Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY - FEDBIZOPPS ISSUE OF OCTOBER 13, 2013 FBO #4341
SOLICITATION NOTICE

Y -- ND FTNP THRO 11(6)

Notice Date
10/11/2013
 
Notice Type
Presolicitation
 
NAICS
237310 — Highway, Street, and Bridge Construction
 
Contracting Office
Department of Transportation, Federal Highway Administration (FHWA), Central Federal Lands Highway Division, 12300 West Dakota Avenue, Lakewood, Colorado, 80228
 
ZIP Code
80228
 
Solicitation Number
DTFH68-13-B-00017
 
Archive Date
12/31/2013
 
Point of Contact
Aaron L. Sanford, Phone: 7209633090, Jason J Longshore, Phone: 7209633090
 
E-Mail Address
aaron.sanford@dot.gov, jason.longshore@dot.gov
(aaron.sanford@dot.gov, jason.longshore@dot.gov)
 
Small Business Set-Aside
N/A
 
Description
THIS IS NOT AN INVITATION FOR BID. PLANS AND SPECIFICATIONS ARE NOT YET AVAILABLE. TENTATIVE ADVERTISEMENT DATE IS OCT 25, 2013. PLANS AND SPECIFICATIONS WILL BE AVAILABLE AT THAT TIME. PROJECT DETAILS: ND PRA THRO 11(6), South Unit Loop Road Theodore Roosevelt National Park is located in the badlands of western North Dakota. The majority of the work in the park will be performed in South Unit with some additional work in the North Unit. The project consists of three different possible award schedules (A, B and C) and one option (X). The project locations are as follows: South Unit: The South Unit entrance is in Medora, ND. Medora is accessible via Interstate 94 Exits 24 and 27 in North Dakota. Medora is 133 miles west of Bismarck, ND and 27 miles east of the Montana state line. North Unit: The North Unit entrance is along U.S. Highway 85, approximately 16 miles south of Watford City, ND and 50 miles north of Belfield, ND. The distance by road from Medora to the North Unit is approximately 70 miles. I-94 travelers can access U.S. Highway 85 at Exit 42 in Belfield, ND. ND FTNP THRO 11(6), South Unit Loop Road: work in the South Unit will include resurfacing, restoration, and rehabilitation (3R) of the existing roadway; ERFO repair work will be performed in the North Unit. The 3R work in the South Unit will consist of roadway survey and layout, cement or fly ash treated roadway pulverization, Superpave asphalt resurfacing, and concrete work (curb, gutter, parking stalls and sidewalks). Traffic will have to be maintained at all times during construction. The contractor will be responsible for surveying the existing roadway and laying out the new roadway profile to correct any and all deficiencies and undulations. All pulverized surfaces will be resurfaced within 14 days. A material transfer vehicle (MTV) will be required for all Superpave asphalt resurfacing. All concrete work will be colored according to the contract documents. A majority of the concrete work involves parking stalls and sidewalks that will be required to meet the Americans with Disabilities Act (ADA) standards. The ERFO repair work in the North Unit include survey, embankment construction with placement of geogrid, sub-excavation (entire roadway width at over 6' deep), drainage, paving, erosion control, permanent and revegetation. Traffic will be maintained during construction with lane closures for part of the work. The other part of the repair work in the North Unit will be closed to traffic. This work has to be completed prior to May 15, 2014 so it may have to be performed under severe winter or wet conditions. Major quantities include (quantities depend on which schedule is awarded): • Soil erosion control, sediment wattle: 3,900 - 11,000 LNFT • Cement or fly ash treated pulverization/aggregate stabilization: 37,000 - 116,000 SQYD • Superpave asphalt pavement : 6,500 - 20,600 TON • Colored concrete curb: 6,570 - 19,980 LNFT • Concrete sidewalk: 260 - 700 SQYD • Embankment construction: 3,570 CUYD • Placement of biaxial geogrid: 10,210 SQYD It is anticipated that this project will be advertised in late-October 2013. Notice to proceed for construction will be on April 1, 2014. Estimated cost for the schedule(s) and option range from $4 to $10 million.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/DOT/FHWA/68/DTFH68-13-B-00017/listing.html)
 
Place of Performance
Address: Theodore Roosevelt National Park, Dickinson, North Dakota, 58601, United States
Zip Code: 58601
 
Record
SN03215626-W 20131013/131011233854-48519964a50efdad7f2a2a436786ce9a (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.