Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY - FEDBIZOPPS ISSUE OF OCTOBER 18, 2013 FBO #4346
SOLICITATION NOTICE

Y -- NV FTNP/NPS LAKE 1(10), Las Vegas Wash Drop Structure No. 4

Notice Date
10/16/2013
 
Notice Type
Presolicitation
 
NAICS
237310 — Highway, Street, and Bridge Construction
 
Contracting Office
Department of Transportation, Federal Highway Administration (FHWA), Central Federal Lands Highway Division, 12300 West Dakota Avenue, Lakewood, Colorado, 80228
 
ZIP Code
80228
 
Solicitation Number
DTFH68-13-B-00019
 
Archive Date
12/31/2013
 
Point of Contact
Aaron L. Sanford, Phone: 7209633090, Jeremiah B. Rogers, Phone: 7209633090
 
E-Mail Address
aaron.sanford@dot.gov, jeremiah.rogers@dot.gov
(aaron.sanford@dot.gov, jeremiah.rogers@dot.gov)
 
Small Business Set-Aside
N/A
 
Description
Project Details: The project will construct a drop structure in the Las Vegas Wash channel downstream of the Lake Las Vegas Dam. This structure is the fourth of a proposed eight drop structures to control channel erosion of the Las Vegas Wash Channel due to the lowering Lake Mead Water levels. The scope of this project is limited to building a new drop structure in the channel with an active stream. There is no mechanism to stop the channel flow so a diversion plan must be prepared and submitted showing experience with this type of very specific work elements. Sequenced construction in the channel will be necessary while maintaining channel flows at all times. The drop structure is comprised of two sheet pile walls with a concrete cap and Class 6 Riprap placed before in and at the toe of the structure. The access to the site is limited to a dirt access road that needs improvement and continuous maintenance. SIGNIFICANT QUANTITIES: o Schedule A - Major Items o Earthwork Geotextile (5,500 square yards) o Sheet Piles In Place (1,800 square yards) o Reinforcing Steel (6,500 lbs) o Structural Concrete (215 cubic yards) IMPORTANT REQUIREMENT: Contractor is responsible for water diversion design and shall submit a water diversion plan for approval by the COE and Lake Mead. The daily base flow is expected to be approximately 350 cfs and there should be protective measures to handle flows from storm events. An average storm event can produce a storm spike from 1,000 to 1,500 cfs while larger events can produce floods exceeding 10,000 cfs. It is anticipated that this project will be advertised in late October, 2013. Construction is anticipated to occur from December, 2013 to July, 2014. The contracting range for this project is between $2 million and $5 million.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/DOT/FHWA/68/DTFH68-13-B-00019/listing.html)
 
Place of Performance
Address: Lake Mead NRA, Las Vegas, Nevada, 89165, United States
Zip Code: 89165
 
Record
SN03216616-W 20131018/131016234135-e52ef40d8837beacf5969e6f21b9510e (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.