FBO DAILY - FEDBIZOPPS ISSUE OF DECEMBER 14, 2013 FBO #4403
DOCUMENT

R -- DATA ANALYSIS FOR ARTIFICIAL INTELLIGENCE - Attachment

Notice Date
12/12/2013
 
Notice Type
Attachment
 
NAICS
541618 — Other Management Consulting Services
 
Contracting Office
Department of Veterans Affairs;VAMC(688);50 Irving Street NW;Washington DC 20422
 
ZIP Code
20422
 
Solicitation Number
VA24513R0025
 
Archive Date
10/30/2013
 
Point of Contact
DELTERINE MICKEY
 
E-Mail Address
CTING
 
Small Business Set-Aside
Service-Disabled Veteran-Owned Small Business
 
Award Number
VA245-13-C-0087
 
Award Date
9/30/2013
 
Awardee
GREEN TECHNOLOGY GROUP, LLC, THE;10619 CANTERBERRY RD;FAIRFAX STATION;VA;220391921
 
Award Amount
$199,869.84
 
Description
VISN 5 VA DC STATEMENT OF WORK 1. GENERAL: This is a non-personal services requirement to provide (a) data analysis and (b) improvement facilitation. The Government shall not exercise any supervision or control over the contract service providers performing the services herein. Such contract service providers shall be accountable solely to the Contractor who, in turn is responsible to the Government. 1.1 Description of Services/Introduction: The contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to perform data analysis and improvement facilitation as defined in this Performance Work Statement except for those items specified as government furnished property and services. The contractor shall perform to the standards in this contract. 1.2 Background: This request is based on a System Redesign project funded in 2010 and titled "Enhancing the center and culture for performance excellence at the Washington, DC VAMC". Most of the tasks in this funding initiative have been completed in 2011. The remaining tasks are the focus on this contract. The Washington, DC VA Medical Center (DCVAMC) is committed to being the "Flagship of VA Healthcare." As the flagship, the medical center is a model site for innovation, continuous quality improvement, and patient safety. DCVAMC has a systematic approach to improving performance. Senior leaders regularly review a comprehensive set of performance measures. In addition to regular Baldridge assessments, a Performance Measure Matrix (PMM) is used to measure and report our ongoing performance of critical processes leading to organizational success. This also monitors comparisons to VA and non-VA hospitals to monitor targets set by VHA, VISN5 and the facility. We use these reviews and third party assessments to identify opportunities for improvement. The DCVAMC Leadership Team guides the organization, plans for long-term sustainability, ensures effective self-governance, reviews performance, and creates a nurturing culture for operational excellence through the DCVAMC leadership system. This system focuses on balancing the needs of all stakeholders and establishes the foundation for overall leadership excellence in setting and deploying DCVAMC mission, vision, and values. Senior leaders serve as strong role models as they implement the leadership system to set organization-wide direction in accordance with the vision, mission and values. Performance and quality improvement initiatives have been a major focus at the DCVAMC. Different models of improvement have been tried. DCVAMC will focus on the Lean model. The current infrastructure does not fully promulgate effective execution of performance or change activities, resulting in inefficiency of process, delays in organizational learning, and waste of resources. Although there is currently a Center for Performance Management that exists at the DCVAMC, its ability to enhance organizational performance and promote innovation or creativity is limited due to the lack of availability of dedicated personnel to Lean initiatives and expertise in analysis of large data driven from CPRS. As a part of the Patient Flow Collaborative, the DCVAMC was offered the option to participate in the second phase of the Bed Management System (BMS) roll out. We are currently in the process of planning for the implementation of this new software. The successful implementation of this software necessitates the redesign of the way we currently coordinate inpatient flow activities. This is the second area of focus in our proposal. By developing an Inpatient Center to focus on these activities, the DCVAMC will continue to improve on delivering patient-centered care by focusing on streamlining the admissions through discharge process to serve our Veteran patients better. The current VISN 5 network's enabling strategic goal is to deliver world-class service to veterans and their families by applying sound business principles that result in effective management of people, communications, technology, and governance. This contract for improvement through system redesign and Lean projects will help our facility achieve this strategic goal. This will be exemplified with the successful implementation of our proposed redesign project. 1.3 Objectives: The overall strategic plan for further enhancing DCVAMC's commitment to innovative performance improvement activities is divided into two areas: 1) support for enhancing our current Center for Performance Management through analysis of data from CPRS and from Veteran Administration Informatics and Computing Infrastructure (VINCI), 2) the facilitation of Lean projects to improve care using data available through previous step. 1.4 Scope: The contractor shall provide two services: data analysis and improvement facilitation. These services are described in the following: "Data analysis. The data analysis shall rely on data mining techniques and artificial intelligence for analysis of large massive databases, including text analysis. The expected number of unique patients to be analyzed is 600,000 cases. For each patient, 5 years of CPRS data are available. In addition, many data items, including simple items such as weight are text fields that require complex artificial intelligence techniques for analysis of the data. In particular, the contractor shall use Guided Bayesian approach described in previous collaboration as their method of analysis. In conducting these analysis, the contractor shall rely on remote access to the data servers within VA and shall not transfer the data outside of the VA facilities. This effort will have the following components: oClassification of text in Hospice Consults notes within CPRS for patients in DC VA oExamination of methods of measuring severity of illness based on claims data and laboratory findings. oExamination of reason for readmission within 30 days. oExamination of trajectory to death for severely ill patients oExamination of clinical visits that could have been avoided through telemedicine or other remote contacts "Facilitation of Improvement Efforts. The contract shall use the data analysis accomplished to implement Lean projects within VADCMC. At a minimum the following efforts will be undertaken: oDescription of the extent of the problem using patient outcomes. oTraining of clinicians/managers within VA in Lean improvement efforts. oFacilitation of at least 4 Lean improvement projects that examine a clinical decision and design new care protocols that avoid wasted effort and improve patient outcomes. 1.5Period of Performance: The period of performance shall be for one year. 1.6 General Information 1.6.1 Quality Control: The contractor shall develop and maintain an effective quality control program to ensure services are performed in accordance with this PWS. The contractor shall develop and implement procedures to identify, prevent, and ensure non-recurrence of defective services. The contractor's quality control program is the means by which he assures himself that his work complies with the requirement of the contract. Within 30 days after contract award, three copies of a comprehensive written QCP shall be submitted to the KO and COR, within 5 working days when changes are made thereafter. After acceptance of the quality control plan the contractor shall receive the contracting officer's acceptance in writing of any proposed change to his QC system. 1.6.2 Quality Assurance: The government shall evaluate the contractor's performance under this contract in accordance with the Quality Assurance Surveillance Plan. This plan is primarily focused on what the Government must do to ensure that the contractor has performed in accordance with the performance standards. It defines how the performance standards will be applied, the frequency of surveillance, and the minimum acceptable defect rate(s). The government's evaluation is focused on deliverable milestones. 1.6.3 Recognized Holidays: The contractor is not required to perform services during holidays which include: New Year's DayLabor Day Martin Luther King Jr.'s BirthdayColumbus Day President's DayVeteran's Day Memorial DayThanksgiving Day Independence DayChristmas Day 1.6.4 Hours of Operation: The contractor is responsible for conducting business, between the hours of 7:30 to 5:30 Monday through Friday except Federal holidays or when the Government facility is closed due to local or national emergencies, administrative closings, or similar Government directed facility closings. For other than firm fixed price contracts, the contractor will not be reimbursed when the government facility is closed for the above reasons. The Contractor must at all times maintain an adequate workforce for the uninterrupted performance of all tasks defined within this PWS when the Government facility is not closed for the above reasons. When hiring personnel, the Contractor shall keep in mind that the stability and continuity of the workforce are essential. 1.6.5 Place of Performance: The work to be performed under this contract will be performed at DCVAMC or using Telework provisions at DCVAMC. 1.6.6 Type of Contract: The government will award a firm fixed price contract. 1.6.7 Security Requirements: Must maintain the level of security required by the contract for the life of the contract. The security requirements are in accordance with the DD254 as issued by DCVAMC. 1.6.7.1 PHYSICAL Security: The contractor shall be responsible for safeguarding all government equipment, information and property provided for contractor use. At the close of each work period, government facilities, equipment, and materials shall be secured. 1.6.7.2 Key Control. The Contractor shall establish and implement methods of making sure all keys/key cards issued to the Contractor by the Government are not lost or misplaced and are not used by unauthorized persons. NOTE: All references to keys include key cards. No keys issued to the Contractor by the Government shall be duplicated. The Contractor shall develop procedures covering key control that shall be included in the Quality Control Plan. Such procedures shall include turn-in of any issued keys by personnel who no longer require access to locked areas. The Contractor shall immediately report any occurrences of lost or duplicate keys/key cards to the Contracting Officer. 1.6.7.2.1. In the event keys, other than master keys, are lost or duplicated, the Contractor shall, upon direction of the Contracting Officer, re-key or replace the affected lock or locks; however, the Government, at its option, may replace the affected lock or locks or perform re-keying. When the replacement of locks or re-keying is performed by the Government, the total cost of re-keying or the replacement of the lock or locks shall be deducted from the monthly payment due the Contractor. In the event a master key is lost or duplicated, all locks and keys for that system shall be replaced by the Government and the total cost deducted from the monthly payment due the Contractor. 1.6.7.2.2. The Contractor shall prohibit the use of Government issued keys/key cards by any persons other than the Contractor's employees. The Contractor shall prohibit the opening of locked areas by Contractor employees to permit entrance of persons other than Contractor employees engaged in the performance of assigned work in those areas, or personnel authorized entrance by the Contracting Officer. 1.6.8 Special Qualifications: The contractor is responsible for ensuring all employees possess and maintain current Information Security levels. 1.6.9 Post Award Conference/Periodic Progress Meetings: The Contractor agrees to attend any post award conference convened by the contracting activity or contract administration office in accordance with Federal Acquisition Regulation Subpart 42.5. The contracting officer, Contracting Officers Representative (COR), and other Government personnel, as appropriate, may meet periodically with the contractor to review the contractor's performance. At these meetings the contracting officer will apprise the contractor of how the government views the contractor's performance and the contractor will apprise the Government of problems, if any, being experienced. Appropriate action shall be taken to resolve outstanding issues. These meetings shall be at no additional cost to the government. 1.6.10 Contracting Officer Representative (COR): The (COR) will be identified by separate letter. The COR monitors all technical aspects of the contract and assists in contract administration The COR is authorized to perform the following functions: assure that the Contractor performs the technical requirements of the contract: perform inspections necessary in connection with contract performance: maintain written and oral communications with the Contractor concerning technical aspects of the contract: issue written interpretations of technical requirements, including Government drawings, designs, specifications: monitor Contractor's performance and notifies both the Contracting Officer and Contractor of any deficiencies; coordinate availability of government furnished property, and provide site entry of Contractor personnel. A letter of designation issued to the COR, a copy of which is sent to the Contractor, states the responsibilities and limitations of the COR, especially with regard to changes in cost or price, estimates or changes in delivery dates. The COR is not authorized to change any of the terms and conditions of the resulting order. 1.6.11 Key Personnel: The follow personnel are considered key personnel by the government: Doctor Janusz Wojtusiak. The contractor shall provide a contract manager capable of data analysis who shall be responsible for the performance of the work. The name of this person and an alternate who shall act for the contractor when the manager is absent shall be designated in writing to the contracting officer and could be Doctor Janusz Wojtusiak. The contract manager or alternate shall have full authority to act for the contractor on all contract matters relating to daily operation of this contract. The contract manager or alternate shall be available between 7:30 a.m. to 4:30p.m., Monday thru Friday except Federal holidays or when the government facility is closed for administrative reasons. Qualifications for all key personnel are listed below: The key personnel and the contract manager and alternate must have (1) terminal degrees (Ph.D. or MD), (2) a history of at least 2 publications in areas directly relevant to the project, and (3) have at least 5 or more years of data mining experience or quality improvement efforts. 1.6.12 Identification of Contractor Employees: All contract personnel attending meetings, answering Government telephones, and working in other situations where their contractor status is not obvious to third parties are required to identify themselves as such to avoid creating an impression in the minds of members of the public that they are Government officials. They must also ensure that all documents or reports produced by contractors are suitably marked as contractor products or that contractor participation is appropriately disclosed. Contract personnel are not required to obtain and wear badges in the performance of this service. 1.6.14 Other Direct Costs: This category includes reproduction and publishing costs, shipping expenses associated with training activities and visits to contractor facilities. It could also entail the renting of suitable training venues. 1.6.15 Data Rights: The Government has unlimited rights to all documents/material produced under this contract. All documents and materials, to include the source codes of any software, produced under this contract shall be Government owned and are the property of the Government with all rights and privileges of ownership/copyright belonging exclusively to the Government. These documents and materials may not be used or sold by the contractor without written permission from the Contracting Officer. All materials supplied to the Government shall be the sole property of the Government and may not be used for any other purpose. This right does not abrogate any other Government rights. 1.6.16 Organizational Conflict of Interest: Contractor and subcontractor personnel performing work under this contract may receive, have access to or participate in the development of proprietary or source selection information (e.g., cost or pricing information, budget information or analyses, specifications or work statements, etc.) or perform evaluation services which may create a current or subsequent Organizational Conflict of Interests (OCI) as defined in FAR Subpart 9.5. The Contractor shall notify the Contracting Officer immediately whenever it becomes aware that such access or participation may result in any actual or potential OCI and shall promptly submit a plan to the Contracting Officer to avoid or mitigate any such OCI. The Contractor's mitigation plan will be determined to be acceptable solely at the discretion of the Contracting Officer and in the event the Contracting Officer unilaterally determines that any such OCI cannot be satisfactorily avoided or mitigated, the Contracting Officer may effect other remedies as he or she deems necessary, including prohibiting the Contractor from participation in subsequent contracted requirements which may be affected by the OCI. 1.6.17 PHASE IN /PHASE OUT PERIOD: To minimize any decreases in productivity and to prevent possible negative impacts on additional services, the Contractor shall have personnel on board, during the 30 day phase in/ phase out periods. During the phase in period, the Contractor shall become familiar with performance requirements in order to commence full performance of services on the contract start date. ACORAlternate Contracting Officer's Representative AFARSArmy Federal Acquisition Regulation Supplement ARArmy Regulation CCEContracting Center of Excellence CFRCode of Federal Regulations CONUSContinental United States (excludes Alaska and Hawaii) CORContracting Officer Representative COTRContracting Officer's Technical Representative COTSCommercial-Off-the-Shelf DADepartment of the Army DD250 Department of Defense Form 250 (Receiving Report) DD254Department of Defense Contract Security Requirement List DFARSDefense Federal Acquisition Regulation Supplement DMDCDefense Manpower Data Center DODDepartment of Defense FARFederal Acquisition Regulation HIPAAHealth Insurance Portability and Accountability Act of 1996 KOContracting Officer OCIOrganizational Conflict of Interest OCONUSOutside Continental United States (includes Alaska and Hawaii) ODC Other Direct Costs PIPOPhase In/Phase Out POCPoint of Contact PRSPerformance Requirements Summary PWSPerformance Work Statement QAQuality Assurance QAPQuality Assurance Program QASPQuality Assurance Surveillance Plan QCQuality Control QCPQuality Control Program TETechnical Exhibit 3. GOVERNMENT FURNISHED ITEMS AND SERVICES: 3.1. Services: The Government will provide (a) data servers, (b) Telework software, (c) in some instances loaned computers, (d) data that cannot be taken out of VA, and (e) personnel to assist with these services. 3.2 Facilities: The Government will provide computing and training facilities for the personnel to work from. These facilities could be arranged through Telework. If in person, the facility will include work space, desk, communication equipment, and other items necessary to maintain an office environment. 3.3 Utilities: The Government will provide all utilities in the VA facility provided to the contractor. All work shall be done on government computers or through Telework. The Contractor shall instruct employees in utilities conservation practices. The contractor shall be responsible for operating under conditions that preclude the waste of utilities, which include turning off the water faucets or valves after using the required amount to accomplish cleaning vehicles and equipment. 3.4 Equipment: The Government will provide computers for Telework, if these are conducive to completion of the contract. 3.5 Materials: The Government will provide Standard Operating Procedures and Policies. 4. CONTRACTOR FURNISHED ITEMS AND RESPONSIBILITIES: 4.1 General: The Contractor shall furnish all supplies, equipment, facilities and services required to perform work under this contract that are not listed under Section 3 of this PWS. 5. Specific Tasks: 5.1. Basic Services. 5.1.1. Data analysis. The data analysis shall rely on data mining techniques and artificial intelligence for analysis of large massive databases, including text analysis. The expected number of unique patients to be analyzed is 600,000 cases. For each patient, 5 years of CPRS data are available. In addition, many data items, including simple items such as weight are text fields that require complex artificial intelligence techniques for analysis of the data. In particular, the contractor shall use Guided Bayesian approach described in previous collaboration as their method of analysis. In conducting these analysis, the contractor shall rely on remote access to the data servers within VA and shall not transfer the data outside of the VA facilities. This effort will have the following components: "Classification of text in Hospice Consults notes within CPRS for patients in DC VA. The analysis should describe the nature of consults, the recommended decision, the percentage of times the patient followed the consult, the frequency with which hospice patients were readmitted to the hospital and the factors that increase the need for hospice consults. "Examination of methods of measuring severity of illness based on claims data and laboratory findings. The effort should statistically compare the performance of established laboratory based key clinical findings to claims based severity/prognostic indicators. "Examination of reason for readmission within 30 days. The effort should analyze the factors that contribute to readmission and assess the probability of readmission at discharge. The effort should lead to design of an alert system within CPRS to inform discharge planners of unusual discharge requirements to prevent readmissions. "Examination of trajectory to death for severely ill patients. The project should examine 12 months prior to death and classify patients in groups that have distinct trajectory to death. "Examination of clinical visits that could have been avoided through telemedicine or other remote contacts. The project shall identify factors that could lead to increased access to appointments for primary or specialist care patients. 5.1.2. Facilitation of Improvement Efforts. The contract shall use the data analysis accomplished to implement Lean projects within VADCMC. At a minimum the following efforts will be undertaken: "Description of the extent of the problem using patient outcomes. The project shall rely on VA employee's description of problems and confirm these problems through analysis of CPRS data. "Training of clinicians/managers within VA in Lean improvement efforts. The project shall provide clinicians/managers with continuing education or university credits. It shall assist participating clinicians/managers in understanding how to proceed with Lean projects. "Facilitation of at least 4 Lean improvement projects that examine a clinical decision and design new care protocols that avoid wasted effort and improve patient outcomes. For each project, the facilitator shall meet with VA employees individually before group meeting and as a group during scheduled times to solicit their suggestions for change. The procedures to follow should include Lean procedures. 5.1.3. Preparation of manuscripts. The contractor shall conduct literature review and prepare the following manuscripts: 1.Paper on use of Hospice in VA 2.Paper on accuracy of methods for predicting patient's prognosis 3.Paper on reasons for readmission within 30 days for one index disease 4.Paper on trajectory of illness for one group of patients 5.Paper on clinical Lean procedures with examples from lessons learned at VA 6. APPLICABLE PUBLICATIONS (CURRENT EDITIONS) 6.1. The Contractor must abide by all applicable regulations, publications, manuals, and local policies and procedures. 6.2. Preparation of papers and submission of papers for publication shall follow the DC VA approval requirements and the target journal format and procedures.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/VA/VACNAC/VACNAC/Awards/VA245-13-C-0087.html)
 
Document(s)
Attachment
 
File Name: VA245-13-C-0087 VA-245-11-RP-0197 AWD.docx (https://www.vendorportal.ecms.va.gov/FBODocumentServer/DocumentServer.aspx?DocumentId=1125015&FileName=VA245-13-C-0087-000.docx)
Link: https://www.vendorportal.ecms.va.gov/FBODocumentServer/DocumentServer.aspx?DocumentId=1125015&FileName=VA245-13-C-0087-000.docx

 
Note: If links are broken, refer to Point of Contact above or contact the FBO Help Desk at 877-472-3779.
 
Record
SN03250815-W 20131214/131212234955-581f8878e10d49cb6b74b3e1eed24308 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.