing rate (2.50 80 deg. B Nozzle) Bldg. 19 Donlee mod. # 300VTB-30-2-Wet back/30 hp/9.0 firing rate (1-2.00 80 deg. A & 2- 3.50 80 deg. A nozzles) Bldg. 20 Donlee mod.# 320VTB-10-2-Wet Back/10 hp/3.1 firing rate (2.50 80 deg. B Nozzle) Bldg. 22 Donlee mod.# 320VTB-20-2-Wet Back/20 hp/6.2 firing rate (2-3.00 80 deg. B nozzle) Bldg. 22 Burnham 1,100,000 BTU max output Bldg. 24 Donlee mod. # 320VTB-20-2 Wet Back/20 hp/6.2 firing rate (5.00 80 deg. B nozzle) Bldg. 27 HB Smith 19A-8 series/797,000 BTU/ Power Flame CR1-OHBS-4/ Bldg. 31 HB Smith 19-5 series/397,000 BTU/2.50 90 deg. B Propane Fired Hot Water Boilers: Bldg. 108Peerless boiler/130,000 BTU Bldg 107Peerless boiler/130,000 BTU Bldg. 114 Peerless boiler/130,000 BTU Bldg. 115Peerless Boiler/130,000 BTU Bldg. 8Peerless boiler/210,000 BTU Contractor must verify all details through attendance at a mandatory pre-bid walk through scheduled for October 14, 2013. A complete bid package will be distributed at the pre-bid walk through. The bidders shall conform to the latest Davis-Bacon prevailing wage rate decisions for the area.
- Web Link
-
FBO.gov Permalink
(https://www.fbo.gov/spg/DOL/ETA/RedRockJCC/Centerboilercleaning13_003/listing.html)
- Place of Performance
- Address: Route 487 North, Lopez, Pennsylvania, 18628, United States
- Zip Code: 18628
- Zip Code: 18628
- Record
- SN03212952-W 20131010/131008233902-4decc53326f735271f14dd1a508a95b3 (fbodaily.com)
- Source
-
FedBizOpps Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's FBO Daily Index Page |