Y -- wall and sidewalk - sow

Notice Date
12/5/2013
 
Notice Type
Combined Synopsis/Solicitation
 
NAICS
238110 — Poured Concrete Foundation and Structure Contractors
 
Contracting Office
Department of Homeland Security, United States Coast Guard (USCG), Detachment Cleveland, 1240 East 9th Street, Cleveland, Ohio, 44199-2060, United States
 
ZIP Code
44199-2060
 
Solicitation Number
2114304cb1106
 
Archive Date
12/21/2013
 
Point of Contact
SCOTT S. HUTTON, Phone: 2169026339
 
E-Mail Address
SCOTT.S.HUTTON@USCG.MIL
(SCOTT.S.HUTTON@USCG.MIL)
 
Small Business Set-Aside
N/A
 
Description
sow General Decision Number: NY130056 11/08/2013 NY56 Superseded General Decision Number: NY20120056 State: New York Construction Type: Building County: Erie County in New York. BUILDING CONSTRUCTION PROJECTS (does not include residential construction consisting of single family homes and apartments up to and including 4 stories) Modification Number Publication Date 0 01/04/2013 1 01/18/2013 2 01/25/2013 3 02/01/2013 4 02/22/2013 5 04/05/2013 6 05/03/2013 7 05/10/2013 8 05/17/2013 9 05/31/2013 10 07/05/2013 11 08/02/2013 12 08/09/2013 13 08/23/2013 14 09/20/2013 15 10/04/2013 16 11/01/2013 17 11/08/2013 BOIL0007-001 01/01/2013 Rates Fringes BOILERMAKER......................$ 29.97 25.93 ---------------------------------------------------------------- BRNY0045-004 07/01/2012 Rates Fringes BRICKLAYER.......................$ 30.48 17.94 CEMENT MASON.....................$ 30.48 17.94 MARBLE SETTER....................$ 30.23 17.69 TERRAZZO FINISHER................$ 27.52 11.29 TILE FINISHER....................$ 27.52 11.29 Tilesetter & Terrazzo Worker.....$ 30.23 17.69 ---------------------------------------------------------------- CARP0276-014 07/01/2013 Rates Fringes CARPENTER........................$ 29.70 25.03 ---------------------------------------------------------------- ELEC0041-003 04/01/2013 Rates Fringes CABLE SPLICER....................$ 35.35 3%+20.19 ELECTRICIAN......................$ 32.14 3%+20.219 ---------------------------------------------------------------- ELEC0041-004 05/27/2013 Rates Fringes Communications System CABLER......................$ 9.00 10.66+a INSTALLER...................$ 15.90 15.17+a MASTER TECHNICIAN...........$ 24.31 15.42+a SOUND WIREMAN...............$ 19.65 15.28+a Work covers low voltage construction, installation, maintenance, and removal of teledata facilities (voice, data and video) including outside plant, telephone and data inside wire, interconnect, terminal equipment, central offices, PABX fiber optic cable and equipment, railroad communications, micro waves, V-Sat, bypass, CATV, WAN (wide area networks); LAN (local area networks) and ISDN (integrated systems digital network). Also, installation of sound systems, nurses call systems, intercom systems, staff registry/locating/signaling systems, antenna systems and associated devices; installation of security systems and apparatus, and cabling from VDT's to computers. This work does not apply to new construction, or to the installation of raceway systems and boxes for the above work. ---------------------------------------------------------------- ELEC1249-003 05/06/2013 Rates Fringes ELECTRICIAN (LINE CONSTRUCTION: LIGHTING AND TRAFFIC SIGNAL Including any and all Fiber Optic Cable necessary for Traffic Signal Systems, Traffic Monitoring systems and Road Weather information systems) Flagman.....................$ 23.51 7.5%+19.00+a Groundman (Truck Driver)....$ 31.35 7.5%+19.00+a Groundman Truck Driver (tractor trailer unit)......$ 33.31 7.5%+19.00+a Lineman & Technician........$ 39.19 7.5%+19.00+a Mechanic....................$ 31.35 7.5%+19.00+a FOOTNOTE: a. New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, Christmas Day, plus President's Day, Good Friday, Decoration Day, Election Day for the President of the United States and Election Day for the Governor of the State of New York, provided the employee works the day before or the day after the holiday. ---------------------------------------------------------------- ELEC1249-004 05/06/2013 Rates Fringes ELECTRICIAN (Line Construction) Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including any and all fiber optic ground wire, fiber optic shield wire or any other like product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities : Flagman....................$ 26.47 7.5%+19.00+a Groundman digging machine operator...................$ 39.71 7.5%+19.00+a Groundman truck driver (tractor trailer unit).....$ 37.50 7.5%+19.00+a Groundman Truck driver.....$ 35.30 7.5%+19.00+a Lineman and Technician.....$ 44.12 7.5%+19.00+a Mechanic...................$ 35.30 7.5%+19.00+a Substation: Cable Splicer..............$ 48.53 7.5%+19.00+a Flagman....................$ 26.47 7.5%+19.00+a Ground man truck driver....$ 35.30 7.5%+19.00+a Groundman digging machine operator...................$ 39.71 7.5%+19.00+a Groundman truck driver (tractor trailer unit).....$ 37.50 7.5%+19.00+a Lineman & Technician.......$ 44.12 7.5%+19.00+a Mechanic...................$ 35.30 7.5%+19.00+a Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable installations (including any and all fiber optic ground product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities), pipetype cable installation and maintenance jobs or projects, and maintenance bonding of rails; Pipetype cable installation Cable Splicer..............$ 49.94 7.5%+19.00+a Flagman....................$ 27.24 7.5%+19.00+a Groundman Digging Machine Operator...................$ 40.86 7.5%+19.00+a Groundman Truck Driver (tractor-trailer unit).....$ 38.59 7.5%+19.00+a Groundman Truck Driver.....$ 36.32 7.5%+19.00+a Lineman & Technician.......$ 45.40 7.5%+19.00+a Mechanic...................$ 36.32 7.5%+19.00+a FOOTNOTE: a. PAID HOLIDAYS: New Year's Day, Presidents' Day, Memorial Day, Good Friday, Independence Day, Labor Day, Thanksgiving Day, Christmas Day, and Election Day for the President of the United States and Election Day for the Governor of New York State, provided the employee works two days before or two days after the holiday. ---------------------------------------------------------------- ELEC1249-008 01/01/2013 Rates Fringes ELECTRICIAN (Line Construction) TELEPHONE, CATV FIBEROPTICS CABLE AND EQUIPMENT Cable splicer..............$ 28.55 3%+4.43 Groundman..................$ 12.73 3%+4.43 Installer Repairman- Teledata Lineman/Technician- Equipment Operator.........$ 27.10 3%+4.43 Tree Trimmer................$ 22.08 8.30+3%+a a. New Year's Day, President's Day, Good Friday, Decoration Day, Independence Day, Labor Day, Veteran's Day, Thanksgiving Day, Day after Thanksgiving, Christmas Day. ---------------------------------------------------------------- ELEV0014-001 01/01/2013 Rates Fringes ELEVATOR MECHANIC................$ 43.49 25.185+a+b FOOTNOTE: a. 8 Paid Holidays: New Years Day, Memorial Day, Independence Day, Labor Day, Veteran's Day, Thanksgiving Day, the Friday after Thanksgiving Day, Christmas Day. b. 6% Men under 5 years based on regular hourly rate for all hours worked 8% Men over 5 years based on regular houly rate for all hours worked ---------------------------------------------------------------- ENGI0017-001 07/01/2013 BUILDING CONSTRUCTION Rates Fringes Power equipment operators: GROUP 1.....................$ 32.31 27.90+a GROUP 2.....................$ 27.81 27.90+a GROUP 3.....................$ 33.06 27.90+a GROUP 4.....................$ 33.31 27.90+a GROUP 5.....................$ 33.81 27.90+a GROUP 6.....................$ 33.38 27.90+a NOTE: HAZARDOUS WASTE PREMIUM $2.50 TUNNEL WORK $1.00 FOOTNOTES: a. PAID HOLIDAYS: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, Christmas Day, provided the employee has worked the day before and the day after the holiday. POWER EQUIPMENT OPERATORS CLASSIFICATIONS GROUP 1: Air hoist, all boom type equipment (100 ft. or less), all pan and carry-alls, archer hoist, asphalt roller asphalt spreader or paver, automatic fine grade machine (CMI and similar type), archer hoist, backhoe and pull hoe (tractor mounted and rubber mounted), back filling machine, belt place (CMI and similar), bending machine (pipe), bituminous spreader and mixer, black top plant (automated), black top plant (non-automated), blast or rotary drill (truck or track mounted), blower for burning brush, boiler (when used for power), boom trucks, boring machine, bulldozer, cableway cage hoist, caisson auger, central mix plant (and all concrete batching plants), cherry picker (over 5 tons), cherry picker (under 5 tons), chipping machine and chip spreader, concrete curb and gutter machines, concrete curing machine, concrete mixer (over 1/2 cu. yd.) concrete pavement spreaders and finishers, concrete paver, concrete pump, concrete saw (self-propelled), conveyor, core drill, crane, crusher, derrick operator, dragline, dredge, drill rig (tractor mounted), dual drum paver, electric pump used in conjunction with well point systems, elevating grader self- propelled or towed), elevator excavator (all purpose, hydraulcally operated) farm tractor with accessories, fine grade machine, forklift, front end loader, generator (10 outlets or more), gradall, grader, grout or gunite machine, head tower, hoist-one drum, hoisting engine, hydraulic boom, hydraulic hammer, (self propelled), hydraulic pipe jack machine (or similar type machine), hydraulic system pumps, hydro crane, hydro hammer (or similar type), industrial tractor, jersey spreader, kolman plant loader (and similar type loaders), locomotive, lubrication truck, maintenance engineer, maintenance lubrication unit or truck, mine hoist, mixr for stabilized base (self-propelled), monorail, motorized hydraulic pin puller, motorized hydraulic seeder mucking machine, mulching machine, multiple drum hoist (more than 1 drum in use), overhead crane, peine crane (or similar type), pile driver, plant engineer, pneumatic mixer, post hole digger, power boom, pump crete, push or snatch cat, quarry master or equivalent road widener, rock bit sharpener (all types), roller (all), rolling machin (pipe), rotomill, scoopmobile, shovel, side boom, skimmer, slip form paver (CMI and similar type, first and second operator), snorkel, strato-tower, stump chipping machine, tire truck and repair, towed roller, tractor drawn belt type grader/loader, tractor shovel, tractor with towed accessories, tractors (when using winch power), tractors, trencher, truck crane, tunnel shovel, tube finisher (CMI and similar type), vibratory compactor, vibro tamp, well drilling machine, well point, winch, winch truck with "A" frame. GROUP 2: Aggregate bin, CMI and similar type concrete spreads, cement bin, chipping machine and chip spreader, compressors (4 or less), compressors: (any size, but subject to other provisions for compressors, dust collectors, generators, mechanical heaters, pumps, welding machines (four of any type or combination), concrete mixer (1/2 cu. yd. and under), fireman, form tamper, fuel truck, heating boiler (used for temprory heat), jeep trencher, power heaterman, power plant in excess of 10 K.W., pump (4" or over), revinius widener, stem cleaner, stump chipping machine, welding machine (1 machine over 300 amps or 2 or 3 machines regardless of amps). GROUP 3: Crane with boom over 100 feet GROUP 4: Crane with boom over 200 feet GROUP 5: Crane with boom over 300 feet GROUP 6: Master meachanic ---------------------------------------------------------------- IRON0006-015 05/01/2013 ERIE (Township of Grand Island) Rates Fringes IRONWORKER Ironworker..................$ 29.47 21.33 Sheeter.....................$ 32.37 21.33 ---------------------------------------------------------------- * LABO0210-001 07/01/2013 BUILDING Rates Fringes Laborers: GROUP 1....................$ 26.66 23.15 GROUP 2....................$ 26.86 23.15 GROUP 3....................$ 27.06 23.15 GROUP 4....................$ 27.26 23.15 GROUP 5....................$ 27.66 23.15 GROUP 6....................$ 28.66 23.15 LABORER BUILDING CLASSIFICATIONS GROUP 1: Basic, boat safety man, flagman, tool room man, nurseryman demolition worker; top man; wrecker; IBC barriers except on structurers; guard rail. Asphalt shovelers, foundation laborers over 8' in depth, hod carriers, plaster tender, plaster scaffold builder, pneumatic gas, electric operator, including all forms of busters, jackhammers, chipping guns and steel burners. GROUP 2: Mortar mixer, asphalt smoothers, pneumatic gas electric tool operator including all forms of busters, jackhammers, and chipping guns over 8' in depth. GROUP 3: Worker on any swing scaffold, blaster, plumbing laborer, wagon driller, bottom (caisson or cofferdam), laser setter, asphalt rakers, asphalt screed man. GROUP 4: Stone cutter, curb setter and flag layer. GROUP 5: Asbestos removal, deleader. GROUP 6: Hazardous waste worker. ---------------------------------------------------------------- PAIN0004-007 05/01/2013 Rates Fringes GLAZIER..........................$ 25.45 16.62 ---------------------------------------------------------------- PAIN0004-018 05/01/2012 (AREA NORTH OF WHITEHAVEN ROAD, GRAND ISLAND, NEW YORK) Rates Fringes Painters: Lead Abatement..............$ 25.43 19.51 Painters....................$ 24.68 19.51 Spraying, Paperhangers, Sand Blasting, Swinging scaffold....................$ 24.93 19.51 Tapers......................$ 25.18 19.51 ---------------------------------------------------------------- PAIN0004-024 05/01/2012 ENTIRE COUNTY, (Excluding area North of Whitehaven Road, Grand Island, New York) Rates Fringes Painters: Brush & Roll................$ 24.68 19.51 Spray, Sandblasting, Swing Scaffold or any Hanged Rigging platform, Epoxy.....$ 24.93 19.51 Taping/Drywall..............$ 25.18 19.51 ---------------------------------------------------------------- PLAS0009-001 06/01/2011 Rates Fringes PLASTERER........................$ 27.55 14.34 ---------------------------------------------------------------- PLAS0111-001 07/01/2011 Rates Fringes CEMENT FINISHER..................$ 27.00 24.27 ---------------------------------------------------------------- PLUM0022-008 05/01/2013 ERIE- All Townships in the County Rates Fringes PIPEFITTER ZONE 1......................$ 32.18 21.05 ---------------------------------------------------------------- ROOF0074-001 06/01/2011 ERIE COUNTY Rates Fringes Roofers: Composition.................$ 25.00 16.18 Slate & Tile................$ 25.15 16.18 ---------------------------------------------------------------- SHEE0071-001 05/15/2011 ERIE COUNTY: Rates Fringes Sheet metal worker...............$ 31.50 17.45 ---------------------------------------------------------------- TEAM0449-004 07/01/2012 ERIE COUNTY Rates Fringes Truck drivers:...................$ 31.24 4.85+a+b Work on a hazardous waste site then additional $2.00 per hour. FOOTNOTE: a. Pension $43.60 per day b. Paid Holidays: New Years Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, Christmas Day provided the employee has worked the working day before and after the holiday ---------------------------------------------------------------- SUNY1999-001 06/18/1999 Rates Fringes SPRINKLER FITTER.................$ 15.94 3.88 ---------------------------------------------------------------- WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental. ================================================================ Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)). ---------------------------------------------------------------- The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of "identifiers" that indicate whether the particular rate is union or non-union. Union Identifiers An identifier enclosed in dotted lines beginning with characters other than "SU" denotes that the union classification and rate have found to be prevailing for that classification. Example: PLUM0198-005 07/01/2011. The first four letters, PLUM, indicate the international union and the four-digit number, 0198, that follows indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. The date, 07/01/2011, following these characters is the effective date of the most current negotiated rate/collective bargaining agreement which would be July 1, 2011 in the above example. Union prevailing wage rates will be updated to reflect any changes in the collective bargaining agreements governing the rates. 0000/9999: weighted union wage rates will be published annually each January. Non-Union Identifiers Classifications listed under an "SU" identifier were derived from survey data by computing average rates and are not union rates; however, the data used in computing these rates may include both union and non-union data. Example: SULA2004-007 5/13/2010. SU indicates the rates are not union majority rates, LA indicates the State of Louisiana; 2004 is the year of the survey; and 007 is an internal number used in producing the wage determination. A 1993 or later date, 5/13/2010, indicates the classifications and rates under that identifier were issued as a General Wage Determination on that date. Survey wage rates will remain in effect and will not change until a new survey is conducted. ---------------------------------------------------------------- WAGE DETERMINATION APPEALS PROCESS 1.) Has there been an initial decision in the matter? This can be: * an existing published wage determination * a survey underlying a wage determination * a Wage and Hour Division letter setting forth a position on a wage determination matter * a conformance (additional classification and rate) ruling On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.) and 3.) should be followed. With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to: Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W. Washington, DC 20210 2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to: Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W. Washington, DC 20210 The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue. 3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to: Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W. Washington, DC 20210 4.) All decisions by the Administrative Review Board are final. ================================================================ END OF GENERAL DECISION
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/DHS/USCG/FCPUSCGISCC/2114304cb1106/listing.html)
 
Place of Performance
Address: sector buffalo, 1 fuhrman blvd, buffalo, New York, 142033189, United States
Zip Code: 33189
 
Record
SN03246182-W 20131207/131205234700-2ff980332482f2eab9e2599ad09cdcd3 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.