Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY - FEDBIZOPPS ISSUE OF NOVEMBER 08, 2013 FBO #4367
DOCUMENT

C -- 637-315 Expand/Renovate Operating Rooms - Design - Attachment

Notice Date
11/6/2013
 
Notice Type
Attachment
 
NAICS
541330 — Engineering Services
 
Contracting Office
Department of Veterans Affairs;VISN 6 Centralized Acquisition Service;1100 Tunnel Road;Asheville NC 28805
 
ZIP Code
28805
 
Solicitation Number
VA24614R0009
 
Response Due
12/11/2013
 
Archive Date
3/11/2014
 
Point of Contact
Denise OBrien
 
Small Business Set-Aside
Service-Disabled Veteran-Owned Small Business
 
Description
The Department of Veterans Affairs Medical Center (VAMC), 1100 Tunnel Rd, Asheville, NC 28805 is seeking a qualified Service-Disabled Veteran-Owned Small business (SDVOSB) A/E firm to provide Schematics, Design Development, Construction Documents, Technical Specifications, Construction Period Services, Site Visits, Cost Estimates, As-Built Documentation, and all other related information for project no. 637-315, Expand/Renovate Operating Rooms. This procurement is restricted to Service-Disabled Veteran-Owned Small Business (SDVOSB) firms. This requirement is being procured in accordance with the Brooks Act as implemented in FAR Subpart 36.6. Applicable NAICS code is 541330 and small business size standard of $14 Million. This is a 100% Service-Disabled Veteran-Owned Small Business Set Aside. Potential contractors must be registered in SAM (www.sam.gov) and visible/certified in Vet Biz (www.vetbiz.gov) at time of submission of their qualifications in order to be considered for an award. As a prospective offeror or bidder for this Service-Disabled Veteran-Owned Small Business (SDVOSB) set aside, you are verifying your company meets the status requirements of a SDVOSB concern as established by 38 CFR Part 74. NOTE - Offerors are referred to VAAR Clause 852.219-10(c)(1): "Services (except construction) at least 50 percent of personnel for contract performance will be spent for employees of the concern or employees of other eligible service-disabled veteran-owned small business concerns". In order to assure compliance with this clause, all firms submitting a SF 330 for this Sources Sought Notice are required to indicate what percentage of the cost of contract performance will be expended by the concerns employees and in which discipline(s) and percentage of cost of contract performance to be expended (and in what disciplines) by any other subcontracted or otherwise used small or large business entity(s). Any subcontracted or otherwise business entity(s) used must be identified by name, office location and size/type of business (i.e. SDVOSB, VOSB, 8(a), large, etc). Description of work to be performed includes design work for the preparation of 100% complete working drawings, specifications, and cost estimates as required to expand/renovate the operating rooms on the VA Medical Center campus, Asheville, NC. The expanded/renovated operating rooms shall be designed with coordination with all VA staff input for various program areas that have impact in this area of the hospital, physically and functionally. VA space criteria shall be used as a guide with standards implemented into the plans. Work to also include all associated work as required, integrating the renovated space and new structure completely into the building and campus. The objective of this project is a design to expand and renovate the Operating Rooms in Building 47 at the Charles George VA Medical Center in Asheville, NC. Existing space is 5000 gsf on the 2nd floor of Building 47. Project will expand on to the roof including the requisite structural modifications. Project constructs 8,135 GSF of new space onto the 1st floor roof of Bldg 47, outside the existing Operating Room suite. The project constructs a total of 7 Operating Rooms; 5 OR's to replace existing 5 OR's to bring them up to current standards and 2 additional Operating Rooms (to fill space gap for Operating Rooms). The project also renovates approximately 5,000 GSF of the older Operating Room suite where the existing 5 Operating Rooms exist. Work includes the disciplines of architectural, electrical, mechanical, and structural, as well as some asbestos removal. The existing space in Bldg 47 where the old OR's are located (approx. 5000 GSF) will be upgraded to meet the seismic requirements for this area and reduce the seismic deficiencies of this part of the building. Interior work will include demolition of walls and doors of existing space, install new sheetrock/metal stud wall, wood doors/metal frames/hardware, new flooring, new ceilings, electrical work to include power, LED lighting, data, new mechanical work includes, air handling systems, ductwork, and controls. Design completion timeframe is estimated to be 290 days after receipt of the Notice to proceed. In accordance with FAR 36.204 the estimated magnitude of the resulting construction project is between $5,000.000.00 and $10,000,000.00. Qualifications (SF330) submitted by each firm will be reviewed and evaluated based on the following criteria (listed in no particular order of importance) as required by Federal Acquisition Regulation (FAR) Part 36.602-1 and VA Acquisition Regulation (VAAR) Part 836-602-1: (1) Professional qualifications necessary for satisfactory performance of required services; (2) Recent Specialized Experience and Technical Competence in the type of work required, within the last 5 years, specifically in the design of operating rooms, adding on to existing multi-story structures, phased healthcare projects, infection control systems, and fire protection systems, but also more generally including and also with in the last 5 years, experience in electrical, plumbing & mechanical design, experience in healthcare/medical facility design, energy conservation, pollution prevention/waste reduction, LEED and the use of recovered materials, ADA, NFPA 101 Life Safety, Interior Design, and Value Engineering & Life Cycle Cost Analysis; (3) Capacity to accomplish the work in the required time of 290 days; (4) Past performance of the firm on contracts relevant in scope to the advertised project that were accomplished with Government agencies and private industry in terms of cost control, quality of work, and compliance with performance schedules; (5) Location in the general geographical area of Asheville, NC and knowledge of the locality of the Asheville VAMC; (6) Implementation of the Design Quality Control Program, to include specific quality control and coordination methods used during design; (7) Program Management Process/Plan; (8) Record of significant claims against the firm because of improper or incomplete architectural and engineering services; (9) Specific experience and qualifications of personnel proposed for assignment to the project and their record of working together as a team; SUBMISSION REQUIREMENTS: Qualified SDVOSB firms are required to submit two (2) hard copies of the SF 330s (which can be downloaded from www.gsa.gov/forms) and Supplemental Information (see Attachment 1), and one (1) CD which contains digital copies of the SF 330s and Supplemental Information. All packages shall be submitted no later than 3:30 PM, EST on December 11, 2013. All submittals must be sent to the attention of Denise O'Brien, VA Medical Center, 1100 Tunnel Ave, Bldg 15 Room 338, Asheville, NC 28805. The submission must include an insert detailing the following information: (1) Dun & Bradstreet Number; (2) Tax ID Number; (3) The e-mail address and phone number of the Primary Point of Contact and; (4) A copy of the firms VetBiz Registry. The Contracting Officer is not responsible for not receiving submissions due to the offeror misaddressing the package or illegibility of the information. NOTE: Any request for assistance with submission or other procedural matters shall be submitted via email only (denise.obrien2@va.gov), telephone inquires will not be honored. ? ATTACHMENT 1 SF 330 Supplemental Information Evaluation Criteria for AE Services Contract In addition to the submission of the SF 330, firms are required to provide the following supplemental information as part of total submission package. Submitting firms are to provide five (5) bound hard copies with tabs and one (1) CD which contain the SF 330s and the following documents. 1. Professional qualifications necessary for satisfactory performance of required services. a) Submission requirements: o Submit personal resumes that best demonstrate the firm's professional qualifications, including specific licenses and registrations relevant to the project requirements. o Complete and submit a summary disclosure for each discipline, principal, project manager, and other support personnel, for up to 10 employees covering disciplines offered, that will handle work for this project. Each resume package may not be longer than two (2) pages in length. b) Basis of Evaluation: o Evaluation of professional qualifications will include but is not limited to the subjective assessment of the firm's individual resumes as required in the sources sought. o Firms unable to demonstrate required qualifications necessary to perform designs may be considered non-responsive. Failure to provide requested data may negatively impact a firm's rating. o Higher ratings for this criterion may be given when the firm's specific personnel demonstrate excellent or very good credentials, above and beyond those usually expected. 2. Recent Specialized Experience and Technical Competence in the type of work required, within the last 5 years, specifically in the design of operating rooms, adding on to existing multi-story structures, phased healthcare projects, infection control systems, and fire protection systems, but also more generally including and also with in the last 5 years, experience in electrical, plumbing & mechanical design, experience in healthcare/medical facility design, energy conservation, pollution prevention/waste reduction, LEED and the use of recovered materials, ADA, NFPA 101 Life Safety, Interior Design, and Value Engineering & Life Cycle Cost Analysis. Specialized experience pertains to the types and volume of work previously or currently being performed by a firm that is comparable to the types of work covered by this requirement. a) Submission requirements: o Submit up to three (3) relevant projects, accomplished within the past five (5) years that best demonstrate your relevant experience to the sources sought requirements. Firm is at risk of receiving a lower rating if fewer than three (3) relevant projects are submitted. o Complete and submit a data summary sheet for each project. Each project data package may not be longer than two (2) pages in length and may include verbiage, graphics and photos. o Projects may include Federal, State, or local Government, as well as private industry projects. Firms are responsible for providing project description and applicable experience in sufficient detail to permit evaluation of project relevancy. b) Basis of Evaluation: o Evaluation of specialized experience will include but is not limited to the subjective assessment of the firm's resume of the type of work required in the sources sought. o Firms unable to demonstrate proven competence to perform this type of project may be considered non-responsive. Failure to provide requested data may negatively impact a firm's rating. o Higher ratings for this may be given when a proposal demonstrates project examples of excellent or very good examples of projects relevant to the sources sought. 3. Capacity to accomplish the work in the required time of 290 days. Identify the firm's past and present workload, and convey the understanding of being able to handle all work concurrently and within prescribed deadlines/constraints. a) Submission Requirements o Provide a narrative, (maximum of one 8 ½" x 11" page) that discusses the firm's approach to accomplishing multiple projects with emphasis on meeting prescribed deadlines. b) Basis of Evaluation: o Evaluation of this factor will be a subjective assessment of the firm's ability to clearly demonstrate an understanding of project goals and requirements set for the completion of this project and any additional work within prescribed deadlines. 4. Past performance of the firm on contracts relevant in scope to the advertised project that were accomplished with Government agencies and private industry in terms of cost control, quality of work, and compliance with performance schedules. Past performance relates to how well a firm has performed on substantially completed projects, within the past five years. a) Definitions: o Past performance is a measure of the degree to which a firm satisfied its customers in the past and complied with applicable laws and regulations. o Government agencies are defined as local, state, and federal entities. Higher ratings may be given for work performed on VA Medical Center campuses. o Private industry is defined as non-governmental clients. o The term "substantially complete" shall mean a fully designed project with construction of the facility/project more than 80% complete. b) The sources sought will require the following: o Firms shall have customers complete Past Performance Questionnaires (format to be left up to the firm submitting the SF 330) and submit directly to the Government. o Past Performance Questionnaires shall include specifics for each project submitted, but not be limited to, the following information: oProject description, Contract amount, Dates, and Client information; oProviding a dialogue and a resulting rating for the areas of Quality, Professionalism, Cooperativeness, Problems, Adherence to Schedule, Estimating Effectiveness and Cost control, and Customer satisfaction, and oAnswer the question - "Would you award this firm another contract?" o Firms shall have previous clients submit design and construction projects Past Performance Questionnaires that are the same as the projects included in its proposal for Relevant Experience. Ensure correct phone numbers and email addresses are provided for the client point of contact. Failure to provide requested data or to provide an accessible point of contact may negatively impact a firm's rating. NOTE: Past Performance Questionnaires that were completed for previous submissions can be re-used so long as they reference the projects that have been submitted in the firms' proposal for Relevant Experience. o Completed Past Performance Questionnaires are to be emailed or faxed directly to the Government Contracting Officer. In order for the client evaluation to be considered, the Past Performance Questionnaires must be received no later than the due date/time of the SF 330 packages. o The design firm shall have a minimum of three (3) past performance questionnaires submitted by their clients. o Firm to submit Past Performance Questionnaire to clients that: oAre knowledgeable of the firm's past performance. oAre willing to be interviewed by the Government using the past performance questionnaire. o Firms are encouraged to describe problems encountered on projects submitted for past performance and describe the corrective action taken to resolve the issue(s). c) Submission requirements: o Submit up to three (3) relevant projects design complete or substantially construction complete within the past five (5) years and best demonstrates your relevant experience to the sources sought requirements. Firm is at risk of receiving a lower rating if fewer than three (3) relevant projects are submitted. o Questionnaires. Firm is at risk of receiving a lower rating if fewer than three (3) Past Performance Questionnaires are received. d) Basis of Evaluation: o Failure to provide requested data or to provide an accessible point of contact (POC) may negatively impact a firm's rating. o The evaluation of past performance will include but is not limited to the assessment of the firm's commitment to customer satisfaction, timely delivery of quality work, the firm's record of conforming to specifications, successful implementation of quality control procedures; adherence to schedules; and history of reasonable and cooperative behavior. o Firms unable to demonstrate proven competence to perform projects similar to the requirements of this sources sought may be considered ineligible for award. o Higher ratings for this may be given when a proposal demonstrates excellent or very good ratings for past performance and customer satisfaction on projects relevant to the sources sought. o Evaluating past performance may include information provided by the firm, inquiries with previous customers, Government databases (Past Performance Information Retrieval System (PPIRS), Architect-Engineer Contract Administration Support System (ACASS)), and any other publicly available sources. o While the Government may elect to consider data obtained from other sources, the burden of providing detailed, current, accurate and complete past performance, experience, and safety information rests with the firm. 5. Location in the general geographical area of Asheville, NC and knowledge of the locality of the Asheville VAMC. a) Definitions: o Knowledge of the locality is defined as familiarity of applicable codes and regulations in place for the project. b) Submission requirements: o Provide a narrative, (maximum of one 8 ½" x 11" page) that discusses the firm's location. c) Basis of Evaluation: o Firms that cannot be on site at the VA Medical Center in Asheville, NC within a two hour response time will be given a lower rating than those firms that can. o Firms that can meet the two hour response time from Asheville, NC will be given the minimum acceptable rating. o Firms that can be on site at the VA Medical Center in Asheville, NC within 90 minutes will be given a higher rating. o A subjective determination of the firm's statement of knowledge of the locality and how it was obtained relative to the requirements of this solicitation. 6. Implementation of the Design Quality Control Program, to include specific quality control and coordination methods used during design. Identify the roles and responsibilities of the major personnel of the firm and depict the understanding and implementation of Quality Control procedures for this project. a) Submission Requirements: o Provide a narrative, (maximum of two 8 ½" x 11" pages) that discusses the firm's approach to this project with emphasis on the envisioned role of the design team with regard to Quality Control. Also provide a customer reference with address and telephone number for all projects listed as related experience in item 2, above. b) Basis of Evaluation: o A subjective determination of the firm's statement of knowledge of Quality Control and how it will implement Quality Control procedures relative to the requirements of this solicitation. o Higher ratings may be given for this factor when information provided exceeds the minimum requirements. 7. Program Management Process/Plan. Identify the roles and responsibilities of the major personnel of the firm and depict the lines of communications envisioned for the design tasks between the firm and with the Government. a) Submission Requirements: o Provide an organizational chart (no larger than 11" x 17") depicting the relationships between the firm and all partners and/or subcontractors/consultants to be associated with this solicitation and identifying each of the firms key positions/personnel and their role in managing work for this project. o Provide a narrative, (maximum of one 8 ½" x 11" page) that discusses the firm's Program management approach to this project. b) Basis of Evaluation: o Evaluation of this factor will be a subjective assessment of the firm's ability to clearly demonstrate an understanding of the projects goals and requirements and set forth a realistic approach for the design of the project. o Higher ratings may be given for this factor when information provided exceeds the minimum requirements. 8. Record of significant claims against the firm because of improper or incomplete architectural and engineering services. a) Submission Requirements: o Provide a narrative (maximum of one 8 ½" x 11" page) that addresses any claims, disputes, lines or judgments against your firm for instances where there have been design errors, deficiencies and/or omissions AND the steps your firm took to resolve the issues and the ultimate outcome. o Provide a statement if item 8 above is not applicable to your firm. b) Basis of Evaluation: o Evaluation of this factor will be an objective assessment of the firm's ability to provide clear, concise, accurate design drawings and specifications free from design errors, deficiencies and/or omissions AND a subjective assessment of how well the firm managed situations when these issues were encountered. o Higher ratings will be given to firms that have not had any of the issues mentioned in item 8 above; however, firms with no performance history will be scored lower than those firms with significant performance history and none of the issues in item 8. o A lower rating will be given to firms that have experienced issues that resulted from design errors, deficiencies, and/or omissions, but resolved the matter to the satisfaction of the Government and/or customer. o Firms that were unable to amiably resolve issues that arose from design errors, deficiencies and/or omissions will not be considered eligible for competition. 9. Specific experience and qualifications of personnel proposed for assignment to the project and their record of working together as a team. a) Submission Requirements: o Provide a narrative (maximum of one 8 ½" x 11" page) that addresses any partnering, teaming, or subcontracting relationships your firm has and how long members within your firm have worked with one another. b) Basis of Evaluation: o Evaluation of this factor will be a subjective assessment of the firms relationships and how well the firm works as a team within their organization and with other partners, teams, and subcontractors. o Higher ratings will be given to firms that clearly demonstrate organizational health and cooperation with other teams, partners, and Government and industry personnel (customers), and that can show the personnel assigned to this project to have successfully performed together as a team on past projects. o A lower rating will be given to firms that cannot demonstrate organizational health and cooperation with other teams, partners, and Government and industry personnel (customers), and that are unable to show the personnel assigned to this project as successfully performing together as a team on past projects. FAILURE TO CLEARLY ADDRESS ALL LISTED EVALUATION CRITERIA AND INFORMATION REQUIRED BY THE SUBMISSION REQUIREMENTS ABOVE MAY RESULT IN REJECTION OF THE SUBMISSION. After the evaluation of SF330 submissions in accordance with the evaluation criteria, at least three of the most highly qualified firms will be chosen for interviews to present their approach to the design to arrive at selection of the number one firm for negotiations. The contract is anticipated to be awarded on or before May 2014. The Government will not pay nor reimburse any costs associated with responding to this request. The Government is under no obligation to award a contract as a result of this announcement. THIS ANNOUNCEMENT IS NOT A REQUEST FOR PROPOSAL; NO SOLICITATION PACKAGE WILL BE ISSUED UNTIL AFTER AN EVALUATION HAS BEEN MADE ON THE PROVIDED SF-330.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/VA/AsVAMC/VAMCCO80220/VA24614R0009/listing.html)
 
Document(s)
Attachment
 
File Name: VA246-14-R-0009 VA246-14-R-0009.docx (https://www.vendorportal.ecms.va.gov/FBODocumentServer/DocumentServer.aspx?DocumentId=1077931&FileName=VA246-14-R-0009-000.docx)
Link: https://www.vendorportal.ecms.va.gov/FBODocumentServer/DocumentServer.aspx?DocumentId=1077931&FileName=VA246-14-R-0009-000.docx

 
Note: If links are broken, refer to Point of Contact above or contact the FBO Help Desk at 877-472-3779.
 
Place of Performance
Address: VA Medical Center;1100 Tunnel Road;Asheville, NC
Zip Code: 28805
 
Record
SN03229831-W 20131108/131106234423-684a38b8533cf5f778e1e1c162f6dc57 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.