SOLICITATION NOTICE
N -- Controls Upgrades & Boiler Replacement in Buildings 310 & 311 at the U.S. Army, Ft. Leonard Wood Hospital, MO - Justification and Approval (J&A)
- Notice Date
- 11/15/2013
- Notice Type
- Justification and Approval (J&A)
- NAICS
- 541512
— Computer Systems Design Services
- Contracting Office
- USACE HNC, Huntsville, P. O. Box 1600, Huntsville, AL 35807-4301
- ZIP Code
- 35807-4301
- Solicitation Number
- W912DY-11-D-0003-0048
- Archive Date
- 12/15/2013
- Point of Contact
- Nicholas A. Aprea, 256-865-1614
- E-Mail Address
-
USACE HNC, Huntsville
(nicholas.a.aprea@usace.army.mil)
- Small Business Set-Aside
- N/A
- Award Number
- W912DY-11-D-0003-0048
- Award Date
- 9/30/2012
- Description
- Aproved EFO for 11-D-0003-0048_30Sep12 The Contractor shall replace the existing obsolete, and inoperable boiler and boiler/heating system, resizing of gas and steam lines, and a NEC-approved (Network Enterprise Center) network system for connection to the DoD (Department of Defense) facility network. The new DDC system(s) shall be configured to remotely communicate with existing proprietary JCI Metasys equipment (ADX Servers), via internal networks. The Contractor shall add or replace controls and incidental electrical and structural elements as needed for a complete and useable system. The Contractor shall survey the hardware necessary for this project and validate the operational effectiveness of any equipment to be reused in conjunction with the addition of new equipment. All surveys will be coordinated with site maintenance personnel as specified in Table 6.3. All work shall be done in accordance with Army construction standards, the National Electrical Code and American Society of Heating, Refrigeration and Air Conditioning Engineers (ASHRAE) standards. All Occupational, Safety and Health Agency (OSHA) safety standards must be followed during all phases of work. The new and repaired equipment shall be consistent with the listing as defined in Attachment 4 and per the specifications listed in Attachment 1. If any equipment is removed and/or demolished during the execution of this task order, unless otherwise stated in writing,the Contractor shall replace any removed quote mark systems quote mark with like/similar functionality.
- Web Link
-
FBO.gov Permalink
(https://www.fbo.gov/spg/USA/COE/DACA87/W912DY-11-D-0003-0048/listing.html)
- Record
- SN03234720-W 20131117/131115233927-35353f41375c193123346bc155780a0a (fbodaily.com)
- Source
-
FedBizOpps Link to This Notice
(may not be valid after Archive Date)