SOLICITATION NOTICE
Y -- REHABILITATION OF THE LOWER RIO GRANDE LEVEE FROM SANTA MARIA TO LOS INDIOS IN CAMERON COUNTY, TEXAS
- Notice Date
- 11/15/2013
- Notice Type
- Presolicitation
- NAICS
- 237990
— Other Heavy and Civil Engineering Construction
- Contracting Office
- International Boundary and Water Commission, Information Management Division, Acquisition Division, 4171 North Mesa, Suite C-100, El Paso, Texas, 79902, United States
- ZIP Code
- 79902
- Solicitation Number
- IBM14B0003
- Point of Contact
- Ruben Pino, Phone: 9158324126, Frank Delgado, Phone: 9158324119
- E-Mail Address
-
ruben.pino@ibwc.gov, frank.delgado@ibwc.gov
(ruben.pino@ibwc.gov, frank.delgado@ibwc.gov)
- Small Business Set-Aside
- Total Small Business
- Description
- Rehabilitation of the Lower Rio Grande Levee from Santa Maria to Los Indios in Cameron County, Texas General Description of the Work - The work for this project generally consists of rehabilitation of approximately 12.0 miles of river levee in southern Texas in order to meet the Federal Emergency Management Agency's (FEMA) Levee Certification Requirements of National Flood Insurance Program (NFIP) regulations (44 CFR 65.10). This stretch of river levee is situated entirely in Cameron County, Texas and extends along the Rio Grande from the Hidalgo/Cameron County line near Santa Maria, Texas to Los Indios, Texas. Major Construction Tasks -(1) Preparation of right of way (clearing and grubbing) (2) Improvement of existing top of levee (3) Construction of Flex Base (4) Construction of ramps (5) Construction of toe drain (6) Re-seeding and establishment of vegetation for erosion control on the side slopes of the levee (6) Replacement of sluice gate assemblies inside existing and new gatewell structures, and (7) Cleaning and removing debris from openings of culverts, and inlet and outlet structures of the existing gatewell systems. The magnitude of this project is between $10 million and $15 million. Performance Period - All work shall be completed within four hundred eighty-five (485) calendar days. All flood control levee and structure work, excluding maintenance of seeding, shall be completed within, three hundred sixty-five (365) calendar days. All maintenance of seeding shall be completed within one-hundred twenty (120) calendar days of completion of all other levee work.
- Web Link
-
FBO.gov Permalink
(https://www.fbo.gov/spg/IBWC/IMD/ElPasoTX/IBM14B0003/listing.html)
- Place of Performance
- Address: REHABILITATION OF THE LOWER RIO GRANDE LEVEE FROM SANTA MARIA TO LOS INDIOS IN CAMERON COUNTY, TEXAS, United States
- Record
- SN03234660-W 20131117/131115233853-24893ac22f8cc6a9d8e03e3d72569440 (fbodaily.com)
- Source
-
FedBizOpps Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's FBO Daily Index Page |