Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY - FEDBIZOPPS ISSUE OF OCTOBER 10, 2013 FBO #4338
AWARD

Y -- New Orleans to Venice, NOV-07b, Fronting Protection, Sunrise & Grand Liard Pump Station, Plaquemines Parish, Louisiana.

Notice Date
10/8/2013
 
Notice Type
Award Notice
 
NAICS
237990 — Other Heavy and Civil Engineering Construction
 
Contracting Office
USACE District, New Orleans, ATTN: CEMVN-CT, P.O. Box 60267, New Orleans, LA 70160-0267
 
ZIP Code
70160-0267
 
Solicitation Number
NOV07B-11-H-0029
 
Response Due
9/16/2013
 
Archive Date
11/23/2013
 
Point of Contact
Jason M. Carlock, 601-631-5793
 
E-Mail Address
USACE District, New Orleans
(jason.m.carlock@usace.army.mil)
 
Small Business Set-Aside
N/A
 
Award Number
W912P8-11-D-0004-0005
 
Award Date
10/7/2013
 
Awardee
Healtheon, Inc. (086722878) <br> 201 St Charles Ave Ste 4310 <br> New Orleans, LA 70170-4302
 
Award Amount
$23,613,324.52
 
Line Number
0001
 
Description
The work consists of installation and removal of test piles, testing of H-Piles in compression and in tension, dynamic and restrike load testing, and recording and reporting of test results, supply of all test pile materials, labor and equipment, including but not limited to H-piles to be tested, reaction piles and load frames, loading equipment, load measuring equipment, and equipment to handle, install, and test piles, reaction piles, load frames, and testing equipment; installation and removal of granular preload material; installation of vertical wick drains; installation, monitoring and removal of geotechnical instrumentation; partial demolition of existing reinforced concrete walls; partial removal of existing steel storm water discharge piping; removal of existing steel storm water discharge bells; construction of new pile founded T-walls; modification of existing reinforced concrete walls; extension of existing steel storm water pump discharge pipes; installation of new butterfly valves and stainless steel discharge bells on the storm water discharge pipes; installation of pneumatic valve operators and modifications to the existing pneumatic systems; construction of steel elevated walkways and stairs; installation of new walkway lighting; construction of access ramps, construction of earth wave berms; and construction of concrete and stone erosion protection.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/USA/COE/DACA29/NOV07B-11-H-0029/listing.html)
 
Record
SN03213028-W 20131010/131008233943-e319d26fef76dcad3c5c2caaf024b068 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.